Newsroom

Press Releases

Driving Innovation

Did you know the average EV driver can save up to $1,000 in fuel costs every year? Read more about how TVA's EV Initiative anticipates growing the number of EVs across the Valley to over 200,000 by 2028.

A Better Nesting Place

Ospreys will have new, safer places to nest near Watts Bar Nuclear Plant this spring, thanks to an ongoing project to move them away from nesting on TVA structures.

Another 2020 First—Wettest Ever

2020 is now officially the wettest year ever recorded in the Tennessee Valley. TVA has now managed three straight years of record rainfall.

New Podcast: Clean Energy and Rural America's Economic Rebound

Representatives from TVA, Google, and Origis Energy recently came together for an episode on the Currents Podcast from Norton Rose Fulbright.

Permitting Success

In the Tennessee Valley, the Section 26a permitting process serves as a vital link between TVA and property owners on the Tennessee River. Read more about the TVA staff supporting this work.

The Final Stack Falls

As part of the ongoing Widows Creek Fossil Plant demolition project, the final and largest stack, topping 1,000-feet, was safely imploded on Dec 3, 2020.

3D Printing Goes Nuclear

TVA will load four new 3D-printed fuel assembly brackets at its Browns Ferry nuclear power plant next spring. The brackets will be the first of their kind loaded into a commercial reactor and demonstrate the latest innovations in additive manufacturing and artificial intelligence.

Keeping it Small, Keeping it Local

TVA remains committed to its mission of serving the people of the Tennessee Valley, even in the toughest of times. Supporting small, diverse and local businesses is part of that commitment, and TVA spent more than 46% of its supplier spend with small and diverse businesses in fiscal year 2020—a total of more than $1.2 billion.

Know Your Boundaries

TVA manages 293,000 acres of public land, so it’s important that its 6,200 miles of boundaries be easily identified. Learn more about how we make our boundaries more visible.

High-Speed Fiber Blitz

TVA is stretching 2,700 miles of high-speed fiber across the Tennessee Valley in an effort to build a modernized electric grid. The $300-million investment is enhancing both transmission capability and security through the integration of emerging technologies.

Media Relations

Contact our Media Relations staff.

COVID

Coal Ash

TVA is an industry leader in the safe management and monitoring of coal ash. Learn how TVA is safely handling coal ash.

TVA in Memphis

So much is happening in the Memphis area, it deserves its own page! Read about the latest happenings in the Mid-South Valley.

Boone Dam Project

TVA has found the fix for seepage at Boone Dam: a composite seepage barrier made of non-erodible material. Construction will take five to seven years. Maximum safety measures will remain in place throughout the process. Read more about Boone Dam.

TVA Logos

Download logos and usage guidelines.

TVA at a Glance

Want more information about TVA? You've got it! Our at-a-glance fact sheet covers our history, mission, generating assets, structure, key business drivers and more. Get the facts now

For Kids & Teachers

Writing a school report? Looking for STEM activities or home school projects? Want a kid's view of TVA? Use these resources to find out about our history and ongoing mission of service.

  • TVA Kids has fun information about our history, how we make electricity and help the environment. Use the homework helpers in your next assignment!
  • TVA STEM has lessons and activities that meet Tennessee state academic standards. Also: Learn about STEM careers!
  • Currents of Change has interactive history lessons that follow the Tennessee Valley from the Great Depression through today. Lessons meet Tennessee and Alabama state academic standards.