Climate Leaders case studies highlight the innovative work of Climate Leaders Partners to reduce their GHG emissions.
Name |
Industry |
Project |
3M |
Manufacturing |
Energy metrics, demand/supply side management (PDF). (21 pp, 407K) |
3M |
Manufacturing |
Purchase electricity from renewable sources (PDF). (21 pp, 407K) |
Advanced Micro Devices, Inc. |
Semiconductor |
Partner Case Study: December 2007 Carbon Copy (PDF). (2 pp, 25K) |
Advanced Micro Devices, Inc. |
Semiconductor |
Develop energy efficient products and reduce energy consumption during manufacturing process (PDF). (14 pp, 66K) |
Advanced Micro Devices, Inc. |
Semiconductor |
Construction of natural gas combined cycle turbine facility (PDF). (23 pp, 1.2MB) |
Bank of America Corporation |
Financial Services |
Server/PC energy saving and advanced data center cooling strategies (PDF). (12 pp, 739K) |
Bank of America Corporation |
Financial Services |
Energy metrics, demand/supply side management (PDF). (12 pp, 739K) |
Bank of America Corporation |
Financial Services |
Promote energy savings programs (PDF). (12 pp, 739K) |
Bank of America Corporation |
Financial Services |
Construction of LEED certified buildings (PDF). (12 pp, 739K) |
California Portland Cement Co. |
Cement |
Energy metrics, demand/supply side management (PDF). (20 pp, 704K) |
EMC Corporation |
Software Manufacturing |
Partner Case Study: Spring 2007 Carbon Copy (PDF). (3 pp, 19K) |
Exelon Corporation |
Utilities |
Energy metrics, demand/supply side management (PDF). (9 pp, 59K) |
General Motors Corporation |
Automotive |
Energy metrics, demand/supply side management (PDF). (30 pp, 749K) |
Staples, Inc. |
Retail |
Purchase alternative fiber paper and promote in-house recycling (PDF). (25 pp, 2.6MB) |
Hasbro, Inc. |
Manufacturing |
Relamping and Installed occupancy sensors and variable speed motors (PDF). (13 pp, 371K) |
Hasbro, Inc. |
Manufacturing |
Summer hours program (PDF). (13 pp, 371K) |
IBM Corporation |
Manufacturing |
Energy metrics, demand/supply side management (PDF). (10 pp, 422K) |
IBM Corporation |
Manufacturing |
Purchase RECs (PDF). (10 pp, 422K) |
Johnson & Johnson |
Health Services |
Construct solar panel farm and install rooftop solar panels (PDF). (22 pp, 321K) |
Johnson & Johnson |
Health Services |
Construction of landfill gas/natural gas combined cycle turbine facility (PDF). (22 pp, 321K) |
Johnson & Johnson |
Health Services |
Micro turbines, fuel cells, cogeneration and micro wind turbines (PDF). (22 pp, 321K) |
Johnson & Johnson |
Health Services |
Purchase green power and RECs (PDF). (22 pp, 321K) |
Marriott International, Inc. |
Hotel Services |
Energy metrics, demand/supply side management (PDF). (26 pp, 2.5MB) |
Mack Trucks, Inc. and Volvo Trucks North America |
Automotive |
Partner Interview: December 2007 Carbon Copy (PDF). (3 pp, 17K) |
Marriott International, Inc. |
Hotel Services |
Retro-commissioning of buildings (PDF). (26 pp, 2.5MB) |
Miller Brewing Company |
Manufacturing |
Energy metrics, demand/supply side management (PDF). (27 pp, 709K) |
Miller Brewing Company |
Manufacturing |
Recover biogas from wastewater (PDF). (27 pp, 709K) |
Pfizer Inc. |
Pharmaceutical |
Energy metrics, demand/supply side management (PDF). (14 pp, 67K) |
Raytheon Company |
Engineering |
Partner Case Study: Spring 2007 Carbon Copy (PDF). (3 pp, 19K) |
Raytheon Company |
Engineering |
Energy metrics, demand/supply side management (PDF). (29 pp, 1.6MB) |
Roche Group U.S. Affiliates |
Health Services |
Partner Case Study: December 2007 Carbon Copy (PDF). (2 pp, 24K) |
SC Johnson |
Manufacturing |
Construction of landfill gas/natural gas combined cycle turbine facility (PDF). (23 pp, 387K) |
Staples, Inc. |
Retail |
Partner Interview: Spring 2007 Carbon Copy (PDF). (4 pp, 21K) |
St. Lawrence Cement |
Cement |
Replace inefficient units and move loading supplies closer to plants (PDF). (40 pp, 1.9MB) |
St. Lawrence Cement |
Cement |
Use waste fuels in cement kilns (PDF). (40 pp, 1.9MB) |
St. Lawrence Cement |
Cement |
Add heat recovery system for kiln operations (PDF). (40 pp, 1.9MB) |
Staples, Inc. |
Retail |
Install upgrading lighting fixtures, day light systems, and light sensors (PDF). (21 pp, 122K) |
Staples, Inc. |
Retail |
Install rooftop solar panels (PDF). (25 pp, 2.6MB) |
Staples, Inc. |
Retail |
Promote recycling and environmental education programs (PDF). (21 pp, 122K) |
Staples, Inc. |
Retail |
Upgrade conveyor systems (variable frequency) and cooling equipment (PDF). (21 pp, 122K) |
Staples, Inc. |
Retail |
Purchase RECs (PDF). (21 pp, 122K) |
United Technologies Corporation |
Manufacturing |
Energy metrics, demand/supply side management (PDF). (17 pp, 881K) |
Xerox Corporation |
Manufacturing |
Partner Case Study: Fall 2006 Carbon Copy (PDF). (3 pp, 20K) |
Xerox Corporation |
Manufacturing |
Remanufacturing and recycling of products (PDF). (30 pp, 2.1MB) |
Xerox Corporation |
Manufacturing |
Energy metrics, demand/supply side management (PDF). (30 pp, 2.1MB) |
Xerox Corporation |
Manufacturing |
Promote energy savings programs (PDF). (30 pp, 2.1MB) |
Xerox Corporation |
Manufacturing |
Construction of new energy efficient plant (PDF). (30 pp, 2.1MB) |
Xerox Corporation |
Manufacturing |
Develop energy efficient products and reduce energy use from manufacturing (PDF). (30 pp, 2.1MB) |
Xerox Corporation |
Manufacturing |
Promote cleaner technologies, reduce miles driven via use of GPS (PDF). (30 pp, 2.1MB) |