About DOE Button Organization Button News Button Contact Us Button
Search  
 
US Department of Energy Seal and Header Photo
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Information Library
You are here:


Virtual Media/Citizen's Guide

The Department of Energy is currently preparing a license application for the nation's first-ever repository for spent nuclear fuel and high-level radioactive waste. Below is information and background for reporters and citizens.

Why do we need a national repository for spent nuclear fuel and high-level radioactive waste?

Why was Yucca Mountain chosen?

  • Yucca Mountain is in a remote, desert area on federal land.
    Read More: Why Yucca Mountain? [pdf]
  • Most scientists around the world agree that the best place to put this radioactive material is in a facility deep underground.
    Read More: Why Do Scientists Think a Repository Will Work?
  • After over 20 years of research and billions of dollars of carefully planned and reviewed scientific field work, the Department of Energy has found that a repository at Yucca Mountain brings together the location, natural barriers, and design elements most likely to protect the health and safety of the public, including those Americans living in the immediate vicinity, now and long into the future.
    Read More:
    Site Recommendation

What is the plan for the repository?

How do we know the repository would be safe?

Who pays for Yucca Mountain?

  • The Nuclear Waste Policy Act of 1982 requires utilities which generate electricity using nuclear power to pay a fee of one tenth of one cent ($0.001) per kilowatt-hour into the Nuclear Waste Fund.
    Read More:
    Budget and Funding
  • The cost for the expected life cycle of the Program (from 1983 to 2133) is projected to be $96 billion in 2007 dollars.
    Read More: Total System Life Cycle Cost Report
  • Approximately $9 billion has been spent so far.
    Read More: OCRWM Budgets and Financial Information
  • Which states have paid most?
    Read More: Purchaser Fee Payments to the Nuclear Waste Fund
  • "For each year beyond 2017 that the repository’s opening is delayed, the Department estimates that U.S. taxpayers’ potential liability to contract holders who have paid into the Nuclear Waste Fund will increase by approximately $500 million. This will be in addition to the estimated current potential liability of approximately $7.0 billion due to the Department’s not beginning removal of spent nuclear fuel in 1998 as required by contract." -- OCRWM Director Ward Sproat, testifying before the U.S. House of Representatives.
    Read More of Sproat's testimony to Congress

How will the material get to Yucca Mountain?

Chronology and What's Next

Last reviewed: 08/08



 OCRWM Site Map   Privacy   Accessibility   Contact OCRWM   Downloads 

  PUBLICATIONS
 
:: The National Repository at Yucca Mountain [pdf]

 
:: The Safety of a Repository at Yucca Mountain [pdf]

:: The Path Forward: A National Repository at Yucca Mountain [pdf]

:: Why Yucca Mountain Brochure [pdf]

:: Why Yucca Mountain FAQ's [pdf]

:: Transportation Brochure [pdf]

:: Transportation FAQ's [pdf]

  Office of Civilian Radioactive Waste Management
This page last modified on: August 21, 2008  
The White House USA.gov E-gov IQ FOIA
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403 | e/General Contact


Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment