Crab Plan Team Meeting:
Crab Plan Team
meeting:
(note location change) September 16-18 AFSC, Seattle, WA,
AGENDA
(revised 9/9/08)
EBS Snow,
BB Red King Crab,
EBS Tanner,
Appendix; (new)
Pribilof Red King Crab,
Pribilof Blue King Crab,
St. Matthews Blue King Crab,
Norton Sound Red King Crab,
AI Golden King Crab,
AI GKC Model;
Pribilof Golden King Crab,
Adak Red King Crab. Economic
SAFE: (new) Analysis
of Prices;
Data Collection Summaries;
Crew
Opportunities (revised)) |
Crab Plan Team:
The Plan Teams' primary function is to provide the Council with the
best available scientific information, including scientifically based recommendations
regarding appropriate measures for the conservation and management of the Bering Sea and
Aleutian Islands (BS/AI) king and Tanner crab fisheries. All recommendations must be
designed to prevent overfishing while achieving optimum yield (National Standard 1). All
recommendations must also be scientifically based (National Standard 2), drawing upon the
Plan Teams' expertise is the areas of regulatory management, natural and social science,
mathematics and statistics.
The Plan Team compiles a SAFE report for the BS/AI king and Tanner
crab fisheries on an annual basis. The SAFE report provides the Council with a summary of
the most recent biological condition of the crab stocks and the social and economic
condition of the fishing and processing industries. The SAFE report summarizes the best
available scientific information concerning the past, present and possible future
condition of the crab stocks and fisheries, along with ecosystem concerns.
|
Membership of the BSAI King and
Tanner Crab Plan Team |
Bill Bechtol (University of Alaska)
Forrest Bowers (ADF&G/Dutch
Harbor) Chairman
Wayne Donaldson (ADF&G/Kodiak)
Ginny Eckert (UAS/UAF)
Joshua Greenberg (UAF)
Gretchen Harrington (NMFS/RO)
Doug Pengilly (ADF&G/ Kodiak)
Andre Punt (University of Washington)
Lou Rugolo (AFSC/Kodiak)
Herman Savikko (ADF&G/Juneau)
Shareef Siddeek (ADF&G/Juneau)
Diana Stram (NPFMC)
Jack Turnock (AFSC/Seattle)
|
CRAB SAFE Executive summaries:
2008 Crab SAFE
2007 Crab SAFE
2006 Crab SAFE, entire document
2005 Crab SAFE, entire document (6mb)
2004 Crab SAFE Executive summary
2003 Crab SAFE Executive
summary
2002 Crab SAFE executive summary
2001 CRAB SAFE Executive summary only
2000 Crab SAFE Executive Summary only
1999 Crab
SAFE Executive Summary only
|
Minutes
from the May 2007 Crab Plan Team Meeting (final),
Agenda |
Minutes
from the September 2006 Crab Plan Team Meeting,
Agenda |
MINUTES from the May, 2006 Crab Plan Team Meeting |
Minutes
from the September 2005 Crab Plan Team Meeting |
Minutes
from the May 2005 Crab Plan Team |
Minutes
from the September 2005 Crab Plan Team |
Minutes from the May 2004 Crab Plan
Team meeting |
Minutes from the 2003 Crab Plan Team
meeting, with attachments and addendum |
Minutes from the September 2002 Crab Plan
Team Meeting |
Minutes from the October 2001 Crab Plan
Team Meeting |
Minutes from the October 2000 Crab Plan Team Meeting |
Minutes from the September 1999 Crab Plan Team Meeting
|
|