skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Information Notices
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
1979

Information Notices - 1991

File Name Date Description
in91050s1 07/17/1997 Water Hammer Events Since 1991
in91085r1 02/27/1997 Potential Failures of Thermostatic Control Valves for Diesel Generator Jacket Cooling Water
in91029s3 11/22/1995 Deficiencies Identified During Electrical Distribution System Functional Inspections
in91029s2 12/22/1993 Potential Deficiencies Found During Electrical Distribution System Functional Inspections
in91079s1 08/04/1994 Deficiencies Found in Thermo-Lag Fire Barrier Installation
in91045s1 07/29/1994 Possible Malfunction of Westinghouse ARD, BFD, and NBFD Relays, and A200 DC and DPC 250 Magnetic Contactors
in91081s1 05/19/1994 Switchyard Problems that Contribute to Loss of Offsite Power
in91021s1 12/07/1993 Inadequate Quality Assurance Program of Vendor Supplying Safety-Related Equipment
in91064s1 10/07/1992 Site Area Emergency Resulting from a Loss of Non-Class 1E Uninterruptable Power Supplies
in91029s1 09/14/1992 Deficiencies Identified During Electrical Distribution System Functional Inspections
in91052s1 07/16/1992 Nonconservative Errors in Overtemperature Delta-Temperature (OTdT) Setpoint Caused by Improper Gain Setting
in91087 12/27/1991 Hydrogen Embrittlement of Raychem Cryofit Couplings
in91086 12/27/1991 New Reporting Requirements for Contamination Events at Medical Facilities (10 CFR 30.50)
in91085 12/26/1991 Potential Failures of Thermostatic Control Valves for Diesel Generator Jacket Cooling Water
in91084 12/26/1991 Problems with Criticality Alarm Components/Systems
in91083 12/20/1991 Solenoid-Operated Valve Failures Resulted in Turbine Overspeed
in91018s1 12/18/1991 High-Energy Piping Failures Caused by Wall Thinning
in91082 12/18/1991 Problems with Diaphragms in Safety-Related Tanks
in91081 12/16/1991 Switchyard Problems that Contribute to Loss of Offsite Power
in91080 12/11/1991 Failure of Anchor Head Threads on Post-Tensioning System During Surveillance Inspection
in91079 12/06/1991 Deficiencies in the Procedures for Installing Thermo-Lag Fire Barrier Materials
in91078 11/28/1991 Status Indication of Control Power for Circuit Breakers Used in Safety-Related Applications
in91077 11/26/1991 Shift Staffing at Nuclear Power Plants
in91076 11/26/1991 10 CFR Parts 21 and 50.55(e) Final Rules
in91075 11/25/1991 Static Head Corrections Mistakenly Not Included in Pressure Transmitter Calibration Procedures
in91074 11/25/1991 Changes in Pressurizer Safety Valve Setpoints Before Installation
in91073 11/21/1991 Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve
in91072 11/19/1991 Issuance of a Revision to the EPA Manual of Protective Action Guides and Protective Actions for Nuclear Incidents
in91071 11/12/1991 Training and Supervision of Individuals Supervised by an Authorized User
in91070 11/04/1991 Improper Installation of Instrumentation Modules
in91069 11/01/1991 Errors in Main Steam Line Break Analyses for Determining Containment Parameters
in91068 10/28/1991 Careful Planning Significantly Reduces the Potential Adverse Impacts of Loss of Offsite Power Events During Shutdown
in91067 10/21/1991 Problems with the Reliable Detection of Intergranular Attack (IGA) of Steam Generator Tubing
in91066 10/18/1991 (1) Erroneous Data in ... NUREG/CR-0095 and (2) Thermal Scattering Data Limitation ... KENO and SCALE Codes
in91065 10/16/1991 Emergency Access to Low-Level Radioactive Waste Disposal Facilities
in91064 10/09/1991 Site Area Emergency Resulting from a Loss of Non-Class 1E Uninterruptible Power Supplies
in91063 10/03/1991 Natural Gas Hazards at Fort St. Vrain Nuclear Generating Station
in91062 09/30/1991 Diesel Engine Damage Caused by Hydraulic Lockup Resulting from Fluid Leakage into Cylinders
in91061 09/30/1991 Preliminary Results of Validation Testing of Motor-Operated Valve Diagnostic Equipment
in91060 09/24/1991 False Alarms of Alarm Ratemeters Because of Radiofrequency Interference
in91059 09/23/1991 Problems with Access Authorization Programs
in91058 09/20/1991 Dependency of Offset Disc Butterfly Valve's Operation on Orientation with Respect to Flow
in91057 09/19/1991 Operational Experience on Bus Transfers
in91056 09/19/1991 Potential Radioactive Leakage to Tank Vented to Atmosphere
in91055 09/16/1991 Failures Caused by an Improperly Adjusted Test Link in 4.16 KV General Electric Switchgear
in91054 09/06/1991 Foreign Experience Regarding Boron Dilution
in91053 09/04/1991 Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components
in91052 08/29/1991 Nonconservative Errors in Overtemperature Delta-Temperature (OTdT) Setpoint Caused by Improper Gain Settings
in91051 08/20/1991 Inadequate Fuse Control Programs
in91050 08/20/1991 A Review of Water Hammer Events After 1985
in91049 08/15/1991 Enforcement of Safety Requirements for Radiographers
in91048 08/09/1991 False Certificates of Conformance Provided by Westinghouse Electric Supply Company for Commercial-Grade Circuit Breakers
in91047 08/06/1991 Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test
in91046 07/18/1991 Degradation of Emergency Diesel Generator Fuel Oil Delivery Systems
in91043 07/05/1991 Recent Incidents Involving Rapid Increases in Primary-to-Secondary Leak Rate
in91044 07/08/1991 Improper Control of Chemicals in Nuclear Fuel Fabrication
in91045 07/05/1991 Possible Malfunction of Westinghouse ARD, BFD, and NBFD Relays, and A200 DC and DPC 250 Magnetic Contactors
in91042 06/27/1991 Plant Outage Events Involving Poor Coordination Between Operations and Maintenance Personnel During Valve Testing and Manipulations
in91041 06/27/1991 Potential Problems with the Use of Freeze Seals
in91040 06/19/1991 Contamination of Nonradioactive System and Resulting Possibility for Unmonitored, Uncontrolled Release to Environment
in91039 06/17/1991 Compliance with 10 CFR Part 21, "Reporting of Defects and Noncompliance"
in91038 06/13/1991 Thermal Stratification in Feedwater System Piping
in91037 06/10/1991 Compressed Gas Cylinder Missile Hazards
in91036 06/10/1991 Nuclear Plant Staff Working Hours
in91035 06/07/1991 Labeling Requirements for Transporting Multi-Hazard Radioactive Materials
in91034 06/03/1991 Potential Problems in Identifying Causes of Emergency Diesel Generator Malfunctions
in91033 05/31/1991 Reactor Safety Information for States During Exercises and Emergencies
in91032 05/15/1991 Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering
in91031 05/09/1991 Nonconforming Magnaflux Magnetic Particle (14AM) Prepared Bath
in91030 04/23/1991 Inadequate Calibration of TLDs Utilized to Monitor Extremity Dose at Uranium Processing and Fabrication Facilities
in91029 04/15/1991 Deficiencies Identified During Electrical Distribution System Functional Inspections
in91028 04/15/1991 Cracking in Feedwater System Piping
in91027 04/10/1991 Incorrect Rotation of Positive Displacement Pump
in91026 04/02/1991 Potential Nonconservative Errors ... Working Format Hansen-Roach Cross-Section Set Provided with the KENO and SCALE Codes
in91025 04/01/1991 Commercial-Grade Structural Framing Components Supplied as Nuclear Safety-Related Equipment
in91024 03/26/1991 Recent Operating Experience Involving Reactor Operation Without a Licensed RO or SRO Present in the Control Room
in91023 03/26/1991 Accidental Radiation Overexposures to Personnel Due to Industrial Radiography Accessory Equipment Malfunctions
in91022 03/19/1991 Four Plant Outage Events Involving Loss of AC Power or Coolant Spills
in91021 03/19/1991 Inadequate Quality Assurance Program of Vendor Supplying Safety-Related Equipment
in91021 03/19/1991 Inadequate Quality Assurance Program of Vendor Supplying Safety-Related Equipment
in91020 03/19/1991 Electrical Wire Insulation Degradation Caused Failure in a Safety-Related Motor Control Center
in91021 03/19/1991 Inadequate Quality Assurance Program of Vendor Supplying Safety-Related Equipment
in91019 03/12/1991 Steam Generator Feedwater Distribution Piping Damage
in91018 03/12/1991 High-Energy Piping Failures Caused by Wall Thinning
in91017 03/11/1991 Fire Safety of Temporary Installations or Services
in91016 03/06/1991 Unmonitored Release Pathways from Slightly Contaminated Recycle and Recirculation Water Systems at a Fuel Facility
in91015 03/06/1991 Incorrect Configuration of Breaker Operating Springs in General Electric AK-Series Metal-Clad Circuit Breakers
in91014 03/05/1991 Recent Safety-Related Incidents at Large Irradiators
in91013 03/04/1991 Inadequate Testing of Emergency Diesel Generators (EDGs)
in91011 02/20/1991 Inadequate Physical Separation and Electrical Isolation of Non-Safety-Related Circuits From RPS Circuits
in91012 02/15/1991 Potential Loss of Net Positive Suction Head (NPSH) of Standby Liquid Control System Pumps
in91010 02/12/1991 Summary of Semiannual Program Performance Reports on Fitness-for-Duty (FFD) in the Nuclear Industry
in91009, rev. 1 09/25/2007 Counterfeiting of Crane Valves
in91009 02/05/1991 See in91009, rev 1
in91008 02/05/1991 Medical Examination for Licensed Operators
in91007 02/04/1991 Maintenance Deficiency Associated with General Electric Horizontal Custom 8000 Induction Motors
in91006 01/31/1991 Lock-Up of Emergency Diesel Generator and Load Sequencer Control Circuits Preventing Restart of Tripped EDG
in91005 01/30/1991 Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles
in91004 01/28/1991 Reactor Scram Following Control Rod Withdrawal Associated with Low Power Turbine Testing
in91003 01/07/1991 Management of Wastes Contaminated with Radioactive Materials ("Red Bag" Waste and Ordinary Trash)
in91002 01/07/1991 Brachytherapy Source Management
in91001 01/04/1991 Supplier of Misrepresented Resistors


Privacy Policy | Site Disclaimer
Friday, September 28, 2007