|
|
|
Home Page > Executive Branch > Code of Federal Regulations > Electronic Code of Federal Regulations
e-CFR Data is current as of November 3, 2008
TITLE 40--Protection of Environment
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY
SUBCHAPTER I--SOLID WASTES
PART 267--STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT
Subpart A--GENERAL
|
What are the purpose, scope and applicability of this part? |
|
|
What is the relationship to interim status standards? |
|
|
How does this part affect an imminent hazard action? |
|
Subpart B--GENERAL FACILITY STANDARDS
|
Does this subpart apply to me? |
|
|
What must I do to comply with this subpart? |
|
|
How do I obtain an identification number? |
|
|
What are my waste analysis requirements? |
|
|
What are my security requirements? |
|
|
What are my general inspection requirements? |
|
|
What training must my employees have? |
|
|
What are the requirements for managing ignitable, reactive, or incompatible wastes? |
|
|
What are the standards for selecting the location of my facility? |
|
Subpart C--PREPAREDNESS AND PREVENTION
|
Does this subpart apply to me? |
|
|
What are the general design and operation standards? |
|
|
What equipment am I required to have? |
|
|
What are the testing and maintenance requirements for the equipment? |
|
|
When must personnel have access to communication equipment or an alarm system? |
|
|
How do I ensure access for personnel and equipment during emergencies? |
|
|
What arrangements must I make with local authorities for emergencies? |
|
Subpart D--CONTINGENCY PLAN AND EMERGENCY PROCEDURES
|
Does this subpart apply to me? |
|
|
What is the purpose of the contingency plan and how do I use it? |
|
|
What must be in the contingency plan? |
|
|
Who must have copies of the contingency plan? |
|
|
When must I amend the contingency plan? |
|
|
What is the role of the emergency coordinator? |
|
|
What are the required emergency procedures for the emergency coordinator? |
|
|
What must the emergency coordinator do after an emergency? |
|
|
What notification and recordkeeping must I do after an emergency? |
|
Subpart E--RECORDKEEPING, REPORTING, AND NOTIFYING
|
Does this subpart apply to me? |
|
|
Use of the manifest system. |
|
|
What information must I keep? |
|
|
What reports must I prepare and to whom do I send them? |
|
|
What notifications must I make? |
|
Subpart F--RELEASES FROM SOLID WASTE MANAGEMENT UNITS
|
Who must comply with this section? |
|
|
What must I do to address corrective action for solid waste management units? |
|
Subpart G--CLOSURE
|
Does this subpart apply to me? |
|
|
What general standards must I meet when I stop operating the unit? |
|
|
What procedures must I follow? |
|
|
Will the public have the opportunity to comment on the plan? |
|
|
After I stop operating, how long until I must close? |
|
|
What must I do with contaminated equipment, structure, and soils? |
|
|
How do I certify closure? |
|
Subpart H--FINANCIAL REQUIREMENTS
|
Who must comply with this subpart, and briefly, what do they have to do? |
|
|
Definitions of terms as used in this subpart. |
|
|
Cost estimate for closure. |
|
|
Financial assurance for closure. |
|
|
Incapacity of owners or operators, guarantors, or financial institutions. |
|
|
State assumption of responsibility. |
|
|
Wording of the instruments. |
|
Subpart I--USE AND MANAGEMENT OF CONTAINERS
|
Does this subpart apply to me? |
|
|
What standards apply to the containers? |
|
|
What are the inspection requirements? |
|
|
What standards apply to the container storage areas? |
|
|
What special requirements must I meet for ignitable or reactive waste? |
|
|
What special requirements must I meet for incompatible wastes? |
|
|
What must I do when I want to stop using the containers? |
|
|
What air emission standards apply? |
|
Subpart J--TANK SYSTEMS
|
Does this subpart apply to me? |
|
|
What are the required design and construction standards for new tank systems or components? |
|
|
What handling and inspection procedures must I follow during installation of new tank systems? |
|
|
What installation requirements must I follow? |
|
|
What are the secondary containment requirements? |
|
|
What are the required devices for secondary containment and what are their design, operating and installation requirements? |
|
|
What are the requirements for ancillary equipment? |
|
|
What are the general operating requirements for my tank systems? |
|
|
What inspection requirements must I meet? |
|
|
What must I do in case of a leak or a spill? |
|
|
What must I do when I stop operating the tank system? |
|
|
What special requirements must I meet for ignitable or reactive wastes? |
|
|
What special requirements must I meet for incompatible wastes? |
|
|
What air emission standards apply? |
|
Subparts K THROUGH CC--[RESERVED]
Subpart DD--CONTAINMENT BUILDINGS
|
Does this subpart apply to me? |
|
|
What design and operating standards must my containment building meet? |
|
|
What other requirements must I meet to prevent releases? |
|
|
What additional design and operating standards apply if liquids will be in my containment building? |
|
|
How may I obtain a waiver from secondary containment requirements? |
|
|
What do I do if my containment building contains areas both with and without secondary containment? |
|
|
What do I do if I detect a release? |
|
|
Can a containment building itself be considered secondary containment? |
|
|
What must I do when I stop operating the containment building? |
|
February 27, 2007< !-- #EndDate -- >-->
|