skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Information Notices
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
1979

Information Notices - 2007

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

File Name Date Description
in200739 01/07/08 Control of Simulation Software Categorized as Sensitive Unclassified Nonsafeguards Information
in200740 12/21/07 Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components To Nuclear Power Plant Licensees
in200738 12/14/07 Ensuring Complete and Accurate Information in the Documentation of Training and Experience for Individuals Seeking Approval as Medical Authorized Users
in200737 11/23/07 Buildup of Deposits in Steam Generator
in200736 11/15/07 Emergency Diesel Generator Voltage Regulator Problems
in200735 10/17/07 Varian Medical Systems Varisource HDR Events: Iridium-192 Source Pulled From Sheilded Position
in200734 10/22/07 Operating Experience Regarding Electrical Circuit Breakers
in200733 09/29/07 Exposures to Members of the Public Caused by Inadequate Controls Over Well Logging Sources
in200732 10/15/07 Out-of-service Equipment Connected To In-service Process Line Results in Fissile Solution Spill at Fuel Cycle Facility
in200731 11/13/07 U.S. Food and Drug Administration Announcement Related to Certain Sleep Disorder Drugs
in200730 09/13/07 Radiological Controls Create Criticality Safety Accident Scenario for Fissile Solution Container Transport at Fuel Cycle Facility
in200729 09/17/07 Temporary Scaffolding Affects Operability of Safety-related Equipment
in200728 09/19/07 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls
in200727 08/06/07 Recurring Events Involving Emergency Diesel Generator Operability
in200726 08/13/07 Combustibility of Epoxy Floor Coatings at Commercial Nuclear Power Plants
in200725 07/19/07 Suggestion from the Advisory Committee on the Medical Use of Isotopes for Consideration to Improve Compliance With Sodium Iodide I-131 Written Directive Requirements in 10 CFR 35.40 and Supervision Requirements in 10 CFR 35.27
in200724 07/19/07 Summary of Fitness-For-Duty Program Performance Reports for Calendar Year 2006
in200723 08/08/07 Inadvertent Discharge of Halon 1301 Fire-suppression System from Incorrect and/or Out-of-date Procedures
in200722 06/19/07 Recent Hydorgen Fluoride Exposures at Fuel Cycle Facilities
in200721 06/11/07 Pipe Wear Due to Interaction of Flow-induced Vibration and Reflective Metal Insulation
in200720 06/11/07 Use of Blank Ammunition
in200719 05/21/07 Fire Protection Equipment Recalls and Counterfeit Notices
in200718 05/13/07 Operating Experience Regarding Entrainment of Gas or Debris into Auxiliary Feedwater Systems
in200717 05/03/07 Fires at Nuclear Power Plants Involving Inadequate Fire Protection Administrative and Design Controls
in200716 05/02/07 Common Violations of the Increased Controls Requirements and Related Guidance Documents
in200715 04/17/07 Effects of Ethernet-based, Non-safety Related Controls on the Safe and Continued Operation of Nuclear Power Stations
in200714 03/30/07 Loss of Offsite Power and Dual-unit Trip at Catawba Nuclear Generating Station
in200713 04/04/07 Use of As-found Conditions to Evaluate Criticality-related Process Upsets at Fuel Cycle Facilities
in200712 03/15/07 Tactical Communications Interoperability Between Nuclear Power Reactor Licensees and First Responders
in200711 03/06/07 Recent Operator Performance Issues at Nuclear Power Plants
in200710 03/13/07 Yttrium-90 Theraspheres® and Sirspheres® Impurities
in200709 03/26/07 Equipment Operability under Degraded Voltage Conditions
in200708 02/28/07 Potential vulnerabilities of time-reliant computer-based systems due to change in daylight saving time dates
in200707 02/15/07 Potential Failure of All Control Rod Groups to Insert in a Boiling Water Reactor Due to a Fire
in200706 02/09/07 Potential Common Cause Vulnerabilities in Essential Services Water Systems
in200705 02/09/07 Vertical Deep Draft Pump Shaft and Coupling Failures
in200704 02/05/07 Construction Experience Related to the Assurance of Quality in the Construction of Nuclear Facilities
in200703 02/02/07 Reportable Medical Events Involving Patients Receiving Dosages of Sodium Iodide Iodine-131 Less Than the Prescribed Dosage Because of Capsules Remaining in Vials After Administration.
in200702 03/07/07 Failure of Control Rod Drive Mechanism Lead Screw Male Coupling at a Babcock and Wilcox-designed Facility
in200701 01/31/07 Recent Operating Experience Concerning Hydrostatic Barriers


Privacy Policy | Site Disclaimer
Monday, January 14, 2008