![](https://webarchive.library.unt.edu/eot2008/20081111165725im_/http://www.epa.gov/epafiles/images/epafiles_misc_space.gif) |
|
Combined Sewer Overflows Elements of a Long Term Control Plan
The CSO Control Policy identifies the following essential elements of a long-term control plan:
- Characterization, monitoring, and modeling of the combined sewer system
- Public participation
- Consideration of sensitive areas
- Evaluation of alternatives to meet CWA requirements using either the "presumption approach" or the "demonstration approach"
- Cost/performance considerations
- Operational plan
- Maximizing treatment at the existing POTW treatment plant
- Implementation schedule
- Post-construction compliance monitoring program
EPA's Guidance for Long-Term Control Plan [PDF Format] provides guidance on the development and implementation of a long-term control plan.
|
|
|
|
![](https://webarchive.library.unt.edu/eot2008/20081111165725im_/http://www.epa.gov/epafiles/images/epafiles_misc_space.gif) |
![Adobe Acrobat Reader Icon](https://webarchive.library.unt.edu/eot2008/20081111165725im_/http://cfpub.epa.gov/npdes/images/adobe.gif) The documents on this site are best viewed with Acrobat 8.0 |
|