NATIONAL INFORMATION EXCHANGE MODEL

Latest News

The NIEM 5.0 release candidate 6 (RC6) is available for public review and comment through Tuesday, 27 October 2020. A couple of changes have been made to CUI components based on RC5 feedback. These are:

The NIEM 5.0 release candidate 5 (RC5) is available for public review and comment through Thursday, 22 October 2020. Several changes have been made to CUI components based on RC4 feedback. These are:

The NIEM Naming and Design Rules (NDR) 5.0 Beta 1 release is available for public review and comment through Monday, 02 November 2020.  The NDR specifies the data model, XML Schema components, and XML data for use with the National Information Exchange Model (NIEM).

Follow us on Twitter