Project Overview
The project is needed to improve rail capacity, reliability, safety, efficiency, accessibility, and security, for both current and future long-term railroad operations at this historic station. The major project components include reconfiguration of the station tracks, a new train hall, bus facilities, and replacement parking facilities.
NEPA Process
FRA is currently preparing a Draft Environmental Impact Statement (DEIS) in compliance with the National Environmental Policy Act (NEPA) to evaluate the proposed project. NCPC is a cooperating agency due to the Commission’s approval authority for projects on federal land. The historic station, existing parking structure, and bus facilities are located on federal (FRA) land. NCPC will provide comments on the DEIS during the comment period.
Public comments on the DEIS should be provided to FRA.
NCPC Review
The Commission will review site and building plans for the FRA project as they are developed. The next concept review is anticipated after the conclusion of the DEIS review period. Subsequent preliminary and final reviews will occur as the project design development advances.
Adjacent Development
NCPC has reviewed several separate projects in and near Union Station. These include perimeter security (2008) and the Metro Station access and capacity enhancements (2014). NCPC will review referrals from the Zoning Commission for comments regarding the proposed private air rights development adjacent to the station. NCPC recently heard an
Information Presentation on this development.