Escalated Enforcement Actions Issued to Reactor Licensees - C

Callaway - Docket No. 050-00483

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-03-060
Callaway
NOV
(White)
06/20/2003 On June 20, 2003, a Notice of Violation was issued for a violation associated with a White SDP finding involving the licensee's emergency planning. The violation cited the failure to establish the means to notify certain members of the public in the emergency planning zone in the event of an emergency at the Callaway plant.
EA-02-046
Callaway
NOV
(White)
04/09/2002 On April 9, 2002, a Notice of Violation was issued for a violation associated with a White SDP finding involving the failure of an auxiliary feedwater pump. The violation cited the licensee's failure to promptly identify and correct a significant condition adverse to quality, involving the potential for foreign material to be in the auxiliary feedwater system and condensate storage tank.
EA-01-130
Callaway
NOV
(White)
07/23/2001 On July 23, 2001, a Notice of Violation was issued for a violation associated with a White SDP inspection finding involving the essential service water (ESW) pump. The violation cited the inoperability of one essential service water trains for approximately 132 hours.
EA-01-005
Callaway
NOVCP
(SL III)

$ 55,000

05/14/2001 On May 14, 2001, a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $55,000 was issued for a Severity Level III violation involving the Wachenhut Corporation, a contractor of Union Electric (see EA 01-006), and Union Electric discriminating against a security officer and training instructor for having engaged in protected activity.
EA-00-208
Callaway
NOV
(White)
01/09/2001 On January 9, 2001, a Notice of Violation was issued for a violation associated with three White SDP findings involving performance deficiencies in the licensee's procedures and engineering controls designed to achieve occupational doses that are as low as is reasonably achievable (ALARA).
To top of page

Calvert Cliffs 1 & 2 - Docket Nos. 050-00317; 050-00318

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-06-198
Calvert Cliffs1
NOV
(White)
10/27/2006 On October 27, 2006, a Notice of Violation was issued for a violation associated with a WHITE significance determination process finding involving inadequate design control during the establishment of the over-current trip setting for an electrical circuit breaker that supplies power to the support systems for the 1A emergency diesel generator (EDG). The violation was cited against 10 CFR Part 50, Appendix B, Criterion III, "Design Control," because the licensee failed to ensure that design control measures provided for verifying or checking the adequacy of the design when Calvert Cliffs modified the on-site electrical distribution design by installing a new 1A EDG in 1996.
EA-02-159
Calvert Cliffs
NOV
(White)
09/09/2002 On September 9, 2002, a Notice of Violation was issued for a violation associated with a white SDP finding involving the inability of 49 sirens that were part of the licensee's alert and notification system to activate in a timely manner. The violation cited the licensee's inability to complete the initial notification of the public with the plume exposure pathway emergency planning zone within about 15 minutes after declaring an emergency.
EA-02-138
Calvert Cliffs 1 & 2
NOV
(White)
08/19/2002 On August 19, 2002, a Notice of Violation was issued for a violation associated with a white SDP finding involving the failure to adequately prepare a radioactive material shipment to a waste processing facility. The violation cited the licensee's failure to meet transportation requirements for preparing radioactive material for shipment such that external radiation levels on the surface of the package do not exceed allowable levels under conditions normally incident to transportation.
EA-01-206
Calvert Cliffs 1 & 2
NOV
(Yellow)
09/19/2001 On September 19, 2001, a Notice of Violation was issued for a violation associated with a Yellow SDP finding involving the failure of the auxiliary feedwater pump (AFW) turbine bearing. The violation cited the licensee's failure to follow procedures involving reassembly of the AFW pump outboard bearing housing.
EA-98-280
Calvert Cliffs 1 & 2
NOVCP
(SL III)

$ 55,000
09/02/1998 Failures to properly implement radiological control procedures.
EA-98-106
Calvert Cliffs 1 & 2
NOV
(SL III)
03/20/1998 Airborne Contamination.
EA-97-192
Calvert Cliffs 1 & 2
NOVCP
(SL II)

$176,000
08/11/1997 Programmatic breakdown in the area of Radiation Protection during operations.
EA-96-179
Calverts Cliffs 1 & 2
NOVCP
(SL III)

$50,000
07/25/1996 Appendix R deficiency. Redundant elec surge room served by common HVAC duct, fire dampers closed such that a fire in one room stop HVAC to non-fire room.
To top of page

Catawba 1 & 2 - Docket Nos. 050-00413; 050-00414

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-04-189
Catawba 1 & 2
NOV
(SL III)
01/24/2005 On January 24, 2005, a Notice of Violation was issued for a Severity Level III violation involving the failure to provide complete and accurate information involving a proposed amendment to allow the radiation of four mixed oxide lead test assemblies.
EA-99-094
Catawba 1 & 2
NOV
(SL III)
07/22/1999 Violation involving the misalignment of two electrical breakers that rendered the Standby Shutdown System (SSS) inoperable.
EA-98-208
Catawba 1 & 2
NOV
(SL III)
06/11/1998 Programmatic breakdown in following procedures for the administrative and surveillance system.
To top of page

Clinton - Docket No. 050-00461

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-06-291
Clinton
NOV
(White)

02/07/2006 On February 7, 2007, a Notice of Violation associated with a White Significance Determination Finding was issued involving the failure to select an appropriate method for calculating the minimum elevation (i.e., the analytical level) of water above the high pressure core spray (HPCS) pump suction line to preclude vortex formation and subsequent air entrainment in the pump’s suction. As a result, the analytical level would result in significant air entrainment potentially causing the HPCS to be incapable of completing its safety function.
EA-03-030
Clinton
NOV
(SL III)
05/06/2003 On May 6, 2003, a Notice of Violation was issued for a Severity Level III violation involving the failure to provide complete and accurate information to the NRC regarding pre-existing medical conditions of two initial reactor operator license candidates.
EA-01-147
Clinton
NOV
(White)
08/22/2001 On August 22, 2001, a Notice of Violation was issued for a violation associated with a White SDP finding. The violation involved the licensee's failure to correct self-identified deficiencies disclosed through control room communicator drills in 1999 and 2000.
EA-98-464
Clinton
NOV
(SL III)
09/30/1999 Deliberate misconduct involving discrimination against a QV inspector for raising safety concern.
EA-97-132
Clinton
NOVCP
(SL III)

$110,000
08/01/1997 Failure to take corrective actions regarding hardened grease/lubrication problems in circuit breakers.
EA-96-412
Clinton

NOVCP
(SL II & III)

$450,000
06/09/1997 Numerous procedure problems, non-conservative decision, surveillance problems, and management ineffectiveness.
To top of page

Columbia Generating Station - Docket No. 050-00397

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-02-107
Columbia Generating Station
NOV
(White)
06/24/2002 On June 24, 2002, a Notice of Violation was issued for a violation associated with a White SDP finding involving the degradation of multiple safety-related and important-to-safety breakers that were replaced during a refueling outage in June 2001. The violation cited the licensee's failure to establish adequate design control measures and the failure to assure that conditions adverse to quality be promptly identified and corrected.
EA-01-236
Columbia Generating Station
NOV
(Yellow)
12/28/2001 On December 28, 2001, a Notice of Violation was issue for a violation associated with a Yellow SDP finding involving the failure to follow and maintain emergency plans and procedures to meet required emergency planning requirements.
To top of page

Comanche Peak 1 & 2 - Docket Nos. 050-00445; 050-00446

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-08-028
Comanche Peak 1
NOV
(White)
02/29/2008 On February 29, 2008, a Notice of Violation was issued for a violation associated with a White Significance Determination Finding involving a violation of the Unit 1 Technical Specification (TS) 3.8.1, “AC Sources - Operating,” which requires that while the plant is in Modes 1, 2, 3, or 4, two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s) shall be operable. From November 1, 2007, through November 21, 2007, while the plant was in Mode 1, one of the two DGs capable of supplying the onsite Class 1E power distribution subsystem(s) was inoperable, and action was not taken to either restore the DG to an operable status within 72 hours or be in Mode 3 within 6 hours and Mode 5 within 36 hours. Specifically, Emergency Diesel Generator (EDG) 1-02 was made inoperable as a result of painting activities due to paint having been deposited and remaining on at least one fuel rack in a location that prevented motion required to support the operation of the EDG. This condition caused EDG 1-02 to fail to start during a surveillance test on November 21, 2007.
EA-04-009
Comanche Peak 1 & 2
NOV
(White)
02/13/2004 On February 13, 2004, a Notice of Violation was issued for a violation associated with a White SDP finding involving a steam generator tube flaw that could have resulted in failure of the tube during postulated initiating events. The violation cited the licensee’s failure to promptly identify and correct a condition adverse to quality (a steam generator tube flaw).
EA-01-304
Comanche Peak 1 & 2
NOV
(White)
02/21/2002 On February 21, 2002, a Notice of Violation was issued for a violation associated with a White SDP finding involving 11 examples in which radiological surveys to detect radioactivity required by Technical Specification procedures were not adequate. The violation cited the licensee's failure in allowing items containing detectable activity to be released from a radiologically controlled area.
To top of page

Cooper - Docket No. 050-00298

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-07-204
Cooper
NOV
(White)
06/13/2008 On June 13, 2008, a Notice of Violation (NOV) was issued for a violation associated with a White Significance Determination Finding involving a violation of 10 CFR Part 50, Appendix B,
Criterion V, “Instructions, Procedures, and Drawings.” Specifically, between 1997 and June, 2007, the licensee failed to ensure that two emergency operating procedures which were used to bring the plant to a safe shutdown condition in the event of certain postulated fire scenarios would work as written. Additionally, the licensee failed to properly verify and validate procedure steps to ensure that they would work to accomplish the necessary actions.
EA-07-090
Cooper
NOV
(White)
08/17/2007 On August 17, 2007, a Notice of Violation was issued for a violation associated with a White Significance Determination Finding involving a violation 10 CFR Part 50, Appendix B, Criterion XVI. The licensee failed to establish measures to promptly identify and correct a significant condition adverse to quality (SCAQ) and failed to assure that the cause of a SCAQ was determined and corrective action taken to preclude repetition. Specifically, the licensee’s inadequate procedural guidance for evaluating the suitability of parts used in safety related applications presented an opportunity in which the licensee failed to promptly identify a defective voltage regulator circuit board used in Emergency Diesel Generator (EDG) 2 prior to its installation. Following installation of the defective EDG 2 voltage regulator circuit board, the licensee failed to determine the cause of two high voltage conditions, and failed to take corrective action to preclude repetition. As a result, an additional high voltage condition occurred resulting in a failure of EDG 2.
EA-04-120
Cooper
NOV
(White)
06/25/2004 On June 25, 2004, a Notice of Violation was issued for a violation associated with a White SDP finding involving a high failure rate on the licensed operator biennial requalification written examinations. The violation cited the failure to consistently implement all elements of a systems approach to training in the licensed operator requalification program.
EA-01-298
Cooper
NOV
(White)
03/26/2002 On March 26, 2002, a Notice of Violation was issued for a violation associated with a White SDP finding involving operator requalification examinations. The violation was based on the licensee's practice that compromised the integrity of the requalification biennial written examinations.
EA-01-231
Cooper
NOV
(White)
03/01/2002 On March 1, 2002, a Notice of Violation was issued for two violations associated with two White SDP findings involving Cooper's emergency plans. The first violation cited the licensee's failure to notify state and local government agencies within the required time following the declaration of an alert. The second violation cited the failure of the licensee's onsite emergency plan to provide timely augmentation of response capabilities, including recurring problems in activating the automated notification system and staffing the emergency response facilities in a timely manner.
EA-01-154
Cooper
NOV
(White)
08/13/2001 On August 13, 2001, a Notice of Violation was issued for a violation associated with a White SDP finding. The violation involved the failure to correct a risk-significant performance weakness that was identified in an emergency planning exercise in August 2000, such that it repeated during an April 2001 drill.
EA-97-424
Cooper
NOVCP
(SL III)

$110,000
12/01/1997 Corrective action program deficiencies.
EA-97-017
Cooper
NOV
(SL III)
06/25/1997 FSAR inaccuracies and post-ATWS operating procedures.
EA-96-488
Cooper
NOV
(SL III)
12/20/1996 Failing to include a DC power source for RCIC turbine trip throttle valve.
EA-96-307
Cooper
NOV
(SL III)
11/20/1996 The action was based on eight apparent violations of access authorization requirements, most of which had been identified by NPPD following a change in management of the security program in late 1995.
EA-96-202
Cooper
NOV
(SL III)
09/30/1996 Possible deliberate violation of procedures by operators in rod mispositioning event.
EA-96-062
Cooper
NOVCP
(SL III)

$ 50,000
04/17/1996 Significantly altering the material characteristics of the blowout panels resulting in an unreviewed safety question.
To top of page

Crystal River 3 - Docket No. 050-00302

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-05-114
Crystal River 3
NOV
(White)
09/21/2005 On September 21, 2005, a Notice of Violation was issued for a violation associated with a White SDP finding involving unprotected post-fire safe shutdown cables and related non-feasible local manual operations actions. The violation cited the licensee’s failure to ensure that one of the redundant trains of systems necessary to achieve and maintain hot shutdown conditions would be free of fire damage via one of the three means specified in 10 CFR Part 50, Appendix R, Section III.G.2.
EA-97-330
Crystal River 3
NOV
(SL III)
09/05/1997 Diesel generator relay modifications.
EA-97-094
Crystal River 3
NOV
(SL III)
06/06/1997 Failure to perform surveillance testing for containment penetrations.
EA-97-162
Crystal River 3
NOV
(SL III)
06/05/1997 50.59 evaluation was inadequate.
EA-97-161
Crystal River 3
NOV
(SL III)
05/29/1997 Significant safeguards information was left unattended outside protected area for 16 hours.
EA-97-012
Crystal River 3
NOVCP
(SL III)

$ 50,000
02/28/1997 The action involved multiple violations related to the implementation of licensee's Physical Security Plan (PSP). Specifically, six violations were identified involving the failure to (1) maintain adequate PSP implementing procedures; (2) properly respond to a protected area alarm; (3) employ the capability to assess more than one protected area alarm at a time; (4) maintain a physical barrier to the protected area; (5) appropriately control and safeguards weapons stored in the armory; and (6) properly submit PSP changes to the NRC as required by 10 CFR 50.54(p).
EA-96-365
Crystal River 3



 

NOV
(SL II & III)
03/12/1997 The violations identified indicate a broad spectrum of problems exist in FPC's Engineering program at Crystal River Unit 3. The action includes: (1) a Severity Level II problem for failure to meet the requirements of 10 CFR 50.59 in six cases; (2) a Severity Level III violation for failure to ensure that regulatory and plant design basis requirements are met; and, (3) a Severity Level III violation for untimely and inadequate corrective actions resulting in the failure to identify significant unreviewed safety questions and containment integrity issues.
EA-95-126
Crystal River 3
NOVCP
(SL III)

$100,000
07/16/1996 Apparent deliberate misconduct by a licensed operator resulting in makeup tank overpressurization.