Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Pavements

Publication Details

Repair and Preventative Maintenance Procedures for Continuously Reinforced Concrete Pavement

Research/Reference: useful for researchers doing further work in the pavement area as well as those developing improved testing and design procedures. Includes documents of historical value.

Primary Topic: Pavement Maintenance

Description: Procedures for permanently patching and for pressure grouting of continuously reinforced concrete pavement have been developed. These procedures have been extensively field tested to ensure their practicality and adequacy. The patching procedures reduce costs and lane closure time by considering the different distress types, different methods of construction, and concrete additive and curing for early opening. The pressure grouting procedures provide for a restoration of support beneath the slab and the prevention of future pumping.

FHWA Publication Number: FHWA-IL-UI-191

Publication Year: 1981

Document Links: PDF (file size: )

PDF files can be viewed with the Acrobat® Reader®


View Pavement Publications

 
This page last modified on 10/15/07
 

FHWA
United States Department of Transportation - Federal Highway Administration