skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
RPV Upper Head Issues
News and Correspondence
Public Meetings
Images
Bulletin 2001-01 Plant Specific Information
Bulletin 2002-01 Plant Specific Information
Bulletin 2002-02 Plant Specific Information
NRC Order EA-03-009 Plant Specific Information
References

Bulletin 2002-02 Plant Specific Information

Plant-specific correspondence, meetings, and responses to bulletin 2002-02 concerning inspection programs are listed below by region.

Region II Region I Region III Region IV

Region I Region II Region III Region IV

Completion of Plant-Specific Licensing Activities Associated with Bulletin 2002-02, Reactor Pressure Vessel Head Penetration Nozzle Inspection Programs Memorandum dated March 19, 2003. PDF Icon

All links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information.

Region 1

Plant Name
Bulletin Response
Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Beaver Valley 1
 
PDF Icon
 
 

 

Beaver Valley 2
 
PDF Icon 
 
   
Calvert Cliffs 1
PDF Icon
PDF Icon
 
   
Calvert Cliffs 2
PDF Icon
PDF Icon
 
   
Ginna
 
PDF Icon
 
   
Indian Point 2
 
PDF Icon 
 PDF Icon
  11/13/02 Ackn Ltr
Indian Point 3
PDF Icon
 
 
 

12/19/02 Inspection Plan

Millstone 2
PDF Icon
PDF Icon
 
   
Millstone 3
 
PDF Icon
PDF Icon 
  10/30/02 Ackn Ltr
Salem 1
 
PDF Icon
PDF Icon
  12/02/02 Ackn Ltr
Salem 2
 
PDF Icon
 
  12/02/02 Ackn Ltr
Seabrook 1
 
PDF Icon
 
  12/02/02 Ackn Ltr
12/20/02 Revised 30-Day Resp
Three Mile Island 1
 
PDF Icon
 
   

(To top of page)

Region 2

Plant Name
Bulletin Response
Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Catawba 1
 
PDF Icon
 
 

11/22/02 Ackn Ltr
06/19/03 Inspection Plans

Catawba 2
 
PDF Icon
 
  11/08/02 Ackn Ltr
06/19/03 Inspection Plans
Crystal River 3
PDF Icon
 
 
   
Farley 1
PDF Icon
 
 
  11/04/02 - 30 Day Supp.
Farley 2
 
PDF Icon
PDF Icon
  10/04/02 Supp. Response
11/04/02 - 30 Day Supp.
12/23/02 Ackn Ltr
McGuire 1
 
PDF Icon
 PDF Icon
 

11/08/02 Ackn Ltr
06/19/03 Inspection Plans

McGuire 2
 
PDF Icon
 
 

11/08/02 Ackn Ltr
06/19/03 Inspection Plans

North Anna 1
 
PDF Icon
PDF Icon
 

10/11/02 RAI Ltr
12/20/02 RAI Response
01/03/03 Ackn Ltr
01/23/03 RAI Response

North Anna 2
 
PDF Icon 
PDF Icon
 

11/21/02 Head Replacement Ltr
12/20/02 RAI Response
01/03/03 Ackn Ltr
01/23/03 RAI Response
02/27/03 Root Cause Eval and
Revised Insp Results
03-09-03 Head Replacement Spec Insp

Oconee 1
 
PDF Icon
 
  09/25/03 Supplemental Info
Oconee 2
 
PDF Icon 
 PDF Icon
  12/16/02 RAI Response
09/25/03 Supplemental Info
Oconee 3
 
PDF Icon
 
  09/25/03 Supplemental Info
Robinson 2
 
PDF Icon
PDF Icon 
  01/08/04 Head Inspections Planned
Sequoyah 1
 
PDF Icon
 
  12/16/02 Ackn Ltr
Sequoyah 2
 
PDF Icon
 
  12/16/02 Ackn Ltr
Shearon Harris 1
 
PDF Icon
 
   
St. Lucie 1
 
PDF Icon
PDF Icon
10/10/02-10/14/02 Telecon
Summary
Telecon Slides
 
St. Lucie 2
 
PDF Icon
 
   
Summer
 
PDF Icon
 
   
Surry 1
 
PDF Icon 
 
  01/03/03 Ackn Ltr
01/23/03 RAI Response
Surry 2
 
PDF Icon
 
  01/03/03 Ackn Ltr
01/23/03 RAI Response
Turkey Point 3
 
PDF Icon
 
   
Turkey Point 4
 
PDF Icon
 
   
Vogtle 1
 
PDF Icon
 
  10/02/02 Errata
11/14/02 Ackn Ltr
Vogtle 2
 
PDF Icon
 
  10/02/02 Errata
11/13/02 Ackn Ltr
Watts Bar 1
 
PDF Icon
 
  12/20/02 Ackn Ltr
(To top of page)

Region 3

Plant Name
Bulletin Response
Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Braidwood 1
 
PDF Icon
 
  12/02/02 Ackn Ltr
Braidwood 2
 
PDF Icon
 
  12/02/02 Ackn Ltr
Byron 1
 
PDF Icon
 
  11/05/02 Ackn Ltr
Byron 2
 
PDF Icon
PDF Icon 
  11/05/02 Ackn Ltr
Davis Besse
 
PDF Icon
 
   
DC Cook 1
 
PDF Icon
 
   
DC Cook 2
 
PDF Icon
 
   
Kewaunee
PDF Icon
 
 
   
Palisades
PDF Icon
 
 
   
Point Beach 1
 
PDF Icon
PDF Icon
 

10/04/02 RAI Response
04/10/03 RAI Response
Calc 32-5019398-01 Weld Anomaly
Calc 32-5019396-01 J-Groove Weld
Calc 32-5020244-01 Temperbead Bore Weld

Point Beach 2
 
PDF Icon
 
 

10/04/02 RAI Response
04/10/03 RAI Response
Calc 32-5019398-01 Weld Anomaly
Calc 32-5019396-01 J-Groove Weld
Calc 32-5020244-01 Temperbead Bore Weld

Prairie Island 1
PDF Icon
PDF Icon  
  08/05/03 Supp Response
Prairie Island 2
PDF Icon
 
 
  08/05/03 Supp Response

(To top of page)

Region 4

Plant Name
Bulletin Response
Meetings Other Correspondence
15
Day
30
Day
30 Day Outage
Arkansas Nuclear 1   
 
PDF Icon
PDF Icon 
10/16/02 Notice
10/16/02 Slides
10/08/02-11/06/02 - Telecon Summary
10/31/02 - 30 Day Supp.
12/24/02 Ackn Ltr
Draft RAI Resp- BL2002-01
Arkansas Nuclear 2
PDF Icon
 
 
   
Callaway
 
 PDF Icon
 PDF Icon
  11/13/02 Ackn Ltr
Comanche Peak 1
 
PDF Icon
PDF Icon 
  12/02/02 Ackn Ltr
Comanche Peak 2
 
PDF Icon
 
  12/02/02 Ackn Ltr
Diablo Canyon 1
 
PDF Icon
 
   
Diablo Canyon 2
 
PDF Icon
 
   
Fort Calhoun
 
PDF Icon
 
  02/17/03 Revised 30-Day Resp
Palo Verde 1
 
PDF Icon 
 PDF Icon
   
Palo Verde 2
 
PDF Icon
 
   
Palo Verde 3
 
PDF Icon
 
   
San Onofre 2
 
PDF Icon
 
  12/31/02 Revised 30-Day Resp
San Onofre 3
 
PDF Icon
PDF Icon
 

12/31/02 Revised 30-Day Resp
02/14/02 Inspection Status

South Texas 1
 
PDF Icon
 
  12/26/02 Ackn Ltr
South Texas 2
 
PDF Icon
PDF Icon 
  12/26/02 Ackn Ltr
Waterford 3
PDF Icon
 
 
   
Wolf Creek 1
 
PDF Icon
 
  12/04/02 Ackn Ltr

Ackn - Acknowledgment Letter
Supp - Supplemental
Resp - Response

(To top of page)

 



Privacy Policy | Site Disclaimer
Tuesday, February 13, 2007