skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
PWR Sump Performance - Public Meetings
2007
2006
2005
2004
2003
2002
2001

Public Meetings for 2005

This page lists, in reverse chronological order, the notices, slides and summaries documenting the public meetings held concerning the pressurized-water reactors (PWRs) sump performance issue (GSI-191). To learn about future meetings, see our public meeting schedule page.

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date Description
11/02/2005 Meeting with Industry Regarding the PWR Sump Blockage Issue (GSI-191)
09/30/2005 Meeting with Industry Regarding the PWR Sump Blockage Issue (GSI-191)
07/26/2005 Meeting with the American Society for Testing and Materials on Standards for Coatings Assessment
07/14/2005 Category 1 Meeting: Meeting with Omaha Public Power District on Fort Calhoun Station Unit 1
06/30/2005 Meeting with Nuclear Energy Institute (NEI) Regarding the Resolution Status of the PWR Sump Blockage Issue (GSI-191)
04/13/2005 Category 2 Meeting: Meeting with Nuclear Energy Institue (NEI)
01/27/2005 Category 2 Meeting: Meeting with Nuclear Energy Institue (NEI) and Industry
01/12/2005 Category 2 Meeting: Meeting with Nuclear Energy Institute (NEI) and Industry

(To top of page)



Privacy Policy | Site Disclaimer
Friday, August 24, 2007