Former Filled Oxbows - Reports
Jump to Report Index
The following list of reports and documents has been selected to provide an overview of the environmental investigations and remedial actions conducted for the Oxbow Areas. Most of the available reports and documents were produced for General Electric by their environmental consultants. These reports are available for viewing at the project's public repositories including the Berkshire Athenaem Public Library in Pittsfield, Massachusetts.
- Lyman Street Area and Former Filled Oxbow B
- Former Filled Oxbows A and C
- Newell Street Area I
- Newell Street Area II
- Former Filled Oxbows J and K
- General
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.
Lyman Street Area and Former Filled Oxbow B
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), September 17, 2008, Re: Lyman Street Area Summary of August 2008 Inspection Activities (PDF) (33 pp., 778 KB)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 27, 2008, Re: Lyman Street Area Summary of July 2008 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (15 pp., 1.54 MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 18, 2008, Re: Lyman Street Area Summary of May 2008 Inspection Activities (PDF) (31 pp., 805 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 21, 2007, Re Lyman Street Area Summary of 2007 Condtional Solution Inspection Activites (PDF) (12 pp., 144 K)
- Letter (with report) from Gates (GE) to Tagliaferro (USEPA), December 13, 2007, Re: Lyman Street Area Summary of December 2007 Inspection Activities (PDF) (8 pp., 420 KB)
- Letter (with report) from Gates (GE) to Tagliaferro (USEPA), November 21, 2007, Re: Lyman Street Area, Summary of October 2007 Inspection Activities (PDF) (10 pp., 352 KB)
- Letter from Tagliaferro (USEPA) to Gates (GE), July 12, 2007, Re: Approval of General Electric's July 11, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; Construction of Infiltration Area (PDF) (2 pp., 31 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Lyman Street Area, Summary of May 2007 Inspection Activities (PDF) (11 pp., 570 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Lyman Street Area - Properties East of Lyman Street Construction of Infiltration Area (PDF) (4 pp., 564 KB)
- Letter from Tagliaferro (USEPA) to Gates (GE), June 8, 2007, Re: Conditional Approval of General Electric's May 22, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; EPA Requested Information and Analytical Data for Proposed Backfill Sources and General Electric's June 4, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; EPA Requested Information and Analytical Data for Proposed Topsoil Source (PDF) (2 pp., 36 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), June 4, 2007, Re: Lyman Street Area - Properties East of Lyman Street EPA Requested Information and Analytical Data for Proposed Topsoil Source (PDF) (7 pp., 1.32 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), May 22, 2007, Re: Lyman Street Area - Properties East of Lyman Street EPA Requested Information and Analytical Data for Proposed Backfill Sources (PDF) (11 pp., 2.4 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), April 25, 2007, Re: Lyman Street Area - Properties East of Lyman Street Supplemental Information Package Addendum (PDF) (5 pp., 1.21 MB)
- Letter from Tagliaferro (USEPA) to Gates (GE), April 16, 2007, Re: Conditional Approval of General Electric's March 29, 2007 submittal titled Lyman Street Area - Properties East of Lyman Street; Supplemental Information Package (PDF) (3 pp., 26 KB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), March 29, 2007, Re: Lyman Street Area - Properties East of Lyman Street Supplemental Information Package (PDF) (291 pp., 14.02 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Lyman Street Area Summary of November 2006 Inspection Activities (PDF) (10 pp., 428 KB)
- Letter from Tagliaferro (USEPA) to Silfer (GE), October 18, 2006, Re: Approval of General Electric's October 5, 2006 submittal titled Former Oxbow A & C, Former Oxbow J& K, and Lyman Street Area - Properties West of Lyman Street; Addendum to Supplemental Information Package (PDF) (2 pp., 95 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), October 5, 2006, Former Oxbow Areas A and C, Former Oxbow Areas J and K, Lyman Street Area - Properties West of Lyman Street Addendum to Supplemental Information Package (PDF) (32 pp., 1.72 MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 7, 2006, Conditional Approval of GE's June 15, 2006 Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area-Properties West of Lyman Street, Supplemental Information Package (PDF) (2 pp., 134 KB)
- Letter and attachments from Gates (GE) to Lovely (USEPA), June 15, 2006, Supplemental Information Package Former Oxbow Areas A and C, Former Oxbow Areas J and K, and Lyman Street Area - Properties West of Lyman Street (PDF) (478 pp., 18.8 MB)
- April 13, 2006 approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Approval of General Electric’s submittal titled Addendum to Final Removal Design/Removal Action Work Plan for Lyman Street Area (PDF) (2 pp., 56 KB)
- Addendum to Final Removal Design / Removal Action Work Plan for Lyman Street Area, April 4, 2006 (PDF) (30 pp., 1.35 MB)
- March 6, 2006 approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Conditional Approval of General Electric's submittal titled Final Removal Design/Removal Action Work Plan for the Lyman Street Area (PDF) (4 pp., 200 KB)
- Final Removal Design/Removal Action Work Plan for Lyman Street Area, Blasland, Bouck, & Lee, Inc., September 2005 (PDF) (146 pp., 7.1 MB)
- June 2, 2005 approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Approval of General Electric's submittal titled Conceptual Removal Design/Removal Action Work Plan Addendum for the Lyman Street Area (PDF) (3 pp., 66 KB)
- Conceptual Removal Design / Removal Action Work Plan Addendum for Lyman Street Area, Blasland, Bouck, & Lee, Inc., May 2005 (PDF) (245 pp., 10.6 MB)
- Letter Report from Silfer (GE) to Lovely (USEPA), January 28, 2005, Lyman Street Area Supplement to Conceptual Removal Design/Removal Action Work Plan (PDF) (6 pp., 2 MB)
- Letter from Lovely (USEPA) to Silfer (GE), February 10, 2005, Approval of GE's Lyman Street Area, Supplement to Conceptual Removal Design/Removal Action Area Work Plan (PDF) (3 pp., 67 KB)
- EPA's January 10, 2005 conditional approval of the Conceptual Removal Design/ Removal Action Work Plan for the Lyman Street Area (PDF) (3 pp., 148 KB)
- Conceptual
Removal Design/Removal Action Work Plan for Lyman Street
Area, Blasland,
Bouck & Lee, Inc. March 2004. Volumes I - V (PDF)
(1 p., 40KB)
Volumes I - V are internally linked from the table of contents. Combined file size is 25 mb - estimated download time for all files: 59 minutes @ 56 kbs. - Letter from Nalipinski (USEPA) to Silfer (GE), November 24, 2003, Comments on GE's October 31, 2003 submittal - Lyman Street Area Additional Supplemental Pre-Design Investigation Report (PDF) (1 p., 74 KB)
- Letter Report from Silfer (GE) to Olson (USEPA), October 31, 2003, Lyman Street Area Additional Supplemental Pre-Design Investigation Report (PDF) (34 pp., 5.8 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), September 9, 2003, Comments on GE's August 18, 2003 submittal re: Lyman Street Area Supplemental Pre-Design Soil Investigations, and Comments on GE's September 5, 2003 submittal Additional Supplemental Pre-Design Soil Investigations (PDF) (1 p., 75 KB)
- Letter from Silfer (GE) to Olson (USEPA), September 5, 2003, Lyman Street Area Additional Supplemental Pre-Design Soil Investigations (PDF) (4 pp., 1.3 MB)
- Letter Report from Silfer (GE) to Olson (USEPA), August 18, 2003, Lyman Street Area Supplemental Pre-Design Soil Investigations. (PDF) (59 pp., 484 kB)
- Letter from Nalipinski (USEPA) to Silfer (GE), June 20, 2003, Comments on GE's April 2003 submittal Pre-Design Investigation Report for the Lyman Street Removal Action (PDF) (2 pp., 155 KB)
- Pre-Design Investigation Report for the Lyman Street Area Removal Action (Vol 1), Blasland, Bouck & Lee, Inc. (Prepared for GE), April 2003. (PDF) (182 pp., 21 MB)
- Pre-Design Investigation
Report for the Lyman Street Area Removal Action (Vol 2), Blasland,
Bouck & Lee, Inc. (Prepared for
GE), April 2003.
- Part 1 (PDF) (269 pp., 12 MB)
- Part 2 (PDF) (138 pp., 19 MB)
- Pre-Design Investigation Report for the Lyman Street Area Removal Action (Vol 3), Blasland, Bouck & Lee, Inc. (Prepared for GE), April 2003. (PDF) (192 pp., 22 MB)
- Letter from Gates (GE) to Nalipinski (USEPA), March 13, 2003, Lyman Street Area Supplemental Pre-Design PCB Soil Sampling (PDF) (2 pp., 257 KB)
- Letter from Olson (USEPA) to Silfer (GE), July 25, 2002, Comments on GE's July 16, 2002 Lyman Street Area Pre-Design Investigation Work Plan Supplemental Information Letter. (PDF) (3 pp., 158 KB)
- Letter Report from Silfer (GE) to Olson (USEPA), July 16, 2002, Lyman Street Area Pre-Design Investigation Work Plan Supplemental Information Letter (PDF) (48 pp., 17 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), July 2, 2002, Comments on GE's March 2002 Pre-Design Investigation Work Plan for the Lyman Street Area Removal Action (PDF) (5 pp., 307 KB)
- Pre-Design Investigation Work Plan for the Lyman Street Area
Removal Action, Blasland, Bouck & Lee Inc. (Prepared for
GE), March 2002.
- Part 1 (PDF) (125 pp., 21 MB)
- Part 2 (PDF) (73 pp., 10 MB)
- Addendum to MCP Supplemental Phase II/RCRA Facility Investigation Proposal for Lyman Street/USEPA Area 5A Site, Volume I, Blasland, Bouck & Lee, Inc. (Prepared for GE), October 1997. Includes covers/TOCs for Volumes 2 through 5 (PDF) (123 pp., 13 MB)
- MCP Supplemental Phase II/RCRA Facility Investigation Report for Lyman Street/USEPA Area 5A Site, Blasland, Bouck & Lee, Inc. (Prepared for GE), June 1996. (PDF) (370 pp., 20 MB)
- MCP Phase I Report for Lyman Street Parking Lot (Oxbow Area D) and Current Assessment Summary for USEPA Area 5a, Blasland, Bouck & Lee, Inc. February 1994. Volumes I - IV. (PDF) (145 pp., 10 MB)
Former Filled Oxbows A and C
- Letter (with attachments) from Gates (GE) to Hull (USEPA), October 16, 2008, Re: Former Oxbow Areas A and C Summary of September 2008 Inspection Activities (PDF) (20 pp., 752 KB)
- Letter from Steenstrup (MDEP) to Tagliaferro (USEPA), May 21, 2008, Re: Former Oxbow Areas A and C Approval of Final Completion Report for Former Oxbow Areas A and C Removal Action (PDF) (1 p., 235 KB)
- Letter (with attachments) from Gates (GE) to Hull (USEPA), June 27, 2008, Re: Former Oxbow Areas A and C Summary of May 2008 Vegetation Inspection Activities (PDF) (20 pp., 775 KB)
- Letter from Fisher (USEPA) to Gates (GE), June 3, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for Former Oxbow Areas A and C Removal Action, dated May, 2008 (PDF) (3 pp., 89 KB)
- Letter from Gates (GE) to Fisher (USEPA), May 28, 2008, Re: Former Oxbow Areas A and C Final Completion Report for Former Oxbow Areas A and C Removal Action, Appendix C of Final Completion Report - Signed and Stamped (PDF) (5 pp., 4.69 MB)
- Letter (with report) from Gates (GE) to Fisher (USEPA), May 12, 2008, Re: Former Oxbow Areas A and C Final Completion Report for Former Oxbow Areas A and C Removal Action (PDF) (874 pp., 34.8 MB)
- Letter from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Former Oxbow Areas A and C Summary of 2007 Conditional Solution Inspection Activities (PDF) (11 pp., 767 KB)
- Letter (with report) from Gates (GE) to Fisher (USEPA), November 21, 2007, Re: Former Oxbow Areas A and C Summary of October 2007 Inspection Activities (PDF) (10 pp., 389 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Former Oxbow Areas A and C, Summary of May 2007 Inspection Activities (PDF) (11 pp., 783 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Former Oxbow Areas A and C Summary of November 2006 Inspection Activities (PDF) (10 pp., 462 KB)
- Letter from Tagliaferro (USEPA) to Silfer (GE), October 18, 2006, Re: Approval of General Electric's October 5, 2006 submittal titled Former Oxbow A & C, Former Oxbow J& K, and Lyman Street Area - Properties West of Lyman Street; Addendum to Supplemental Information Package (PDF) (2 pp., 95 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), October 5, 2006, Former Oxbow Areas A and C, Former Oxbow Areas J and K, Lyman Street Area - Properties West of Lyman Street Addendum to Supplemental Information Package (PDF) (32 pp., 1.72 MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 7, 2006, Conditional Approval of GE's June 15, 2006 Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area-Properties West of Lyman Street, Supplemental Information Package (PDF) (2 pp., 134 KB)
- Letter from Lovely (USEPA) to Silfer (GE), June 23, 2006, EPA's Approval of Revision to Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A & C (PDF) (2 pp., 51 KB)
- Letter and attachments from Gates (GE) to Lovely (USEPA), June 15, 2006, Supplemental Information Package Former Oxbow Areas A and C, Former Oxbow Areas J and K, and Lyman Street Area - Properties West of Lyman Street (PDF) (478 pp., 18.8 MB)
- Letter from Gates (GE) to Lovely (USEPA), June 13, 2006, Revision to Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (3 pp., 1.25 MB)
- Letter from Lovely (USEPA) to Silfer (GE), May 31, 2006, Conditional Approval of GE's submittal titled Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A & C (PDF) (2 pp., 67 KB)
- Second Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C, Blasland, Bouck & Lee, Inc., April 2006 (PDF) (193 pp., 10.3 MB)
- Letter from Lovely (USEPA) to Silfer (GE), February 17, 2006, Approval of GE's Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (2 pp., 68 KB)
- Letter from Lovely (GE) to Silfer (USEPA), January 17, 2006, Re: Conditional Approval of General Electric's submittal titled "Former Oxbows A & C Supplemental Sampling Plan" (PDF) (2 pp., 108 KB)
- Letter from Gates (GE) to Lovely (USEPA), November 2, 2005, Former Oxbow Areas A and C Supplemental Sampling Plan (PDF) (5 pp., 3.51 MB)
- Letter from Silfer (GE) to Lovely (USEPA), September 26, 2005, Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (3 pp., 208 KB)
- Letter from Lovely (USEPA) to Silfer (GE), August 30, 2005, Conditional Approval of GE's Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A & C (PDF) (2 pp., 100 KB)
- Final Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C, Blasland, Bouck, & Lee, Inc., July 2005 (PDF) (94 pp., 10 MB)
- Memorandum from Gates (GE) to Lovely (USEPA), May 19, 2005, Re: Former Oxbow Areas A and C - Parcel I8-23-6 (Recreational Portion) RD/RA Evaluations Assuming Absence of Existing Loam Pile (PDF) (155 pp., 14.12 MB)
- Conditional Approval of the Conceptual Removal Design/ Removal Action Work Plan for Former Oxbows A & C, April 6, 2005 (PDF) (2 pp., 100 KB)
- Letter from Lovely (USEPA) to Silfer (GE), April 6, 2005, Conditional Approval of General Electric's Conceptual Removal Design/Removal Action Work Plan for Former Oxbows A & C (PDF) (2 pp., 94 KB)
- Memorandum from Steenstrup (MDEP) to Lovely (USEPA), March 1, 2005, Comments on Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C (PDF) (4 pp., 224 KB)
- Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas A and C, January 2005 (PDF) (971 pp., 22 MB)
- Letter from Lovely (USEPA) to Silfer (GE), November 30, 2004, Approval of GE's Former Oxbows A & C Additional Supplemental Pre-Design Investigation Report (PDF) (2 pp., 76 KB)
- Letter from Silfer (GE) to Lovely (USEPA), October 29, 2004, Additional Supplemental PDI Report for Former Oxbow Areas A and C (PDF) (61 pp., 8.47 MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 1, 2004, Comments on GE's May 2004 Former Oxbows A & C Supplemental Pre-Design Investigation Report and Additional Sampling Proposal (PDF) (3 pp., 179 KB)
- Letter from Silfer (GE) to Nalipinski (USEPA), May 19, 2004, Supplemental PDI Report and Additional Sampling Proposal for Former Oxbow Areas A and C (PDF) (106 pp., 6.15 MB)
- Letter from Gates (GE) to Nalipinski (USEPA), April 6, 2004, Supplemental Pre-Design Investigation Report and EREs (PDF) (1 p., 108 KB)
- Letter from Nalipinski (USEPA) to Silfer (GE), December 1, 2003, Comments on GE's November 18, 2003 Submittal Former Oxbow Areas A and C Proposal for Additional Supplemental Pre-Design Soil Sampling (PDF) (1 p., 74 KB)
- Letter from Silfer (GE) to Olson (USEPA), November 18, 2003, Proposal for Additional Supplemental Pre-Design Soil Sampling for Former Oxbow Areas A and C (PDF) (3 pp., 2.7 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), October 20, 2003, Comments on GE's August 2003 Pre-Design Investigation Report for the Former Oxbows A and C Removal Action (PDF) (3 pp., 181 KB)
- Pre-Design Investigation Report for Former Oxbow Areas A and C Removal Action, Volumes 1 through 3, Blasland Bouck & Lee Inc. (Prepared for GE), August 2003
- Volume I - Report (PDF) (219 pp., 8.62 MB)
- Volume II - Appendices A-B (PDF) (295 pp., 16.43 MB)
- Volume III - Appendices B-C (PDF) (163 pp., 14.23 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), March 10, 2003, Comments on GE's February 2003 Addendum to Pre-Design Investigation Work Plan for the Former Oxbows A and C Removal Action (PDF) (2 pp., 92 KB)
- Letter from Silfer (GE) to Olson (USEPA), February 13, 2003, Addendum to Pre-Design Investigation Work Plan for Former Oxbow Areas A and C (PDF) (49 pp., 13.13 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), December 11, 2002, Comments on GE's May 2002 Pre-Design Investigation Work Plan for Former Oxbows A & C Removal Action (PDF) (4 pp., 313 KB)
- Pre-Design Investigation Work Plan for Former Oxbow Areas A and C Removal Action, Blasland Bouck & Lee Inc. (Prepared for GE), September 2002 (PDF) (263 pp., 19.37 MB)
- Immediate Response Completion Report Oxbow Area C, Blasland, Bouck, & Lee, Inc. December 1997. (PDF) (12 pp., 150 KB)
- MCP Phase I and Interim Phase II Report for Former Housatonic River Oxbow Areas A, B, C, J, and K, Volume 1, Blasland Bouck & Lee Inc. (Prepared for GE), February 1996 (PDF) (214 pp., 18.08 MB)
- MCP Phase I and Interim Phase II Report for Former Housatonic River Oxbow Areas A, B, C, J, and K, Volume 2, Blasland Bouck & Lee Inc. (Prepared for GE), February 1996 (PDF) (570 pp., 19.32 MB)
Newell Street Area I
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2008, Re: Newell Street Area I Summary of August 2008 Inspection Activities (PDF) (24 pp., 348 KB)
- Letter (with enclosure) from Fisher (USEPA) to Gates (GE), August 27, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for the Newell Street Area I Removal Action, dated July 2008 (3 p., 125 KB)
- Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), August 21, 2008, Re: Newell Street Area I Approval of Final Completion Report for the Newell Street Area I Removal Action (PDF) (1 p., 226 KB)
- Letter (with report) from Gates (GE) to Tagliaferro (USEPA), July 31, 2008, Re: Newell Street Area I Final Completion Report for the Newell Street Area I Removal Action (PDF) (1930 pp., 129.84 MB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 13, 2008, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcel J9-23-24 (PDF) (4 pp., 79 KB)
- Letter (w/report) from Gates (GE) to Fisher (USEPA), June 12, 2008, Re: Newell Street Area I Summary of May 2008 Inspection Activities (PDF) (24 pp., 361 KB)
- Letter from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Newell Street Area I Summary of 2007 Conditional Solution Inspection Activities (PDF) (14 pp., 153 KB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), December 5, 2007, Re: Newell Street Area I; Summary of October/November 2007 Inspection Activities (PDF) (22 pp., 5.83 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Newell Street Area I Summary of May 2007 Inspection Activities (PDF) (15 pp., 939 KB)
- Letter, with attached report, from Gates (GE) to Tagliaferro (USEPA), June 29, 2007, Re: Newell Street Area I, Summary of Annual ERE Inspection for Parcel J9-23-24 (PDF) (4 pp., 80 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 4, 2007, Newell Street Area I Summary of 2006 Conditional Solution Inspection Activities (PDF) (14 pp., 164 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Newell Street Area I Summary of November 2006 Inspection Activities (PDF) (15 pp., 428 KB)
- Letter from Gates (GE) to Lovely (USEPA), July 6, 2006, Summary of May 2006 Inspection Activities (PDF) (15 pp., 297 KB)
- Letter from Gates (GE) to Lovely (USEPA), February 10, 2006, Newell Street Area I Summary of December 2005 Inspection Activities, SDMS 244882 (PDF) (15 pp., 246 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MDEP), October 25, 2005, Ambient Air Monitoring Data (PDF) (26 pp., 1.3 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), June 22, 2004, Newell Street Area I Restoration of Parcel J9-23-22. (PDF) (8 pp., 2.25 MB)
- Letter from Gates (GE) to Nalipinski (USEPA), May 28, 2004, Newell Street Area I Second Revision to Post-Remediation PCB Evaluations for Parcel J9-23-22. (PDF) (24 pp., 1.14 MB)
- Letter from Gates (GE) to Nalipinski (USEPA), May 25, 2004, Newell Street Area I Revised Post-Remediation PCB Evaluations for Parcel J9-23-22. (PDF) (18 pp., 1.23 MB)
- Letter from Olson (USEPA) to Silfer (GE), October 9, 2003, Approval of GE's Removal Design/Removal Action Work Plan for Newell Street Area I. (PDF) (1 p., 69 KB)
- Newell Street Area I Final Removal Design/Removal Action Work Plan - Supplemental Information Package, Blasland, Bouck & Lee, Inc. (Prepared for GE), September 2003 (PDF) (379 pp., 14.33 MB)
- Letter from Olson (USEPA) to Silfer (GE), September 15, 2003, Conditional Approval of GE's August 4, 2003 Removal Design/Removal Action Work Plan for Newell Street I. (PDF) (2 pp., 135 KB)
- Newell Street Area 1 Final Removal Design/Removal Action Work Plan, Blasland, Bouck & Lee, Inc. (Prepared for GE), August 2003 (PDF) (179 pp., 13.91 MB)
- Letter from Olson (USEPA) to Silfer (GE), May 13, 2003, Approval of GE's April 17, 2003 Conceptual RD/RA Work Plan Addendum for the Newell Street 1 Area. (PDF) (1 p., 60 KB)
- Conceptual RD/RA Work Plan Addendum for Newell Street Area I, Blasland, Bouck & Lee, Inc. (Prepared for GE), April 2003.
- Volume 1 (PDF) (97 pp., 6.67 MB)
- Volume 2 (PDF) (219 pp., 18.11 MB)
- Volume 3 (PDF) (261 pp., 19.63 MB)
- Volume 4 (PDF) (283 pp., 18.53 MB)
- Volume 5 (PDF) (113 pp., 3.73 MB)
- Letter from Olson (USEPA) to Silfer (GE), August 26, 2002, Conditional Approval of GE's August 20, 2002 Newell Street Area I Revised Proposal for Supplemental Pre-Design Soil Investigations. (PDF) (1 p., 92 KB)
- Letter from Gates (GE) to Olson (USEPA), August 20, 2002, Newell Street Area I Revised Proposal for Supplemental Pre-Design Investigations. (PDF) (29 pp., 2.2 MB)
- Letter from Olson (USEPA) to Silfer (GE), August 5, 2002, Conditional Approval of GE's July 2002 Newell Street Area I Proposal for Supplemental Pre-Design Soil Investigations. (PDF) (3 pp., 202 KB)
- Letter (with BBL figures) from Gates (GE) to Olson (USEPA), July 3, 2002, Newell Street Area I Proposal for Supplemental Pre-Design Soil Investigation. (PDF) (18 pp., 3.68 MB)
- Letter from Olson (USEPA) to Silfer (GE), May 24, 2002, Comments on GE's December 2001 Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I. (PDF) (6 pp., 569 KB)
- Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I - Vol I, Blasland, Bouck & Lee, Inc. (Prepared for GE), January 2002. (PDF) (117 pp., 4.39 MB)
- Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I - Vol II, Blasland, Bouck & Lee, Inc. (Prepared for GE), January 2002. (PDF) (272 pp., 14.77 MB)
- Conceptual Removal Design/Removal Action Work Plan for Newell Street Area I - Vol III, Blasland, Bouck & Lee, Inc. (Prepared for GE), January 2002. (PDF) (9 pp., 11.86 MB)
- Letter from Silfer (GE) to Olson (USEPA), August 1, 2001, Newell Street Area I, Parcel J9-23-26 (Lakewood Playground) - Report on Additional Soil Sampling Results. (PDF) (4 pp., 537 KB)
- Letter from Gates (GE) to Olson (USEPA), June 29, 2001, Newell Street Area I, Supplement to Pre-Design Investigation Report. (PDF) (4 pp., 1.79 MB)
- Letter from Olson (USEPA) to Silfer (GE), June 28, 2001, Newell Street Area I Supplemental Pre-Design Investigation Results and Proposal for Additional Soil Sampling at Parcel J9-23-26 (Lakewood Playground) (PDF) (2 pp., 96 KB)
- Letter from Silfer (GE) to Olson (USEPA), June 19, 2001, Newell Street Area I Supplemental Pre-Design Investigation Results and Proposal for Additional Soil Sampling at Parcel J9-23-26 (Lakewood Playground). (PDF) (7 pp., 4.62 MB)
- Letter from Olson (USEPA) to Silfer (GE), April 12, 2001, Newell Street Area I - Supplemental Pre-Design Investigation Proposal for Parcel J9-23-26 (Hibbard Playground). (PDF) (1 p., 50 KB)
- Letter from Silfer (GE) to Olson (USEPA), April 9, 2001, Newell Street Area I Supplemental Pre-Design Investigation Proposal for Parcel J9-23-26 (Hibbard Playground) (PDF) (11 pp., 2.41 MB)
- Letter from Olson (USEPA) to Silfer (GE), January 11, 2001, Conditional Approval of GE's December 1, 2000 Submittal "Addendum to Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action". (PDF) (2 pp., 82 KB)
- Addendum to Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action, Blasland, Bouck & Lee, Inc. (Prepared for GE), December 2000. (PDF) (8 pp., 523 KB)
- Letter from Olson (USEPA) to Silfer (GE), November 16, 2000, Conditional Approval of GE's March 6, 2000 Submittal "Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action” (PDF) (2 pp., 136 KB)
- Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action, Blasland, Bouck & Lee, Inc. (Prepared for GE), March 2000. (PDF) (76 pp., 2 MB)
- Ambient Air Monitoring for PCB, July 7, 1996 through September 27, 1996, 191 Newell Street, GE, Pittsfield, MA, Berkshire Environmental Consultants, Inc. (Prepared for GE), September 1997 (PDF) (29 pp., 1.47 MB)
- MCP Supplemental Phase II Report for the Newell Street 1 Site, Blasland, Bouck, & Lee, Inc. (Prepared for GE), September 1997. (PDF) (160 pp., 11.92 MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 1, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (156 pp., 9.57 MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 2, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (217 pp., 7.65 MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 3, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (32 pp., 9.53 MB)
- MCP Interim Phase II Report for the Newell Street Site, Volume 4, Blasland & Bouck Engineers (Prepared for GE), February 1992 (PDF) (236 pp., 13.74 MB)
- Short-Term Measures Proposal Newell Street Site, Pittsfield, Massachusetts, Geraghty & Miller (Prepared for GE), December 1990. (PDF) (122 pp., 18.38 MB)
- Short Term Measure (STM) Newell Street Marchetto Property, Quality Printing and Response to Superseding Order of Conditions File 263-310, October 1990. (PDF) (35 pp., 4.64 MB)
Newell Street Area II
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 16, 2008, Re: Newell Street Area II Summary of September 2008 Inspection Activities (PDF) (67 pp., 897 KB)
- Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 16, 2008, Re; Newell Street Area II, Second Addendum to Final Removal Design/Removal Action Work Plan (PDF) (44 pp., 1.68 MB)
- Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 27, 2008, Re: Newell Street Area II Summary of July 2008 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (15 pp., 1.56 MB)
- Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 27, 2008, Re: Newell Street Area II Summary of May 2008 Inspection Activities (PDF) (67 pp., 3.17 MB)
- Letter from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Newell Street Area II Summary of 2007 Conditional Solution Inspection Activities (PDF) (8 pp., 139 KB)
- Letter (with report) from Gates (GE) to Fisher (USEPA), November 7, 2007, Re: Newell Street Area II Summary of October 2007 Inspection Activities (PDF) (17 pp., 1.31 MB)
- Letter from Gates (GE) to Young (MEOEA), October 2, 2007, Re: Newell Street Area II, Summary of September 2007 Inspection of the Natural Resource Restoration/Enhancement Area (PDF) (12 pp., 977 KB)
- Letter from Gates (GE) to Young (MEOEA), August 3, 2007, Re: Newell Street Area II, Summary of June 2007 Inspection of the Natural Resource Restoration/Enhancement Area (PDF) (14 pp., 1.09 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Newell Street Area II, Summary of May 2007 Inspection Activities (PDF) (17 pp., 1.02 MB)
- Letter from Gates (GE) to Young (MEOEA), June 5, 2007, Re: Newell Street Area II, Completion of Installation of Restoration Work Report (PDF) (12 pp., 2.16 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 19, 2007, Newell Street Area II Notification of Extension of Storage Limit (PDF) (4 pp., 286 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Newell Street Area II Summary of November 2006 Inspection Activities (PDF) (15 pp., 425 KB)
- Newell Street Area II Proposal for Engineered Barrier Modifications, Blasland, Bouck & Lee, Inc., May 2006 (PDF) (44 pp., 5.58 MB)
- EPA Response to GE Proposal for Additional Removal Activities (PDF) (2 pp., 75 KB)
- GE Proposal for Additional Removal Activities (PDF) (5 pp., 390 KB)
- Letter from Silfer (GE) to Lovely (USEPA), December 20, 2005, Newell Street Area II Subsurface Investigation Summary Report (PDF) (41 pp., 3.7 MB)
- Subsurface Investigation Summary Report, 12/20/2005 (PDF) (44 pp., 4.7 MB)
- Letter from Gates (GE) to Lovely (USEPA), November 22, 2005, Newell Street Area II Supplemental Information Package-Analytical Data for Proposed Topsoil Source (PDF) (5 pp., 459 KB)
- EPA Response to GE Letter Regarding Proposal for Test Trenching Activities and Test Trenching Proposal with accompanying figures (PDF) (11 pp., 2 MB)
- Letter from Silfer (GE) to Lovely (USEPA), October 31, 2005, Newell Street Area II Proposal for Test Trenching Activities (PDF) (8 pp., 1.8 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MDEP), October 25, 2005, Ambient Air Monitoring Data (PDF) (26 pp., 1.3 MB)
- Letter from Czelusniak (WESTON) to Tagliaferro (USEPA), October 11, 2005, Air Monitoring Plan, GE Oversight-Newell Street Area II RAA (PDF) (36 pp., 1.78 MB)
- Newell Street Area II: Geophysical Survey Proposal and Discussion (PDF) (2 pp., 90 KB)
- Newell Street Area II - Proposal for Geophysical Survey at Parcel J9-23-8 (PDF) (8 pp., 387 KB)
- Newell Street Area II PCB Air Monitoring Results, June 05 - March 06 (PDF) (11 pp., 53 KB)
- Letter from Lovely (USEPA) to Silfer (GE), July 12, 2005, Conditional Approval of Supplemental Information Package for Newell Street Area II (PDF) (2 pp., 85 KB)
- Letter from Silfer (GE) to Lovely (USEPA), June 24, 2005, Newell Street Area II Supplemental Information Package. (PDF) (71 pp., 4.7 MB)
- Letter from Lovely (USEPA) to Silfer (GE), June 9, 2005, EPA's Approval in Part of GE's submittal Final RD/RA Work Plan Addendum for Newell Street II (PDF) (2 pp., 95 KB)
- Letter from Silfer (GE) to Lovely (USEPA), May 25, 2005, Final Removal Design/Removal Action Work Plan Addendum for Newell Street Area II (PDF) (14 pp., 1.1 MB)
- EPA's approval of GE's Newell Street Area II proposed changes to the engineered barrier modifications (PDF) (2 pp., 49 KB)
- Newell Street Area II Map (PDF) (1 p., 840 KB)
- EPA's May 12, 2005 conditional approval of the Final Removal Design/ Removal Action Work Plan for Newell Street Area II (PDF) (2 pp., 123 KB)
- The Final Removal Design/Removal Action Work Plan for Newell Street Street Area II, March 2005 (PDF) (154 pp., 7.8 MB)
- November 4, 2004 conditional approval of the Conceptual Removal Design/ Removal Action Work Plan for Newell Street Area II (PDF) (3 pp., 137 KB)
- Conceptual Removal
Design/Removal Action Work Plan for Newell Street Area II,
Table of Contents, July 2004 (PDF)
(1 p., 40 KB)
Volumes I - V are internally linked from the table of contents. Combined file size is 19 mb - estimated download time: 45 minutes @ 56 kbs. - Letter from Nalipinski (USEPA) to Silfer (GE), March 16, 2004, Approval of GE's March 2, 2004 Submittal "Newell Street II Supplemental Sampling Proposal to Support Future Remedial Design/Remedial Action Activities" (PDF) (1 p., 120 KB)
- Letter from Gates (GE) to Nalipinski (USEPA), March 2, 2004, Supplemental Sampling Proposal to Support Future Removal Design/Removal Action Activities for Newell Street Area II (PDF) (11 pp., 8.34 MB)
- Letter from Olson (USEPA) to Silfer (GE), October 2, 2003, Conditional Approval of GE's August 2003 Newell Street Area II Supplemental Pre-Design Investigation Report (PDF) (1 p., 99 KB)
- Letter from Silfer (GE) to Olson (USEPA), August 12, 2003, Supplemental Pre-Design Investigation Report for Newell Street Area II (PDF) (52 pp., 5.92 MB)
- Letter from Olson (USEPA) to Silfer (GE), May 13, 2003, Conditional Approval of GE's May 5, 2003 Response to EPA's April 21, 2003 Conditional Approval Letter for the Pre-Design Soil Investigation Report for Newell Street Area II. (PDF) (1 p., 68 KB)
- Letter from Silfer (GE) to Olson (USEPA), May 5, 2003, Response to EPA's April 21, 2003 Conditional Approval Letter for Pre-Design Investigation Report for Newell Street Area II (PDF) (10 pp., 1.93 MB)
- Letter from Olson (USEPA) to Silfer (GE), April 21, 2003, Conditional Approval of GE's February 2003 Pre-Design Investigation Report for Newell Street Area II Removal Action (PDF) (3 pp., 237 KB)
- Letter from Olson (USEPA) to Silfer (GE), August 21, 2002, Conditional Approval of GE's May 2002 Newell Street Area II Predesign Investigation Work Plan Addendum (PDF) (4 pp., 266 KB)
- Letter from Silfer (GE) to Olson (USEPA), May 21, 2002, Newell Street Area II Pre-Design Investigation Work Plan Addendum (PDF) (54 pp., 9.97 MB)
- Letter from Olson (USEPA) to Silfer (GE), April 18, 2002, Comments on GE's October 2001 Pre-Design Investigation Work Plan for the Newell Street Area II Removal Action (PDF) (3 pp., 264 KB)
- Pre-Design Investigation Report for Newell Street Area II, Volumes 1 and 2, Blasland Bouck & Lee Inc. (Prepared for GE), February 2003
- Vol I Part 1 (PDF) (82 pp., 14.28 MB)
- Vol I Part 2 (PDF) (51 pp., 14.41 MB)
- Vol II Part 1 (PDF) (204 pp., 21.89 MB)
- Vol II Part 2 (PDF) (114 pp., 19.74 MB)
- Pre-Design Investigation Work Plan for the Newell Street Area II Removal Action, Blasland Bouck & Lee, Inc. (Prepared for GE), October 2001
- Part 1 (PDF) (154 pp., 17.68 MB)
- Part 2 (PDF) (190 pp., 17.03 MB)
- Letter from Silfer (GE) to Olson (USEPA), July 16, 2001, Lyman Street Area and Newell Street Area II Remediation of GE Parking Lot Areas. (PDF) (2 pp., 153 KB)
- Letter from Tagliaferro (USEPA) to Silfer (GE), July 22, 1999, Status of Newell Street II Source Control Activities (PDF) (2 pp., 89 KB)
- Geophysical Investigation, General Electric Newell Street Parking Lot Site, Geophysics GPR International, Inc. (Prepared for Blasland Bouck & Lee Inc), May 1996. (PDF) (34 pp., 4.52 MB)
- MCP Interim Phase II Report for Newell Street Parking Lot Site and Current Assessment Summary for USEPA Area 5B, Blasland Bouck & Lee Inc. (Prepared for GE), March 1994, Volumes 1 - 4
- Vol 1 (PDF) (169 pp., 20.82 MB)
- Vol 2 (PDF) (62 pp., 8.66 MB)
- Vol 3 Part 1 (PDF) (230 pp., 20.4 MB)
- Vol 3 Part 2 (PDF) (395 pp., 21.43 MB)
- Vol 4 (PDF) (183 pp., 8.34 MB)
Former Filled Oxbows J and K
- Letter (with attachments) from Gates (GE) to Hull (USEPA), September 16, 2008, Re: Former Oxbow Areas J and K Summary of August 2008 Inspection Activities (PDF) (29 pp., 776 KB)
- Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), May 21, 2008, Re: Former Oxbow Areas J and K Approval of Final Completion Report for Former Oxbow Areas J and K Removal Action (PDF) (1 p., 265 KB)
- Letter (with attachments) from Gates (GE) to Hull (USEPA), June 18, 2008, Re: Former Oxbow Areas J and K Summary of May 2008 Vegetation Inspection Activities (PDF) (29 pp., 792 KB)
- Letter from Hull (USEPA) to Gates (GE), June 3, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for Former Oxbow Areas J and K Removal Action, dated May 2008 (PDF) (3 pp., 491 KB)
- Letter from Gates (GE) to Hull (USEPA), May 28, 2008, Re: Former Oxbow Areas J and K Final Completion Report for Former Oxbow Areas J and K Removal Action Appendix C of Final Competion Report , Appendix C of Final Competion Report - Signed and Stamped (PDF) (5 pp., 2.79 MB)
- Letter (with enclosure) from Gates (GE) to Hull (USEPA), May 13, 2008, Re: Former Oxbow Areas J and K Final Completion Report for Former Oxbow Areas J and K Removal Action (PDF) (518 pp., 15.91 MB)
- Letter from Gates (GE) to Hull (USEPA) and Steenstrup (MADEP), December 21, 2007, Re: Former Oxbow Areas J and K Summary of 2007 Conditional Solution Inspection Activities (PDF) (10 pp., 142 KB)
- Letter (with report) from Gates (GE) to Hull (USEPA), November 7, 2007, Re: Former Oxbow Areas J and K Summary of October 2007 Inspection Activities (PDF) (13 pp., 1.41 MB)
- Letter from Gates (GE) to Tagliaferro (USEPA), July 11, 2007, Re: Former Oxbow Areas J and K, Summary of May 2007 Inspection Activities (PDF) (13 pp., 921 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), January 3, 2007, Former Oxbow Areas J and K Summary of November 2006 Inspection Activities (PDF) (11 pp., 456 KB)
- Letter from Tagliaferro (USEPA) to Silfer (GE), October 18, 2006, Re: Approval of General Electric's October 5, 2006 submittal titled Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area - Properties West of Lyman Street; Addendum to Supplemental Information Package (PDF) (2 pp., 95 KB)
- Letter from Gates (GE) to Tagliaferro (USEPA), October 5, 2006, Former Oxbow Areas A and C, Former Oxbow Areas J and K, Lyman Street Area - Properties West of Lyman Street Addendum to Supplemental Information Package (PDF) (32 pp., 1.72 MB)
- Letter from Lovely (USEPA) to Silfer (GE), July 7, 2006, Conditional Approval of GE's June 15, 2006 Former Oxbow A & C, Former Oxbow J & K, and Lyman Street Area-Properties West of Lyman Street, Supplemental Information Package (PDF) (2 pp., 134 KB)
- Letter from Gates (GE) to Lovely (USEPA), July 6, 2006, Revision to Addendum to Final Removal Design/Removal Action Work Plan, Former Oxbow Areas J and K (PDF) (3 pp., 1.1 MB)
- Letter from Lovely (USEPA) to Silfer (GE), June 23, 2006, EPA's Conditional Approval of the Addendum to Final Removal Design/Removal Action Work Plan for Former Oxbow Areas J & K (PDF) (2 pp., 77 KB)
- Letter and attachments from Gates (GE) to Lovely (USEPA), June 15, 2006, Supplemental Information Package Former Oxbow Areas A and C, Former Oxbow Areas J and K, and Lyman Street Area - Properties West of Lyman Street (PDF) (478 pp., 18.8 MB)
- April 4, 2006 EPA conditional approval letter from William Lovely, EPA to Andrew Silfer, GE Re: Conditional Approval of General Electric’s submittal titled "Former Oxbow Areas J & K Additional Supplemental Sampling Proposal" (PDF) (2 pp., 56 KB)
- Addendum to Final Removal Design/Removal
Action Work Plan for Former Oxbow Areas J and K, Table of Contents,
April 2006 (PDF)
(1 p., 27 KB)
Volumes I - IV are internally linked from the table of contents. Combined file size is 21.1 mb - estimated download time: 50 minutes @ 56 kbs. - Letter from Gates (GE) to Lovely (USEPA), March 27, 2006, Additional Supplemental Sampling Proposal for Former Oxbow Areas J and K, Revised (PDF) (4 pp., 1.14 MB)
- Letter from Lovely (USEPA) to Silfer (GE), February 23, 2006, Conditional Approval of GE's submittal Final Removal Design/Removal Action Work Plan for Former Oxbow Areas J & K (PDF) (4 pp., 214 KB)
- Letter from Lovely (USEPA) to Silfer (GE), January 17, 2006, Conditional Approval of GE's submittal "Former Oxbow Areas J & K Supplemental Sampling Plan" (PDF) (2 pp., 111 KB)
- Letter from Gates (GE) to Lovely (USEPA), November 2, 2005, Former Oxbow Areas J and K Supplemental Sampling Plan (PDF) (7 pp., 4.9 MB)
- Final Removal Design/Removal Action Work Plan for Former Oxbow Areas J and K, Blasland, Bouck, & Lee, Inc., September 2005 (PDF) (98 pp., 5 MB)
- Letter from Lovely (USEPA) to Silfer (GE), June 14, 2005, Approval of GE's Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas J and K (PDF) (2 pp., 90 KB)
- EPA's June 14, 2005 approval of the Conceptual Removal Design/ Removal Action Work Plan for Former Oxbow Areas J & K (PDF) (2 pp., 69 KB)
- Conceptual Removal Design/Removal Action Work Plan for Former Oxbow Areas J and K (PDF) (916 pp., 13 MB)
- Letter from Lovely (USEPA) to Silfer (GE), January 10, 2005, Conditional Approval of GE's November 2004 Former Oxbow Areas J and K, Additional Supplemental Pre-Design Investigation Report (PDF) (2 pp., 134 KB)
- Letter from Silfer (GE) to Lovely (USEPA), November 24, 2004, Additional Supplemental Pre-Design Investigation Report for Former Oxbow Areas J and K (PDF) (37 pp., 5.74 MB)
- Letter from Lovely (USEPA) to Silfer (GE), August 26, 2004, Approval of GE's June 2004 Former Oxbow Areas J and K Supplemental Pre-Design Investigation Report and Additional Sampling Proposal (PDF) (3 pp., 179 KB)
- Letter from Silfer (GE) to Lovely (USEPA), June 28, 2004, Supplemental Pre-Design Investigation Report and Additional Sampling Proposal for Former Oxbow Areas J and K (PDF) (150 pp., 6.51 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), March 29, 2004, Conditional Approval of GE's January 28, 2004 Former Oxbow Areas J and K, Preliminary Remedial Evaluations and Proposal for Supplemental Pre-Design Investigation (PDF) (2 pp., 125 KB)
- Letter from Gates (GE) to Nalipinski (USEPA), January 28, 2004, Preliminary Remedial Evaluations and Proposal for Supplemental Pre-Design Investigations for Former Oxbow Areas J and K (PDF) (23 pp., 3.38 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), September 29, 2003, Comments on GE's 11 July 2003 Pre-Design Investigation Report for the Former Oxbow Areas J and K Removal Action (PDF) (2 pp., 237 KB)
- Pre-Design Investigation Report for Former Oxbow Areas J and K, Volumes 1 through 3, Blasland Bouck & Lee Inc. (Prepared for GE), July 2003
- Volume I (PDF) (113 pp., 11.56 MB)
- Volume II (PDF) (230 pp., 18.01 MB)
- Volume III (PDF) (117 pp., 20.15 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), January 13, 2003, Review of Addendum to Pre-Design Investigation Work Plan for Former Oxbow Areas J and K (PDF) (2 pp., 147 kB)
- Letter from Silfer (GE) to Olson (USEPA), January 2, 2003, Addendum to Pre-Design Investigation Work Plan for Former Oxbow Areas J and K (PDF) (44 pp., 5.03 MB)
- Letter from Nalipinski (USEPA) to Silfer (GE), November 19, 2002, Comments of GE's 26 June 2002 Pre-Design Investigation Work Plan for Oxbow Areas J and K Removal Action (PDF) (2 pp., 229 KB)
- Pre-Design Investigation Work Plan for the Former Oxbow Areas J and K Removal Action, Blasland Bouck & Lee Inc. (Prepared for GE), June 2002 (PDF) (68 pp., 6.62 MB)
- Letter from Gates (GE) to Cutler (MDEP), May 22, 2001, Evaluation of Appendix IX+3 Constituents and Revised Soil Removal Limits for Parcel K10-6-3 (PDF) (7 pp., 770 KB)
General
- Supplemental Information Package- Analytical Data for Proposed Backfill Sources, Blasland, Bouck & Lee, Inc., July 2006 (PDF) (6 pp., 520 KB)
- MCP Phase I and Interim Phase II Report for Former Housatonic River Oxbow Areas A, B, C, J, and K., Blasland, Bouck, & Lee, Inc. February 1996. (PDF) (2 pp., 98 KB)