Bureau of Reclamation Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Dataweb

Yakima Dams Fish Passage Study

Background

The Bureau of Reclamation is leading a cooperative investigation with the Yakama Nation, state and Federal agencies, and others, to study the feasibility of providing fish passage at the five large storage dams of the Yakima Project. These dams—Bumping Lake, Kachess, Keechelus, Cle Elum, and Tieton—were never equipped with fish passage facilities. Four of the five reservoirs were originally natural lakes and historically supported Native American fisheries for sockeye salmon and other anadromous and resident fish.

Implementation of passage features at the dams has the potential to reintroduce sockeye salmon to the watershed; to increase populations of upper basin steelhead, coho salmon, and Chinook salmon; restore life history and genetic diversity of salmon; and reconnect isolated populations of bull trout. more>>

Related Links 05/2008

Cle Elum Dam Interim Fish Passage Operations
2007 Annual Report

Technical Series No. PN-YDFP-013

PDF 661 kb
01/2008

Cle Elem and Bumping Lake Dams Fish Passage Facilities Biology Appendix
Technical Series No. PN-YDFP-012

PDF 4.40 mb
03/2007

Assessment of Sockeye Salmon Production Potential
in the Bumping River Basin
Technical Series No. PN-YDFP-010

PDF 3.61 mb
03/2007

Assessment of Sockeye Salmon Production Potential in the Cle Elum River Basin
Technical Series No. PN-YDFP-008

PDF 3.75 mb
03/2007

Coho Salmon Production Potential in the Bumping River Basin
Technical Series No. PN-YDFP-009

PDF 3.55 mb
03/2007

Coho Salmon Production Potential in the Cle Elum River Basin
Technical Series No. PN-YDFP-007

PDF 466 kb
03/2007

Physical, Chemical, and Biological Characteristics
of Cle Elum and Bumping Lakes
Technical Series No. PN-YDFP-005

PDF 1.46 mb
12/2006

Cle Elum Dam Interim Fish Passage Operations
2006 Annual Report

Technical Series No. PN-YDFP-011

PDF 3.63 mb
  Appendix A: PIT Tag Data (Excel file) XLS 185 kb
10/2005

Cle Elum Juvenile PIT Tag Fish Bypass System
Technical Series No. PN-YDFP-004

PDF 7.8 mb
04/2005

Phase I Assessment Report
Technical Series No. PN-YDFP-001

HTML
02/2005

Fisheries Reintroduction Plan
Technical Series No. PN-YDFP-003

PDF 3.5 mb
01/2005

Stream Macroinvertebrate Surveys in the Cle Elum and Bumping River Watersheds
Technical Series No. PN-YDFP-002

PDF 3.8 mb
Contact

Ellen Berggren, Activity Manager
Bureau of Reclamation
1150 N Curtis Road, Suite 100
Boise, ID 83706

eberggren@pn.usbr.gov
(208) 378-5090
(208) 378-5102 FAX

 

Last Update: June 5, 2008 10:54 AM