The Department of Energy’s (DOE) Office of Environmental Management (EM) manages one of the largest groundwater and soil remediation efforts in the world. The inventory at the EM sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic meters of soil and debris contaminated with radionuclides, metals, and organics. EM’s Office of Subsurface Closure is working with EM site managers around the country to help find solutions to their specific technical issues.  At the large sites such as Hanford, Savannah River and Oak Ridge, the Office of Subsurface Closure has conducted research and demonstration projects to test new technologies and remediation approaches.

The primary goal of the Office of Subsurface Closure is to expedite closure of major soil and groundwater sites and waste units. The Office of Subsurface Closure is locating existing technologies to leverage advances in science and engineering; focusing development of new technologies to overcome intractable technical barriers; and providing alternative clean up strategies through the technical assistance program.

Large complex groundwater plumes remain at these EM sites:

Tracking Restoration and Closure (TRAC) logo

Tracking Restoration and Closure

EM is transitioning the communication of site groundwater information from static reports to a customized, web-based mapping tool.  This web-based application is called TRAC (Tracking Restoration and Closure) and is designed to easily communicate information on groundwater plumes, remedial approaches, regulatory drivers, and cleanup progress at all sites within the DOE-EM complex.  Once established TRAC will replace the current groundwater database reports.

TRAC infographic and story map tools

The new web-based application will provide consistent information for all sites within the DOE complex, including:

  • Effective infographic and story map tools to communicate information on progress towards site closure;
    • Robust geospatial visualization of groundwater plumes;
    • Explanatory text, photographs and videos;
TRAC infographic and story map tools
  • Information synthesis on groundwater plumes across all DOE-EM sites, summarizing critical knowledge, such as:
    • Distribution of risk-driving contaminants across the complex;
    • Technologies used to remediate risk-driving contaminants;
    • Site cleanup priorities;
    • Regulatory decisions that have been issued at sites.

A staged release of TRAC is planned, with the initial release including a few major sites (Hanford, Savannah River, and Idaho) by the end of 2020.  Information on additional sites will be integrated into the TRAC application in subsequent fiscal years.

Technical Assistance Program

For over two decades, Savannah River National Laboratory has managed a dynamic and efficient national program sponsored by EM that provides teams of technical experts with a broad experience base to recommend strategies to address DOE’s challenging environmental problems when standard approaches have not worked. Industrial facilities typically select traditional approaches (e.g., pump and treat, soil vapor extraction) in the design and implementation of remedial strategies. At some sites, these approaches prove to be too costly, inadequate or ineffective. Alternatively, other sites struggle with implementation of innovative but less well understood approaches. Since 2006, the Technical Assistance Program has focused on providing support across the EM complex. During this time, 25 technical assistance teams have visited 11 EM sites and made recommendations that yielded an estimated cost savings of $100 million, generating a return on investment of 30 to 1 for the program.

Each technical assistance team is:

  • Selected to address a specific technical need;
  • Focuses on identification of key technical risks (known technical issues that could prevent project success) and identification of technical uncertainties (indefinite or unpredictable aspects of a project);
  • Works closely with sites and regulators to develop solutions and strategies that minimize detrimental impacts to the environment, project budgets and schedules; and
  • Develops phased solutions that may combine multiple technologies and recommends specific steps to optimize project implementation and performance.

An important goal of the Technical Assistance Program is to address the specific concerns of regulators and stakeholders and to facilitate acceptance of recommended approaches and solutions. On average, 3-4 technical assistance teams are deployed each year across the DOE complex to assist DOE site in addressing high priority issues/needs at selected sites.

Soil & Groundwater Remediation News

Paducah Marks 25 Years of Successful Pump-and-Treat Operations
November 17, 2020
EM’s Paducah Site has been the safe operation of the system to treat and reduce groundwater contamination.
Learn More
Innovation Key to Closure of Coal Yard at SRS
November 17, 2020
The final dump truck delivering limestone gravel came and went, setting the stage for the closure of a 12-acre legacy coal yard.
Learn More
EM Nevada Reaches 75% Completion of Groundwater Mission
November 3, 2020
The EM Nevada Program recently reached the final stage of groundwater activities.
Learn More
DOE, NNSA Celebrate Transfer of Nevada Sites for Long-Term Stewardship
October 27, 2020
EM has fulfilled a key part of its mission in Nevada, completing remediation activities on and around the historic Tonopah Test Range.
Learn More
New Well Set to Enhance Groundwater Treatment at Idaho Site
October 20, 2020
EM and cleanup contractor Fluor Idaho will assist the U.S. Geological Survey in drilling a well at the north end of the 890-square-mile Idaho site.
Learn More
Savannah River Site Closes Soil Cleanup System, Saving $264,000 Annually
October 6, 2020
A 12-year cleanup campaign conducted by EM at the Savannah River Site (SRS) has ended successfully.
Learn More
Hanford Site Delivers Safe Progress During Pandemic
September 29, 2020
As work ramped up, Hanford’s occupational medical services provider continued to adjust its services to help ensure the health of Hanford workers.
Learn More
INL Site to Study Cleanup Project for Completion Ahead of Schedule
September 15, 2020
A successful EM cleanup project at the Idaho National Laboratory (INL) Site is being studied to determine if it has met its objectives.
Learn More
Hanford Treats More Than 2 Billion Gallons of Groundwater Six Years in A Row
September 8, 2020
Workers at the Hanford Site are celebrating another year of significant progress in protecting the Columbia River.
Learn More
Oak Ridge Completes Major Soil Remediation Project at K-25 Footprint
July 21, 2020
Workers recently finished removing contaminated soil under a section of the former Building K-25 footprint in another major action