skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Letter Reports
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999

Advisory Committee on Reactor Safeguards (ACRS) 2000 Letter Reports

Date Title
12/15/2000 Proposed Final Regulatory Guide DG-1053, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence"
12/14/2000 Proposed Revision to the Commission's Safety Goal Policy Statement for Reactors
12/14/2000 Nuclear Energy Institute Draft Report, NEI 99-03, "Control Room Habitability Assessment Guidance"
12/13/2000 South Texas Project, Units 1 and 2 - Draft Safety Evaluation on Exemption Requests from Special Treatment Requirements of 10 CFR Parts 21, 50, and 100
12/21/2000 Proposed Framework for Risk-Informed Changes to the Technical Requirements of 10 CFR Part 50
11/20/2000 BWROG Proposal to Use Safety Relief Valves and Low Pressure Systems as a Redundant Safe Shutdown Path To Satisfy the Requirements of 10 CFR 50, Appendix R
11/15/1999 License Renewal Guidance Documents
11/13/2000 Draft Safety Evaluation Report Related to "Justification for Not Including Postulated Breaks in Large-Bore Reactor Coolant System Piping in the Licensing Basis for Existing and Replacement Once-Through Steam Generators" (BAW-2374, Rev. 0, July 2000)
11/08/2000 Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants
10/12/2000 Pressurized Thermal Shock Technical Basis Reevaluation Project
10/11/2000 Proposed Revision to 10 CFR 73.55, "Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage"
10/11/2000 Union of Concerned Scientists Report, "Nuclear Plant Risk Studies: Failing the Grade"
09/14/2000 Pre-Application Review of the AP1000 Standard Plant Design - Phase I
09/13/2000 Proposed Risk-Informed Revisions to 10 CFR 50.44, "Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors"
09/12/2000 Proposed Final Regulatory Guide DG-1093, "Guidance and Examples for Identifying 10 CFR 50.2 Design Bases"
09/08/2000 Proposed High-Level Guidelines for Performance-Based Activities
09/08/2000 Causes and Significance of Design Basis Issues at U.S. Nuclear Power Plants
09/07/2000 Assessment of the Quality of Probabilistic Risk Assessments
09/07/2000 Draft Regulatory Guide DG-1075, "Emergency Planning and Preparedness for Nuclear Power Reactors
09/05/2000 Final Regulatory Guide 1.18x on 10 CFR 50.59, Changes, Tests, and Experiments
07/27/2000 Assessment of the Quality of PRAs
07/20/2000 Proposed Final ASME Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications
07/20/2000 Nuclear Energy Institute Letter Dated January 19, 2000, Addressing NRC Plans for Risk-Informing the Technical Requirements in 10 CFR Part 50
07/20/2000 Proposed Final Regulatory Guidance Documents Regarding Use of Risk-Informed Decisionmaking in License Amendment Reviews
07/18/2000 Proposed Revision 3 to Regulatory Guide 1.52, "Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Post-Accident Engineered-Safety-Feature Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants"
07/18/2000 Proposed Rule, 10 CFR Part 55, "Operator License Eligibility and Use of Simulation Facilities in Operator Licensing"
07/14/2000 Topical Report BAW-2374, "Justification for Not Including Postulated Breaks in Large-Bore Reactor Coolant System Piping in the Licensing Basis for Existing and Replacement Once-Through Steam Generators"
07/14/2000 Draft Regulatory Guides
06/22/2000 Draft Report, "Regulatory Effectiveness of the Station Blackout Rule"
06/21/2000 AP1000 Pre-Application Review
06/20/2000 Proposed Final Regulatory Guide and Standard Review Plan Section Associated with the Alternative Source Term Rule
06/20/2000 Proposed Resolution of Generic Safety Issue-173A, "Spent Fuel Storage Pool for Operating Facilities"
06/12/2000 Industry Initiatives in the Regulatory Process
05/25/2000 Use of Defense in Depth in Risk-Informing NMSS Activities
05/23/2000 SECY-00-0053, "NRC Program on Human Performance in Nuclear Power Plant Safety"
05/22/2000 Proposed Modifications to Regulatory Guidance Documents Regarding Use of Risk-Informed Decision Making in License Amendment Reviews
05/22/2000 Draft Regulatory Guide DG-1096, "Transient and Accident Analysis Methods" and Standard Review Plan, Section 15.0.1, "Review of Analytical Computer Codes"
05/19/2000 Proposed Final Revision 1 to Regulatory Guide 1.54, "Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants" (formerly DG-1076)
04/18/2000 Proposed NRC Research Plan for Digital Instrumentation and Control
04/17/2000 Reactor Safety Goal Policy Statement
04/13/2000 NRC Program for Risk-Based Analysis of Reactor Operating Experience
04/13/2000 Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants
04/10/2000 SECY-00-0071, Draft Regulatory Guide (DG-1095), "Guidance for Implementation of 10 CFR 50.59 (Changes, Tests, And Experiments)"
04/10/2000 SECY-00-0061, Proposed Revision to the Enforcement Policy to Address the Revised Reactor Oversight Process
04/07/2000 Draft Regulatory Guide DG-1094, "Fire Protection for Operating Nuclear Power Plants"
04/06/2000 Final Rule: "Elimination of the Requirement for Noncombustible Fire Barrier Penetration Seal Materials and Other Minor Changes" (10 CFR Part 50)
03/15/2000 Revised Reactor Oversight Process
03/13/2000 Proposed Final Amendment to 10 CFR 50.72, "Immediate Notification Requirements for Operating Nuclear Power Reactors," and 10 CFR 50.73, "Licensee Event Report System"
03/13/2000 Proposed Resolution of Generic Issue B-17, "Criteria for Safety-Related Operator Actions," and Generic Issue 27, "Manual vs. Automated Actions"
03/13/2000 SECY-00-0007, "Proposed Staff Plan for Low Power and Shutdown Risk Analysis Research to Support Risk-Informed Regulatory Decision Making"
02/13/2000 Report on the Safety Aspects of the License Renewal Application for the Oconee Nuclear Station, Units 1, 2, and 3
3/10/2000 Proposed Final Regulatory Guide 1.xxx, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants"
02/14/2000 Impediments to the Increased Use of Risk-informed Regulation
02/11/2000 Revision of Appendix K, "ECCS Evaluation Models," to 10 CFR Part 50
02/11/2000 Importance Measures Derived from Probabilistic Risk Assessments
02/08/2000 SECY-00-0011, "Evaluation of the Requirement for Licensees to Update Their Inservice Inspection and Inservice Testing Programs Every 120 Months"


Privacy Policy | Site Disclaimer
Wednesday, February 14, 2007