Site Profile
- Introduction
(Revised May 8, 2007)
PDF 47 KB (7 pages)
Revision Includes: Initiated to include a Purpose, Scope, and
Attributions and Annotations. Incorporates formal internal review
comments. This revision results in no change to the assigned dose
and no PER is required.
- Site
Description
(Revised May 18, 2007)
PDF 204 KB (30 pages)
Revision Includes: Purpose, Scope, and
Attributions and Annotations section included. Added references. No further
changes occurred as a result of formal internal review. This revision
results in no change to the assigned dose and no PER is required.
- Occupational Medical
Dose
(Revised June 18, 2007)
PDF 43 KB (5 pages)
Revision Includes: Includes Attributions and Annotations section. Constitutes
a total rewrite of the document. No further changes occurred as a
result of formal internal or NIOSH review. This revision results in no
change to the assigned dose and no PER is required.
- Occupational Environmental
Dose
(Approved July 30, 2007)
PDF 43 KB (5 pages)
Revision Includes: Included Attributions and
Annotations. Constitutes a total rewrite of the document.
- Occupational Internal
Dose
(Revised May 18, 2007)
PDF 43 KB (5 pages)
Revision Includes: Attribution and Annotation
section added. Constitutes a total rewrite of the document. No further
changes occurred as a result of formal internal review. This revision
results in no change to the assigned dose and no PER is required.
- Occupational External
Dose
(Revised September 10, 2007)
PDF 44 KB (5 pages)
Revision Includes: Initiated to include Attribution and Annotation
section. Constitutes a total rewrite of the document. No further
changes occurred as a result of formal internal and NIOSH review.
Top of Page
Technical Information Bulletins (TIBs)
At the current time, there are no TIBs for the Pacific Northwest National Laboratory.
Top of Page
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
At the current time, no PERs or PEPs specific to PNNL have been developed. However, we have developed PERs and PEPs that pertain to multiple sites. To view all PERs and PEPs that have been developed, please refer to the Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs) page.
Top of Page
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Below are the Worker Outreach Activities for PNNL:
- April 22, 2004
Meeting with Paper, Allied-Industrial, Chemical and Energy Workers (PACE) Local #8-0369; Fluor Hanford-Hanford Guards Union Local #21
(NOTE: The Pacific Northwest National Laboratory Site Profile was introduced and discussed during the Hanford meeting.)
Final Minutes
PDF 49 KB (8 pages)
Top of Page
Comments on PNNL Documents
How to Submit Comments
Comments on PNNL documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (055) on all comments.
Comments Received
At this time, no comments have been submitted on the Pacific Northwest National Laboratory Site Profile.
Top of Page
Previous Versions of PNNL Technical Documents
Site Profile: Introduction section
(Approved August 22, 2005)
PDF 39 KB (6 pages)
Site Profile: Site
Description
(Approved August 5, 2005)
PDF 274 KB (27 pages)
Site Profile: Occupational Medical
Dose
(Approved August 9, 2005)
PDF 88 KB (4 pages)
Site Profile: Occupational Environmental
Dose
(Approved August 12, 2005)
PDF 89 KB (4 pages)
Site Profile: Occupational Internal
Dose
(Approved August 12, 2005)
PDF 89 KB (4 pages)
Site Profile: Occupational External
Dose
(Approved August 12, 2005)
PDF 88 KB (4 pages)
Top of Page
Page last updated: September 11, 2007
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)
|