Construction Report

This page contains links and information to Facilities’ monthly construction reports, which detail where you can expect to find campus mobility obstructed by construction activities.

Click on the construction areas in the map to find more information, or open the map in a new window by clicking here. The attachment at the bottom of the page is a link to a text-only report of this information.

December 2018 - January 2019 Construction Obstruction Report

Project Name: Joe Greene Hall and Tour Center

Project Lead: Janna Morgan

Project Start Date: 1/11/2017

Project End Date: 2/27/2019

Location Description: SE side of Kerr Hall

Project Summary: Construct new Tour Center and dormitory

Areas Impacted: Pedestrian and vehicular traffic blocked for project duration.

 

Project Name: Biomedical Engineering Lab Construction

Project Lead: Jan Mak

Project Start Date: 4/30/2018

Project End Date: 5/30/2019

Location Description: Northwest corner of main Discovery Park building

Project Summary: Build new lab space for Biomedical engineering lab.

Areas Impacted: Pedestrian traffic on northwest side of building will be obstructed for project duration.

 

Project Name: Track & Field Stadium Construction

Project Lead: Terri Pierce

Project Start Date: 10/1/2017

Project End Date: 1/30/2019

Location Description: South of Warranch Tennis Complex

Project Summary: Construct new Track & Field stadium

Areas Impacted: Pedestrian traffic on south and east of Warranch Tennis Complex will be blocked for project duration.

 

Project Name: Indoor Practice Facility Construction

Project Lead: Terri Pierce

Project Start Date: 9/12/2018

Project End Date: 7/31/2019

Location Description: Football practice fields

Project Summary: Build new indoor practice facility

Areas Impacted: Pedestrian traffic will be blocked for project duration.

 

Project Name: Sack-N-Save Renovation

Project Lead: Kim Nguyen

Project Start Date: 3/1/2018

Project End Date: 3/31/2019

Location Description: 1500 South I-35E

Project Summary: Renovate interior building space and refurbish parking lot.

Areas Impacted: Pedestrian and vehicular traffic will be blocked for next two months to allow for parking lot construction.

 

Project Name: Hickory Street Capital Improvement Program

Project Lead: Atmos

Project Start Date: 11/1/2017

Project End Date: 2/28/2019

Location Description: Hickory Street between Avenue B and Welch Street

Project Summary: Replace existing gas main and service connections

Areas Impacted: Pedestrian and vehicular traffic may be impacted during project.

 

Project Name: Wooten Hall Fire System Construction

Project Lead: Kim Nguyen

Project Start Date: 6/20/2018

Project End Date: 2/1/2019

Location Description: Exterior spaces around Wooten Hall

Project Summary: Install new fire sprinkler system

Areas Impacted: Pedestrian traffic will be obstructed for duration of project.

 

Project Name: Admin Landscaping Construction

Project Lead: Chad Davenport

Project Start Date: 7/9/2018

Project End Date: 2/1/2019

Location Description: Greenspace between Hurley and Willis Library

Project Summary: Improve area drainage and landscaping

Areas Impacted: Pedestrian and vehicular traffic will be blocked for project duration.

 

Project Name: Art Building Mechanical, Electrical and Plumbing Upgrade

Project Lead: Jeannine Vail

Project Start Date: 7/23/2018

Project End Date: 1/14/2019

Location Description: Old Art Building and greenspace west of building

Project Summary: Upgrade existing building infrastructure

Areas Impacted: Pedestrian and vehicular traffic will be blocked for project duration.

 

Project Name: Lot 80 Expansion

Project Lead: Helen Bailey

Project Start Date: 7/1/2018

Project End Date: 2/1/2019

Location Description: Greenspace west of existing Lot 80 parking

Project Summary: Construct new parking lot and restroom facility

Areas Impacted: Vehicular and pedestrian traffic will be blocked for project duration

 

Project Name: Curry Hall Parking Lot Construction

Project Lead: Randy Salsman

Project Start Date: 9/9/2018

Project End Date: 1/11/2019

Location Description: ADA lot west of Curry Hall

Project Summary: Expand and restripe parking lot to improve accessibility

Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.

 

Project Name: Avenue C Gateway Construction

Project Lead: Cheryl Smith

Project Start Date: 9/24/2018

Project End Date: 1/31/2019

Location Description: Avenue C between Hickory and Mulberry Streets

Project Summary: Construct new gateway entrance to the University

Areas Impacted: Vehicular and pedestrian traffic along street will be blocked for project duration.

 

 

Project Name: New Art Addition

Project Lead: Janell Cottan

Project Start Date: 10/1/2018

Project End Date: 12/8/2018

Location Description: Greenspace east of GAB building

Project Summary: Install new art work

Areas Impacted: Pedestrian traffic will be blocked for project duration.

 

Project Name: Fouts Field Demolition

Project Lead: Traci Jones

Project Start Date: 11/15/2018

Project End Date: 1/15/2019

Location Description: Fouts Field Bleacher Structure

Project Summary: Demolish bleachers to make room for new parking

Areas Impacted: Fouts Field and surrounding parking will be blocked for project duration

 

Project Name: Lot 20 Expansion Phase 2A

Project Lead: Traci Jones

Project Start Date: 1/2/2019

Project End Date: 4/15/2019

Location Description: North side of Fouts Field from Risk Management Building to USB

Project Summary: Install new drainage infrastructure and build parking lot

Areas Impacted: Pedestrian traffic will be blocked for duration of project

 

Project Name: Lot 20 Expansion Phase 2B

Project Lead: Traci Jones

Project Start Date: 1/2/2019

Project End Date: 7/20/2019

Location Description: South side of Fouts Field and surrounding parking lot

Project Summary: Construct new parking lot in place of Fouts Field

Areas Impacted: Vehicular and pedestrian traffic will be blocked for duration of project.

 

Project Name: Lot 20 Expansion Phase 3

Project Lead: Traci Jones             

Project Start Date: 12/17/2018

Project End Date: 2/17/2019

Location Description: Lot 20 from Risk Management building around north side of Fouts to USB building

Project Summary: Build new parking lot

Areas Impacted: Pedestrian and vehicular traffic will be blocked for project duration

 

Project Name: Lot 20 Expansion Phase 4

Project Lead: Traci Jones

Project Start Date: 12/17/2018

Project End Date: 1/13/2019

Location Description: Main entrance to Lot 20 off of North Texas Blvd west to Risk Management building

Project Summary: Demolish existing lot and building new lot entrance to support bus traffic

Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.

 

Project Name: New Dining Facility Construction

Project Lead: Jeannine Vail

Project Start Date: 1/2/2019

Project End Date: 4/30/2020

Location Description: Greenspace east of Business Leadership Building

Project Summary: Build new dining facility

Areas Impacted: Pedestrian traffic will be blocked for duration of project.

 

Project Name: Student Union Dock and Parking Refurbishment

Project Lead: Randy Salsman

Project Start Date: 12/15/2018

Project End Date: 1/15/2019

Location Description: Loading dock and surrounding drive and parking

Project Summary: Renovate approach to loading dock to accommodate large delivery trucks

Areas Impacted: Loading dock and parking spaces east of loading dock will be blocked for project duration.

 

Project Name: Kendolph Street Restriping

Project Lead: Randy Salsman

Project Start Date: 12/16/2018

Project End Date: 1/18/2019

Location Description: Kendolph Street between I-35 frontage road and Eagle Drive

Project Summary: Restripe street

Areas Impacted: Parking will be impacted during project along street.

 

Project Name: Physical Ed Building Roof Repair

Project Lead: Randy Salsman

Project Start Date: 11/15/2018

Project End Date: 1/4/2019

Location Description: Building and parking on northwest side of building

Project Summary: Repair and replace the building roof.

Areas Impacted: Parking around building and pedestrian traffic may be impacted during project.

 

Project Name: Murchinson Irrigation Repair and Landscaping

Project Lead: Cheryl Smith

Project Start Date: 12/3/2018

Project End Date: 12/31/2018

Location Description: Area north of I-35 frontage road sound wall and Murchinson Building

Project Summary: Repair irrigation system and construct new landscaping

Areas Impacted: Service drive on southeast side of building will be blocked for project duration.