Protocol Areas | Protocol D as Offline Form |
Protocol D as Offline Document |
Protocol D Outline |
«« First (A.01) |
« Previous (D.07) |
Next » (D.09) |
Last »» (P.01) |
For dry gas systems, verify that the operator (1) identifies locations where internal corrosion is most likely in each ICDA region and (2) performs direct examinations of those locations. [§192.927(b), 192.927(c)(3), ASME B31.8S-2004, Section 6.4 and ASME B31.8S-2004, Appendix B2]
Verify that the operator's plan defines criteria to be applied in making key decisions (e.g., identifying locations most likely to have internal corrosion, selection of examination tools) in implementing the direct examination stage of the ICDA process. [§192.927(c)(5)(i)]
Verify the operator has identified locations where internal corrosion is most likely to exist in each ICDA region and where electrolyte accumulation is predicted. [§192.927(c)(3), ASME B31.8S-2004, Section 6.4.2 and ASME B31.8S-2004, Appendix B2.3]
Verify that the operator's plan contains provisions for applying more restrictive criteria for the direct examination when conducting ICDA for the first time on a covered segment [§192.927(c)(5)(ii)]
Inspections |
Home Page |
Reference |
FAQ |
Key Documents |
Protocols |
Topical Index |
Glossary |
Rule Outline |
In Context |
Protocol Areas |
Protocol D as Offline Form |
Protocol D as Offline Document |
Protocol D Outline |
Print-Friendly |
My Pages |
Questions and Comments |
Log In... |