DOT Logo Office of Inspector General
|
|
|
|
|

Acquisition and Modernization Reading Room

09.30.2008 * FAA’s Progress and Challenges in Meeting FTI Transition Goals
09.11.2008 * Status of FAA’s Efforts To Develop the Next Generation Air Transportation System
05.28.2008 * Interim Report: Award–Fee Criteria for the National Airway Systems Contract
05.06.2008 * Audit Initiated of the JPDO’s Progress Toward the Next Generation Air Transportation System
04.17.2008 * Key Safety and Modernization Challenges Facing the FAA
04.14.2008 * Air Traffic Control Modernization
02.27.2008 * Interim Report On Award–Fee Criteria for the National Airspace System Implementation Support II Contract and Bridge Contract
02.07.2008 * FAA's Fiscal Year 2009 Budget Request: Key Issues Facing the Agency
02.04.2008 * Audit Initiated of FAA's Use of Non-Competitive Contracts and Price and Cost Analysis
10.31.2007 * FAA Needs to Improve ASDE-X Management Controls to Address Cost Growth, Schedule Delays, and Safety Risks
10.17.2007 * Challenges Facing the Implementation of FAA's Automatic Dependent Surveillance - Broadcast Program
08.15.2007 * Audit Initiated of FAA's Automatic Dependent Surveillance - Broadcast Program
06.18.2007 * FAA's Management and Maintenance of Air Traffic Control Facilities
05.21.2007 * Audit Initiated of FAA's Implementation of Runway Status Lights
05.18.2007 * Interim Report on Controls Over the Federal Aviation Administration's Conversion of Flight Service Stations to Contract Operations
05.10.2007 * FAA's FY 2008 Budget Request: Key Issues Facing the Agency
04.11.2007 * Audit Initiated of Short-Term Capacity Initiatives
02.12.2007 * Joint Planning and Development Office: Actions Needed to Reduce Risks With the Next Generation Air Transportation System
09.21.2006 * Audit of FAA's RESULTS National Contracting Service
07.25.2006 * Perspectives on the Progress and Actions Needed to Address the Next Generation Air Transportation System
06.21.2006 * Observations on Current and Future Efforts to Modernize the National Airspace System
05.26.2006 * Audit Initiated of FAA's Progress in Transitioning to the FTI Program
04.27.2006 * FAA Telecommunications Infrastructure Program: FAA Needs To Take Steps To Improve Management Controls and Reduce Schedule Risks
03.29.2006 * Observations on the Progress and Actions Needed to Address the Next Generation Air Transportation System
08.03.2005 * Audit announced of FAA’s Airport Surface Detection Equipment-Model X Program
07.21.2005 * Chicago’s O’Hare Modernization Program
07.18.2005 * Audit announced on FAA’s Joint Planning and Development Office
06.30.2005 * FAA’s En Route Modernization Program Is On Schedule But Steps Can Be Taken to Reduce Future Risks
05.26.2005 * Status of FAA's Major Acquisitions: Cost Growth and Schedule Delays Continue To Stall Air Traffic Modernization
04.19.2005 * Audit initiated of Federal Aviation Administration’s Telecommunication Infrastructure Program
11.23.2004 * Report on Terminal Modernization: FAA Needs To Address Its Small, Medium, and Large Sites Based on Cost, Time, and Capability
09.07.2004 * Audit announced on FAA's Major Acquisitions
05.28.2004 * Audit Initiated of FAA's Advanced Technologies and Oceanic Procedures (ATOP) Program
03.31.2004 * FAA's Advanced Technologies and Oceanic Procedures
02.13.2004 * Using CRU-X to Capture Official Time Spent on Representational Activities
09.26.2003 * Audit Initiated of FAA's Oversight of Airport Land Acquisition and Relocation Assistance Programs
09.12.2003 * Audit Initiated of FAA's En Route Automation Modernization Program
09.10.2003 * FAA Needs to Reevaluate STARS Costs and Consider Other Alternatives
08.15.2003 * Audit Initiated of FAA's National Airspace Redesign
08.06.2003 * Audit Initiated of FAA's Next-Generation Air/Ground Communications Program
07.23.2003 * Status Report on FAA's Operational Evolution Plan
06.27.2003 * Status of FAA's Major Acquisitions
12.20.2002 * Integrated Terminal Weather System: Important Decisions Must Be Made on the Deployment Strategy
12.18.2002 * FAA's Progress in Developing and Deploying the Local Area Augmentation System
12.03.2002 * Audit Initiated of FAA's Major Acquisitions
12.02.2002 * Audit Initiated of FAA's Advanced Technologies and Oceanic Procedures
12.02.2002 * Audit Initiated of FAA's Terminal Automation Modernization Program
08.15.2002 * FAA’s Airport Lease Data
06.03.2002 * Follow-up Memo to FAA on STARS Acquisition
05.20.2002 * Letter Response to Representative Dana Rohrabacher on FAA's FY2003 Budget Request for Research, Engineering, and Development
04.12.2002 * Letter Response to Senator Richard Shelby on FAA's Advanced Technologies and Oceanic Procedures (ATOP)
03.13.2002 * FAA's Fiscal Year 2003 Budget Request
02.28.2002 * Acquisition of FAA's Weather and Radar Processor
02.22.2002 * Status on the Federal Aviation Administration's Major Acquisitions
02.14.2002 * Review Initiated of FAA's Long-Range Radar Program
12.19.2001 * Review Announced of FAA's Operational Evolution Plan
12.14.2001 * Free Flight Phase 1 Technologies: Progress To Date and Future Challenges
12.07.2001 * Automated Flight Service Stations: Significant Benefits Could be Realized by Consolidating AFSS Sites in Conjunction with Deployment of OASIS
11.27.2001 * Review Initiated of FAA's National Airspace System Implementation Support Contract
09.13.2001 * Status Report on the Standard Terminal Automation Replacement System (STARS)
09.07.2001 * DOT Information Security Program
08.21.2001 * Replacement of FAA Telecommunications Systems
08.20.2001 * FAA's Local Area Augmentation System (LAAS) program
08.17.2001 * Actions to Enhance Capacity and Reduce Delays and Cancellations
07.26.2001 * Observations on the Automated Surface Observing System
07.26.2001 * Letter to Senator Snowe regarding the review of FAA's Automated Surface Observing System
07.03.2001 * Status Report on the Standard Terminal Automation Replacement System
06.13.2001 * Status Report on the Standard Terminal Automation Replacement System
06.11.2001 * Actions to Improve Performance of the National Aviation System
03.30.2001 * Efforts to Develop and Deploy the Standard Terminal Automation Replacement System
03.14.2001 * Federal Aviation Administration Efforts to Develop and Deploy the Standard Terminal Automation Replacement System
02.21.2001 * Notification of Review of the Impact of Mergers on Customer Service
12.18.2000 * Letter from the Inspector General to Senator John McCain, Chairman, Committee on Commerce, Science, and Transportation
10.27.2000 * Observations on Efforts To Address Concerns about Aircraft Wiring
08.29.2000 * Survey of the Federal Aviation Administration's Integrated Product Development System
07.26.2000 * Observations on FAA's Satellite Navigation Efforts
06.29.2000 * Observations on FAA's Satellite Navigation Efforts
04.11.2000 * Key Safety, Modernization, and Financial Issues Facing FAA
03.22.2000 * Key Safety, Modernization, and Financial Issues Facing FAA
02.17.2000 * Modernizing the Federal Aviation Administration: Challenges and Solutions
02.04.2000 * Status Review of the Host and Oceanic Computer System Replacement Program
02.03.2000 * Modernizing the Federal Aviation Administration: Challenges and Solutions
12.21.1999 * Management of Software-Intensive Acquisitions for Free Flight Phase 1
03.30.1999 * Air Traffic Control Modernization
03.25.1999 * Air Traffic Control Modernization
03.22.1999 * Observations on Federal Aviation Administration's Research, Engineering, and Development Program
03.09.1999 * Air Traffic Control Modernization
03.04.1999 * Observations on FAA's Research, Engineering and Development Program
02.24.1999 * FAA's Progress and Plans for Implementing Data Link for Controllers and Pilots
11.30.1998 * Using Direct Access Radar Channel During the HOST Replacement Program
10.08.1998 * FAA/NASA Research and Development Coordination Efforts
09.08.1998 * Recent Developments in FAA Acquisitions
08.10.1998 * Wide Area Augmentation System
07.09.1998 * STARS Main Display Monitors
05.13.1998 * Wide Area Augmentation System
04.15.1998 * Advanced Automation System
03.25.1998 * Research, Engineering and Development Program
03.12.1998 * FAA's Research, Engineering and Development program
03.05.1998 * Air Traffic Control Modernization
12.08.1997 * Management Advisory on Deployment Readiness Review
11.12.1997 * Standard Terminal Automation Replacement System (STARS)
10.17.1997 * FAA's plans to use satellite technology for air traffic management
04.14.1997 * FAA Oversight of Power Systems in the National Airspace System
01.13.1997 * Resource Requirement Planning for Operating and Maintaining the National Airspace System
12.16.1996 * Management Advisory Memorandum on Acquisitions for Automated Flight Services

Acquisition and Modernization RSS Feed

Related Information: OIG