|
Home > Nuclear
Reactors > Operating
Reactors > Operational
Experience
> PWR Sump Performance
> Public Meetings for 2003
Public Meetings for 2003
This page lists, in reverse chronological order, the notices, slides
and summaries documenting the public meetings held concerning the pressurized-water
reactors (PWRs) sump performance issue (GSI-191). To learn about future
meetings, see our public
meeting schedule page.
Some links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS), and others are to documents
in Adobe Portable Document Format (PDF). ADAMS documents are provided in either
PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying
these formats, see our Plugins, Viewers, and
Other Tools page. If you have questions about search techniques or problems
with viewing or printing documents from ADAMS, please contact the Public
Document Room staff.
Date |
Description |
11/19/2003 |
Category 2 Meeting. Discuss the status of
NEI activities re: the evaluation guidelines & chemical precipitation
& discuss status of activities re: resolution of GSI-191.
|
10/15/2003 |
Commission Briefing on License Renewal
Program, Power Uprate Activities, and High Priority Areas
|
09/10/2003 |
Category 2 Meeting: Discuss the testing
and analysis necessary to address the chemical precipitation issue
on a timescale which is consistent with NRC’s current plan
for resolving GSI-191
|
07/30-31/2003 |
NEI Sump Performance Workshop
|
07/01/2003 |
Category 2 Meeting: Discuss the status of the industry’s
methodology regarding debris generation, the status of the Los Alamos
National Laboratory’s chemical effects tests, and the status
of the Nuclear Regulatory Commission (NRC) generic communications
related to GSI-191
|
06/30/2003 |
Category 2 Meeting: Discuss the contents of Bulletin
2003-01
|
04/29/2003 |
Category 2 Meeting: To discuss the industry’s
outline process for determining breach size in support of local
debris generation following a design - basis loss-of coolant accident
|
03/05/2003 |
Category 2 Meeting: To tour the University of New
Mexico laboratory and discuss the laboratory’s activities
and how they support the NRC’s efforts related to GSI-191
|
|