Hanford Cleanup:

DOE's Efforts to Close Tank Farms Would Benefit from Clearer Legal Authorities and Communication

GAO-21-73: Published: Jan 7, 2021. Publicly Released: Jan 7, 2021.

Additional Materials:

Contact:

David C. Trimble
(202) 512-3841
trimbled@gao.gov

 

Office of Public Affairs
(202) 512-4800
youngc1@gao.gov

The Department of Energy, under agreement with EPA and Washington State, is cleaning up radioactive waste at its Hanford site. It finished retrieving waste from one group of underground tanks—a "tank farm"—and it has begun retrieving waste from 2 of the remaining 17.

If DOE classifies the residual waste in tanks as something other than high-level waste, and the state approves it, DOE can fill the tanks with grout and leave them in place. This could avoid some risks and save $18 billion. But DOE's legal authority to do this is unclear.

We recommended that Congress consider clarifying DOE's authority to manage the residual waste.

Example of a Single-Shell Tank at Hanford, WA

Workers on a large tank with a ladder and a crane in the foreground

Additional Materials:

Contact:

David C. Trimble
(202) 512-3841
trimbled@gao.gov

 

Office of Public Affairs
(202) 512-4800
youngc1@gao.gov

What GAO Found

The Department of Energy (DOE) has retrieved nuclear waste from all the tanks at C-farm—the first of 18 tank farms (i.e., groupings of tanks) at DOE's Hanford site in southeastern Washington State. The waste is a byproduct of decades of nuclear weapons production and research. DOE is obligated under agreements with the state's Department of Ecology (Ecology) and the U.S. Environmental Protection Agency to move waste from older, single-shell tanks to newer, more durable, double-shell tanks and ultimately to dispose of it.

Example of a Tank and of Waste in a Tank at Hanford

Example of a Tank and of Waste in a Tank at Hanford

DOE intends to “close” the C-farm by leaving the nearly empty tanks in place and filling them with grout. However, DOE faces challenges, in part because this approach depends on: (1) DOE's determination under its directives that residual tank waste can be managed as a waste type other than high-level waste (HLW) and (2) Ecology's approval. DOE has started the determination process, but as GAO has previously found, DOE is likely to face a lawsuit because of questions about its legal authority. Ecology has raised concerns that the Nuclear Regulatory Commission (NRC) has not independently reviewed DOE's analysis for this determination. By Congress clarifying DOE's authority at Hanford to determine, with NRC involvement, that residual tank waste can be managed as a waste type other than HLW, DOE would be in a better position to move forward.

Another challenge DOE faces in closing C-farm is how to address contaminated soil caused by leaks or discharges of waste from the tanks. DOE and Ecology officials do not agree on a process for evaluating contaminated soil at C-farm or on what role NRC should play in this process. They interpret their agreement differently, particularly regarding whether NRC must review DOE's analysis of contaminated soil. If the two parties cannot resolve this issue, Ecology may deny DOE a permit for C-farm closure. By using an independent mediator to help reach agreement with Ecology on how to assess soil contamination, including NRC's role, DOE would be better positioned to avoid future cleanup delays.

DOE has not developed a long-term plan for tank-farm closure, in part, because a plan is not required. However, leading practices in program management call for long-term planning. In addition, DOE faces technical challenges that may take years to address as noted by representatives from various entities or tribal governments. For example, an internal DOE document states there is a 95 percent probability DOE will run out of space in its double shell tanks—space needed to continue retrieval operations. Planning for and building new tanks requires years of work. By developing a long-term plan, DOE could better prepare to address technical challenges.

Why GAO Did This Study

The Hanford site in Washington State contains about 54 million gallons of nuclear waste, which is stored in 177 underground storage tanks. In fiscal years 1997 through 2019, DOE spent over $10 billion to maintain Hanford's tanks and retrieve waste from them. DOE expects to spend at least $69 billion more on activities to retrieve tank waste and close tanks, according to a January 2019 DOE report.

Senate Report 116-48, accompanying the National Defense Authorization Act for Fiscal Year 2020, included a provision for GAO to review the status of tank closures at Hanford. GAO's report examines the status of DOE's efforts to retrieve tank waste, challenges DOE faces in its effort to close the C-farm, as well as DOE's approach for closing the remaining tank farms.

GAO toured the site; reviewed DOE documents, laws, and regulations; and interviewed officials and representatives from local, regional, and national entities and tribal governments.

What GAO Recommends

Congress should consider clarifying DOE's authority at Hanford to determine, with NRC involvement, whether residual tank waste can be managed as a waste type other than HLW. GAO is also making three recommendations, including that DOE (1) use an independent mediator to help reach agreement with Ecology on a process for assessing soil contamination, including NRC's role and (2) develop a long-term plan for its tank waste cleanup mission at Hanford. DOE concurred with all three recommendations.

For more information, contact David C. Trimble at (202) 512-3841 or trimbled@gao.gov.

Matter for Congressional Consideration

  1. Status: Open

    Comments: When we determine what steps the Congress has taken, we will provide updated information.

    Matter: Congress should consider clarifying, in a manner that does not impair the regulatory authorities of EPA and the state of Washington, DOE's authority at Hanford to determine, with NRC involvement, that residual tank waste can be managed as a waste type other than HLW.

Recommendations for Executive Action

  1. Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.

    Recommendation: The Secretary of Energy should direct the Assistant Secretary of the Office of Environmental Management to obtain the assistance of an independent, third-party mediator to help reach agreement with the State of Washington's Department of Ecology on a process for assessing the contaminated soil and what role NRC should play in this process. (Recommendation 1)

    Agency Affected: Department of Energy

  2. Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.

    Recommendation: The Secretary of Energy should direct the Assistant Secretary of the Office of Environmental Management to develop a long-term plan for DOE's waste retrieval and tank closure mission at the Hanford site. (Recommendation 2)

    Agency Affected: Department of Energy

  3. Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.

    Recommendation: The Secretary of Energy should direct the Assistant Secretary of the Office of Environmental Management to assess DOE's efforts to involve stakeholders in the Hanford tank closure process to ensure that DOE engages them in the decision-making process, communicates with them throughout the process in a way that addresses their concerns regarding technical challenges, and provides them with transparent information about the science and rationale behind decisions. (Recommendation 3)

    Agency Affected: Department of Energy

 

Explore the full database of GAO's Open Recommendations »

Jan 19, 2021

Jan 15, 2021

Jan 13, 2021

Dec 18, 2020

Dec 9, 2020

Dec 7, 2020

Nov 20, 2020

Nov 19, 2020

Looking for more? Browse all our products here