Love Henry Ct. Drainage Improvements
|
Project Information
This project will implement drainage improvements along Love Henry Ct. north of Southlake Blvd. and Bicentennial Park, and east of Shady Oaks Dr. An engineering study was conducted by Nathan D. Maier Consulting Engineers. The improvements to the current drainage system will include upsizing of the pipe and excavation of swales in order to prevent possible flooding on Love Henry Ct. during heavy rainfall conditions.
Project Details
Engineering Consultant: |
Teague Nall and Perkins, Inc.
|
Contractor:
|
TBD
|
Budget: |
$325,000
|
Construction Start Date: |
Spring 2014 |
Anticipated Completion Date:
|
Spring 2014 |
Status: |
Engineering design in progress |
Citizen Survey Focus Area: |
This project will address the Citizen Satisfaction Survey focus area of managing
storm water drainage. |
Staff Contact:
|
Steven Anderson, P.E., C.F.M
|
Title:
|
Civil Engineer
|
Phone Number
|
(817) 748-8101
|
For further information on this project, please see the "Public Works Capital Projects" quarterly report.
Return to the Active City Construction Projects page.
|
|
|