skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Letter Reports
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999

Advisory Committee on Reactor Safeguards (ACRS) 2005 Letter Reports

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date Title
12/23/2005 Early Site Permit Application for the Grand Gulf Site and the Associated Final Safety Evaluation Report
12/21/2005 Draft Final Generic Letter 2005-XX, “Impact of Potentially Degraded HEMYC/MT Fire Barrier Materials on Compliance with Approved Fire Protection Programs”
12/16/2005 Draft Regulatory Guide DG-1120, “Transient and Accident Analysis Methods,” and Standard Review Plan Chapter 15 Section 15.0.2, “Review of Transient and Accident Methods”
12/16/2005 Proposed Revision to Regulatory Guide 1.76, “Design Basis Tornado and Tornado Missiles for Nuclear Power Plants,” and Standard Review Plan, Sections 2.3.1, “Regional Climatology,” and 3.5.1.4, ‘Missiles Generated by Tornado and Extreme Winds”
12/16/2005 Proposed Revision to Standard Review Plan Section 17.5, “Quality Assurance Program Description Design Certification, Early Site Permit and New License Applicants”
11/21/2005 Draft NRC Digital System Research Plan for FY 2005 - FY 2009
11/18/2005 Draft Final Generic Letter 2005-XX, “Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power”
11/18/2005 Staff Recommendation to Withdraw the Proposed Rule on Post-Fire Operator Manual Actions
11/18/2005 Report on the Safety Aspects of the License Renewal Application for the Point Beach Nuclear Plant Units 1 and 2
11/15/2005 Final Rule - AP1000 Design Certification
11/09/2005 Draft Final Generic Letter 2005-XX, "Steam Generator Tube Integrity and Associated Technical Specifications"
11/09/2005 Standard Review Plan Section 14.2.1, "Generic Guidelines for Extended Power Uprate Testing Programs"
11/08/2005 Proposed Revision to Standard Review Plan Section 12.5, "Operational Radiation Protection Program"
11/04/2005 ACRS Assessment o f the Quality of Selected NRC Research Projects - FY 2005
10/19/2005 Interim Report on the Safety Aspects of the License Renewal Application for the Browns Ferry Nuclear Plant Units 1, 2, and 3
10/18/2005 Proposed Recommendation for Resolving Generic Safety Issue 80, “Pipe Break Effects on Control Rod Drive Hydraulic Lines in the Drywells of BWR Mark I and II Containments"
10/13/2005 Draft Regulatory Guide Dg-1120 (DG-1120), "Transient and Accident Analysis Methods," and Standard Review Plan Chapter 15 Section 15.0.2 (SRP 15.0.2), "Review of Transient and Accident Methods"
10/11/2005 Proposed Rule on Safety/Security Interface
09/23/2005 Proposed Draft Regulatory Guide DG-8028, “Control of Access to High and Very High Radiation Areas in Nuclear Power Plants”
09/23/2005 Report on a Proposed Technical Basis for Revision of the Embrittlement Criteria in 10 CFR 50.46
09/22/2005 Proposed Revision to Standard Review Plan Section 6.2.1.3 “Mass and Energy Release Analysis for Postulated Loss-of-Coolant Accidents”
09/22/2005 Interim Letter: Exelon Generation Company, LLC, Application for Early Site Permit and the Associated NRC Staff’s Draft Safety Evaluation Report
09/22/2005 Draft Final Revisions to Generic License Renewal Guidance Documents
09/22/2005 Report on the Safety Aspects of the License Renewal Applications for the Millstone Power Station, Units 2 and 3
09/21/2005 Report on Two Policy Issues Related to New Plant Licensing
09/20/2005 ACRS Review of the North Anna Early Site Permit Application - Final Safety Evaluation Report Changed Pages Prior to Publishing as a NUREG
09/20/2005 Proposed Rule: Licenses, Certifications, and Approvals For Nuclear Power Plants, 10 CFR Part 52 and Conforming Amendments to Parts 1, 2, 10, 19, 20, 21, 25, 26, 50, 51, 54, 55, 72, 73, 95, 140, 170, and 171
09/20/2005 Proposed Revision 4 to Regulatory Guide 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident"
09/14/2005 Draft Final Regulatory Guide 3.71, "Nuclear Criticality Safety Standards for Fuels and Materials Facilities"
07/25/2005 Draft Final Amendment to 10 CFR 50.55a "Codes and Standards"
07/25/2005 Proposed Generic Letter 2005-XX, "Post-Fire Safeshutdown Circuit Analysis Spurious Actuations"
07/18/2005 Draft Final Regulatory Guide DG-1137, "Guidelines for Lightning Protection of Nuclear Power Plants"
07/18/2005 Dominion Nuclear North Anna, LLC, Early Site Permit Application and the Associated NRC Final Safety Evaluation Report
07/18/2005 Report on the Safety Aspects of the License Renewal Application for the Donald C. Cook Nuclear Plant, Units 1 and 2
07/15/2005 Proposed Revision 2 to Regulatory Guide 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants"
07/15/2005 Assessment of the Quality of the NRC Research Projects
07/08/2005 Proposed Regulatory Guide (DG)-1128, "Criteria for Accident Monitoring Instrumentation for Nuclear Power Plants" (Revision 4 of Regulatory Guide 1.97)
07/07/2005 Proposed Generic Letter 2005-XX, "Impact of Potentially Degraded Hemyc/MT Fire Barrier Materials on Compliance with Approved Fire Protection Programs"
07/07/2005 Proposed Generic Letter 2005-XX, "Inaccessible or Underground Cable Failures That Disable Accident Mitigation Systems"
07/07/2005 Proposed Revision to Standard Review Plan Section 6.5.2, "Containment SPRAy as a Fission Product Cleanup System"
07/07/2005 Proposed Rulemaking to Amend 10 CFR Parts 19 and 20: Collection, Reporting, and Labeling Requirements, and Clarification of Dose Determination Methodology
06/14/2005 Draft Final Regulatory Guide, "Risk-Informed, Performancebased Fire Protection for Existing Light-Water Nuclear Power Plants"
06/14/2005 Interim Letter: Draft Safety Evaluation Report on Grand Gulf Early Site Permit Application
06/10/2005 Draft Final NUREG/CR-6850, "EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities"
06/10/2005 Draft Commission Paper on "Risk-Informed Alternatives to the Single Failure Criterion"
06/09/2005 Interim Report on the Safety Aspects of the License Renewal Application for the Point Beach Nuclear Plant, Units 1 and 2
06/07/2005 Draft Final Regulatory Guides on ASME Code Cases
06/03/2005 Proposed Bulletin Entitled "Emergency Preparedness and Response Actions for Security-Based Events"
05/13/2005 Guidance for Assessing Exemption Requests from Nuclear Power Plant Licensed Operator Staffing Requirements
05/13/2005 Report on the Safety Aspects of the License Renewal Application for Arkansas Nuclear One, Unit 2
05/06/2005 Draft Regulatory Guide DG-8029 (Proposed Revision 2 of Regulatory Guide 8.7), "Instructions for Recording and Reporting Occupational Radiation Dose Data"
04/14/2005 Report on the Safety Aspects of the License Renewal Application for the Joseph M. Farley Nuclear Plant, Units 1 and 2
04/08/2005 Draft NUREG, "Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications"
04/08/2005 Proposed Revision to Regulatory Guide 3.71, "Nuclear Criticality Safety Standards for Fuels and Materials Facilities"
04/08/2005 Proposed Revision to Management Directive 6.4, "Generic Issues Program"
03/14/2005

Proposed Rulemaking to Modify 10 CFR 50.46, "Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements"

03/11/2005 Pressurized Thermal Shock (PTS) Reevaluation Project: Technical Basis for Revision of the PTS Screening Criterion in the PTS Rule
03/11/2005 Interim Letter: Draft Safety Evaluation Report on North Anna Early Site Permit Application
03/11/2005 Revised Draft NUREG Report "Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process"
03/08/2005 Proposed Generic Letter 2005-XX, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power"
02/24/2005 Waterford Steam Electric Station, Unit 3 - Extended Power Uprate
02/24/2005 Review of the Final Safety Evaluation Report for the Mixed Oxide Fuel Fabrication Facility Construction Authorization Request
02/11/2005 Draft Regulatory Guide, DG-1137, "Guidelines for Lightning Protection for Nuclear Power Plants"


Privacy Policy | Site Disclaimer
Thursday, October 18, 2007