The instructions for submitting this form (if required) are included in 7 CFR 1724, Electric Engineering, Architectural Services and Design Policies and Procedures.
Fld Name / |
Instruction |
Paragraph 1 |
First and Second Blanks: Enter date of Agreement Third Blank: Enter Owner’s name. Fourth and Fifth Blanks: Enter Engineer’s name and location. |
Paragraph 2 |
First Blank: Enter the total amount of the RUS loan or loan guarantee. Second Blank: Enter the amount of the RUS loan or loan guarantee that is for the generating plant. Third Blank: Enter the total estimated cost of the generating plant. Fourth Blank: Enter the details of the project scope. Sixth Blank: Enter the State where the project is located. Seventh Blank: Enter Owner’s RUS designation (e.g., AL001) |
Article II, Section 1 |
Enter the number of days allowed to prepare the Design Manual. |
Article II, Section 2 |
Enter the number of days allowed to prepare the Preliminary Plans. |
Article V, Section 2 |
Enter the maximum compensation under the Agreement. |
Article V, Section 7 |
Enter the interest rate as indicated. |
Article VI, Section 10 |
Enter the name and license information for the individual who will be in responsible charge of the project. |
Signature Block |
Enter Owner’s and Engineer’s names. (Sign printed copy.) |
Schedule A |
Enter the details of the compensation agreement. |