Banner: Bureau of Reclamation, Great Plains Region
Reclamation Home             Regional Offices             Newsroom             Library             Dataweb

Boys fishing at accessible pond at Pueblo State Park below Pueblo Dam, Colorado
(Above) A foggy morning at Ruedi Reservoir near Basalt, CO.
Eastern Colorado Area Office

11056 W. County Rd 18E
Loveland, CO 80537-9711
Phone(970) 667-4410
Fax (970) 663-3212

Area Manager:
Mike Collins

The Eastern Colorado Area Office manages Reclamation projects and programs in Eastern Colorado.

The Region's operations in Colorado consist of the Colorado-Big Thompson (C-BT) Project in the north central and northeastern part of the state, the Fryingpan-Arkansas Project in the south central and southeastern part of the state, the Arkansas River Recovery Project at Leadville, the Trinidad Project in the southeastern part of the state, and the Narrows Unit in the northeast corner of the state. The operations are managed from the Eastern Colorado Area Office (ECAO) in Loveland. Also included are Bonny Dam and Reservoir in the east central part of the state which are part of the Pick-Sloan Missouri Basin Program and are managed by the Nebraska-Kansas Projects Office.

Eastern Colorado Area Office, Upcoming Events & Current News
Download Adobe Reader  NOTE: Some files require Adobe Acrobat Reader--Download here!
More Public Invovlement Links

Colorado-Big Thompson is one of the most complex projects undertaken by Reclamation. It includes more than 100 water and power facilities which store, regulate and divert water from the west slope of the Rockies under the Continental Divide to 125 water user organizations and municipalities on the east slope. In 1990 the project provided irrigation water for about 632,000 acres of farmland which produced nearly $331 million worth of crops. It also provided municipal water to 445,000 people in communities of the South Platte River Basin. Its six powerplants are capable of producing 184 megawatts of power.

The Fryingpan-Arkansas Project also diverts west slope water under the divide, in this case into the Arkansas River Valley on the east slope. The project has four storage reservoirs and one pump-back storage unit with power generating capacity of 200 megawatts. The terminal storage feature is Pueblo Dam and Reservoir near the city of Pueblo. The reservoir has become the most popular state-operated recreation spot in the state with more than 1.5 million visitors a year.

The largest and most technologically-advanced fish hatchery in Colorado is located at the base of the dam. In 1990 the project provided supplemental irrigation for about 200,000 acres and provided municipal water to more than 376,000 people in the basin. High flows during the 1995 operational season resulted in the filling of all reservoirs. Reclamation has just finished negotiating and will soon execute the second round of water sales contracts for 17,000 acre-feet from Ruedi Reservoir.

Recreation Links
About Us: Employment, History, Organization

As part of the Arkansas River Recovery Project, Reclamation maintains the Leadville Mine Drainage Tunnel and operates and maintains the Treatment Plant under an NPDES (National Pollutant Discharge Elimination System) discharge permit. The tunnel, constructed between 1943 and 1952 by the Bureau of Mines, has historically discharged water containing heavy metals to the Arkansas River. Reclamation assumed ownership of the tunnel in 1959. Operation of the treatment plant started in 1992. Reclamation is cooperating with other agencies to study the resulting water quality in the river.

The Trinidad Project is a Federal project constructed, operated, and maintained by the Corps of Engineers. Because the Trinidad Project includes irrigation and municipal functions, Reclamation administers the repayment contract with the Purgatoire River Water District. Reclamation is beginning the second 10-year review of operating procedures, which involves water settlements between the States of Colorado and Kansas.

The Narrows Unit was re-authorized for construction and operation in 1970. The project would provide water for supplemental irrigation, municipal and industrial uses, recreation, and fish and wildlife conservation and enhancement. Reclamation suspended activities on the Narrows Unit in the late 1980s.

A portion of the land acquired for the project is currently being leased for agricultural use, while the remainder is managed for wildlife management and enhancement.

Privacy Policy | Disclaimer | Accessibility | FOIA | Quality of Information | FAQ | Notices
DOI | Recreation.gov | USA.gov