RPV Bottom Head Issues
Correspondence Related to NRC Bulletin 2003-02
Images
News and Correspondence
Public Meetings
References

Correspondence Related to NRC Bulletin 2003-02

On August 21, 2003, NRC issued NRC Bulletin 2003-02, "Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity." There are two types of responses to the bulletin: initial, and 60 day. For licensees with a refueling outage prior to December 31, 2003, the initial response is due within 30 days of the bulletin, the other licensees have 90 days. This response requests information about the licensees lower head penetration inspection program. The 60 day response is a summary of the lower head penetration inspections and is due within 60 days of plant restart.

On November 5, 2003, the NRC issued Temporary Instruction 2515/152, Revision 1, which revises the area on reporting requirements. On September 5, 2003, the NRC issued Temporary Instruction 2515/152, "Reactor Pressure Vessel Lower Head Penetration Nozzles," (NRC Bulletin 2003-02)

Region I Region II Region III Region IV

On this page:

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Region 1

Plant Name Initial Response 60 Day Response Related Documents
Beaver Valley 1 ADAMS Icon ADAMS Icon 08/29/05 Closeout Letter
Beaver Valley 2 ADAMS Icon ADAMS Icon 10/18/04 Closeout Letter
Ginna ADAMS Icon ADAMS Icon 11/08/04 Closeout Letter
Indian Point 2 ADAMS Icon ADAMS Icon 08/02/05 Closeout Letter
Indian Point 3 ADAMS Icon ADAMS Icon 08/30/05 Closeout Letter
Millstone 3 ADAMS Icon ADAMS Icon 11/09/04 Closeout Letter
Salem 1 ADAMS Icon ADAMS Icon 12/06/04 Closeout Letter
Salem 2 ADAMS Icon ADAMS Icon 12/06/04 Closeout Letter
Seabrook 1 ADAMS Icon ADAMS Icon 02/09/05 Closeout Letter
Three Mile Island 1 ADAMS Icon ADAMS Icon 02/03/05 Closeout Letter

(To top of page)

Region 2

Plant Name Initial Response 60 Day Response Related Documents
Catawba 1 ADAMS Icon ADAMS Icon 01/13/05 Closeout Letter
Catawba 2 ADAMS Icon ADAMS Icon 07/19/05 Closeout Letter
Crystal River 3 ADAMS Icon ADAMS Icon 01/18/05 Closeout Letter
Farley 1 ADAMS Icon ADAMS Icon 09/01/05 Closeout Letter
Farley 2 ADAMS Icon ADAMS Icon 02/03/05 Closeout Letter
McGuire 1 ADAMS Icon ADAMS Icon 01/04/04 Closeout Letter
McGuire 2 ADAMS Icon ADAMS Icon 01/04/04 Closeout Letter
North Anna 1 ADAMS Icon ADAMS Icon 02/25/05 Closeout Letter
North Anna 2 ADAMS Icon ADAMS Icon 09/23/04 Closeout Letter
Oconee 1 ADAMS Icon ADAMS Icon 01/06/05 Closeout Letter
Oconee 2 ADAMS Icon ADAMS Icon 01/06/05 Closeout Letter
Oconee 3 ADAMS Icon ADAMS Icon 03/07/05 Closeout Letter
Robinson 2 ADAMS Icon ADAMS Icon 03/03/05 Closeout Letter
Sequoyah 1 ADAMS Icon ADAMS Icon 09/30/05 Closeout Letter
Sequoyah 2 ADAMS Icon ADAMS Icon 10/06/04 Closeout Letter
Shearon Harris 1 ADAMS Icon ADAMS Icon 08/01/05 Closeout Letter
Summer ADAMS Icon ADAMS Icon 02/04/05 Closeout Letter
Surry 1 ADAMS Icon ADAMS Icon 08/01/05 Closeout Letter
Surry 2 ADAMS Icon ADAMS Icon 09/22/04 Closeout Letter
Turkey Point 3 ADAMS Icon ADAMS Icon 04/22/05 Closeout Letter
Turkey Point 4 ADAMS Icon ADAMS Icon 04/22/05 Closeout Letter
Vogtle 1 ADAMS Icon ADAMS Icon 01/13/05 Closeout Letter
Vogtle 2 ADAMS Icon ADAMS Icon 01/13/05 Closeout Letter
Watts Bar 1 ADAMS Icon ADAMS Icon 10/06/04 Closeout Letter

(To top of page)

Region 3

Plant Name Initial Response 60 Day Response Related Documents
Braidwood 1 ADAMS Icon ADAMS Icon 04/08/05 Closeout Letter
Braidwood 2 ADAMS Icon ADAMS Icon 01/31/05 Closeout Letter
Byron 1 ADAMS Icon ADAMS Icon 02/02/05 Closeout Letter
Byron 2 ADAMS Icon ADAMS Icon 02/02/05 Closeout Letter
Davis Besse ADAMS Icon ADAMS Icon 01/24/06 Closeout Letter
DC Cook 1 ADAMS Icon ADAMS Icon 10/15/04 Closeout Letter
DC Cook 2 ADAMS Icon ADAMS Icon 07/28/05 Closeout Letter
Kewaunee ADAMS Icon ADAMS Icon 06/28/05 Closeout Letter
Point Beach 1 ADAMS Icon ADAMS Icon 11/22/04 Closeout Letter
Point Beach 2 ADAMS Icon ADAMS Icon 11/22/04 Closeout Letter
Prairie Island 1 ADAMS Icon ADAMS Icon 07/07/05 Closeout Letter
Prairie Island 2 ADAMS Icon ADAMS Icon 10/05/04 Closeout Letter

(To top of page)

Region 4

Plant Name Initial Response 60 Day Response Related Documents
Arkansas Nuclear 1 ADAMS Icon ADAMS Icon 01/14/05 Closeout Letter
Callaway ADAMS Icon ADAMS Icon 12/07/04 Closeout Letter
Comanche Peak 1 ADAMS Icon ADAMS Icon 12/02/04 Closeout Letter
Comanche Peak 2 ADAMS Icon ADAMS Icon 12/02/04 Closeout Letter
Diablo Canyon 1 ADAMS Icon ADAMS Icon 04/05/05 Closeout Letter
Diablo Canyon 2 ADAMS Icon ADAMS Icon 09/14/05 Closeout Letter
Palo Verde 1 ADAMS Icon ADAMS Icon 10/03/05 Closeout Letter
Palo Verde 2 ADAMS Icon ADAMS Icon 10/03/05 Closeout Letter
Palo Verde 3 ADAMS Icon ADAMS Icon 10/03/05 Closeout Letter
South Texas 1 ADAMS Icon ADAMS Icon 09/07/05 Closeout Letter
South Texas 2 ADAMS Icon ADAMS Icon 04/04/05 Closeout Letter
Wolf Creek 1 ADAMS Icon ADAMS Icon 01/20/05 Closeout Letter

(To top of page)