skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
RPV Bottom Head Issues
Correspondence Related to NRC Bulletin 2003-02
Images
News and Correspondence
Public Meetings
References

Public Meetings for RPV Bottom Head Issues

This page lists, in chronological order, the notices, slides and summaries documenting the public meetings held concerning RPV Bottom Head Issues. To learn about future meetings, see our public meeting schedule page.

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date
Description
08/19/03

Category 2 Meeting - To discuss the generic responses of the nuclear industry and NRC to issues associated with leakage from and inspection of reactor pressure vessel lower head penetrations.

Contacts: William Reckley 301-415-1323, Ted Sullivan 301-415-2796

07/28/03

This meeting is to present the results of the NRC's Special Inspection Team review of the South Texas Project, Unit 1, reactor vessel bottom-mounted instrumentation penetration leackage issue. The licensee will also provide a summary of their investigation of the issue and corrective actions.

Contact: Russ Bywater, 817-917-5646

07/17/03

Category 1 Meeting - Third Meeting to Discuss STP Unit 1 reactor vessel bottom mounted instrument penetration leakage issue.

Contact: Mohan Thadani, 301-415-1476

07/11/03

NRC Staff briefing to the Advisory Committee on Reactor Safeguards (Full Committee) on the South Texas Project bottom head instrumentation penetration leackage

06/05/03

Category 1 Meeting - Second Meeting to Discuss STP Unit 1 reactor vessel bottom mounted instrument penetration leakage issue.

Contact: Mohan Thadani, 301-415-1476

05/01/03

Category 1 Meeting - Discussions about STP Unit 1 reactor vessel bottom mounted instrument penetration leakage issue

Contact: Mohan Thadani, 301-415-1476

(To top of page)



Privacy Policy | Site Disclaimer
Tuesday, February 13, 2007