December 2018 - January 2019 Construction Obstruction Report
Project Name: Joe Greene Hall and Tour Center
Project Lead: Janna Morgan
Project Start Date: 1/11/2017
Project End Date: 2/27/2019
Location Description: SE side of Kerr Hall
Project Summary: Construct new Tour Center and dormitory
Areas Impacted: Pedestrian and vehicular traffic blocked for project duration.
Project Name: Biomedical Engineering Lab Construction
Project Lead: Jan Mak
Project Start Date: 4/30/2018
Project End Date: 5/30/2019
Location Description: Northwest corner of main Discovery Park building
Project Summary: Build new lab space for Biomedical engineering lab.
Areas Impacted: Pedestrian traffic on northwest side of building will be obstructed for project duration.
Project Name: Track & Field Stadium Construction
Project Lead: Terri Pierce
Project Start Date: 10/1/2017
Project End Date: 1/30/2019
Location Description: South of Warranch Tennis Complex
Project Summary: Construct new Track & Field stadium
Areas Impacted: Pedestrian traffic on south and east of Warranch Tennis Complex will be blocked for project duration.
Project Name: Indoor Practice Facility Construction
Project Lead: Terri Pierce
Project Start Date: 9/12/2018
Project End Date: 7/31/2019
Location Description: Football practice fields
Project Summary: Build new indoor practice facility
Areas Impacted: Pedestrian traffic will be blocked for project duration.
Project Name: Sack-N-Save Renovation
Project Lead: Kim Nguyen
Project Start Date: 3/1/2018
Project End Date: 3/31/2019
Location Description: 1500 South I-35E
Project Summary: Renovate interior building space and refurbish parking lot.
Areas Impacted: Pedestrian and vehicular traffic will be blocked for next two months to allow for parking lot construction.
Project Name: Hickory Street Capital Improvement Program
Project Lead: Atmos
Project Start Date: 11/1/2017
Project End Date: 2/28/2019
Location Description: Hickory Street between Avenue B and Welch Street
Project Summary: Replace existing gas main and service connections
Areas Impacted: Pedestrian and vehicular traffic may be impacted during project.
Project Name: Wooten Hall Fire System Construction
Project Lead: Kim Nguyen
Project Start Date: 6/20/2018
Project End Date: 2/1/2019
Location Description: Exterior spaces around Wooten Hall
Project Summary: Install new fire sprinkler system
Areas Impacted: Pedestrian traffic will be obstructed for duration of project.
Project Name: Admin Landscaping Construction
Project Lead: Chad Davenport
Project Start Date: 7/9/2018
Project End Date: 2/1/2019
Location Description: Greenspace between Hurley and Willis Library
Project Summary: Improve area drainage and landscaping
Areas Impacted: Pedestrian and vehicular traffic will be blocked for project duration.
Project Name: Art Building Mechanical, Electrical and Plumbing Upgrade
Project Lead: Jeannine Vail
Project Start Date: 7/23/2018
Project End Date: 1/14/2019
Location Description: Old Art Building and greenspace west of building
Project Summary: Upgrade existing building infrastructure
Areas Impacted: Pedestrian and vehicular traffic will be blocked for project duration.
Project Name: Lot 80 Expansion
Project Lead: Helen Bailey
Project Start Date: 7/1/2018
Project End Date: 2/1/2019
Location Description: Greenspace west of existing Lot 80 parking
Project Summary: Construct new parking lot and restroom facility
Areas Impacted: Vehicular and pedestrian traffic will be blocked for project duration
Project Name: Curry Hall Parking Lot Construction
Project Lead: Randy Salsman
Project Start Date: 9/9/2018
Project End Date: 1/11/2019
Location Description: ADA lot west of Curry Hall
Project Summary: Expand and restripe parking lot to improve accessibility
Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.
Project Name: Avenue C Gateway Construction
Project Lead: Cheryl Smith
Project Start Date: 9/24/2018
Project End Date: 1/31/2019
Location Description: Avenue C between Hickory and Mulberry Streets
Project Summary: Construct new gateway entrance to the University
Areas Impacted: Vehicular and pedestrian traffic along street will be blocked for project duration.
Project Name: New Art Addition
Project Lead: Janell Cottan
Project Start Date: 10/1/2018
Project End Date: 12/8/2018
Location Description: Greenspace east of GAB building
Project Summary: Install new art work
Areas Impacted: Pedestrian traffic will be blocked for project duration.
Project Name: Fouts Field Demolition
Project Lead: Traci Jones
Project Start Date: 11/15/2018
Project End Date: 1/15/2019
Location Description: Fouts Field Bleacher Structure
Project Summary: Demolish bleachers to make room for new parking
Areas Impacted: Fouts Field and surrounding parking will be blocked for project duration
Project Name: Lot 20 Expansion Phase 2A
Project Lead: Traci Jones
Project Start Date: 1/2/2019
Project End Date: 4/15/2019
Location Description: North side of Fouts Field from Risk Management Building to USB
Project Summary: Install new drainage infrastructure and build parking lot
Areas Impacted: Pedestrian traffic will be blocked for duration of project
Project Name: Lot 20 Expansion Phase 2B
Project Lead: Traci Jones
Project Start Date: 1/2/2019
Project End Date: 7/20/2019
Location Description: South side of Fouts Field and surrounding parking lot
Project Summary: Construct new parking lot in place of Fouts Field
Areas Impacted: Vehicular and pedestrian traffic will be blocked for duration of project.
Project Name: Lot 20 Expansion Phase 3
Project Lead: Traci Jones
Project Start Date: 12/17/2018
Project End Date: 2/17/2019
Location Description: Lot 20 from Risk Management building around north side of Fouts to USB building
Project Summary: Build new parking lot
Areas Impacted: Pedestrian and vehicular traffic will be blocked for project duration
Project Name: Lot 20 Expansion Phase 4
Project Lead: Traci Jones
Project Start Date: 12/17/2018
Project End Date: 1/13/2019
Location Description: Main entrance to Lot 20 off of North Texas Blvd west to Risk Management building
Project Summary: Demolish existing lot and building new lot entrance to support bus traffic
Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.
Project Name: New Dining Facility Construction
Project Lead: Jeannine Vail
Project Start Date: 1/2/2019
Project End Date: 4/30/2020
Location Description: Greenspace east of Business Leadership Building
Project Summary: Build new dining facility
Areas Impacted: Pedestrian traffic will be blocked for duration of project.
Project Name: Student Union Dock and Parking Refurbishment
Project Lead: Randy Salsman
Project Start Date: 12/15/2018
Project End Date: 1/15/2019
Location Description: Loading dock and surrounding drive and parking
Project Summary: Renovate approach to loading dock to accommodate large delivery trucks
Areas Impacted: Loading dock and parking spaces east of loading dock will be blocked for project duration.
Project Name: Kendolph Street Restriping
Project Lead: Randy Salsman
Project Start Date: 12/16/2018
Project End Date: 1/18/2019
Location Description: Kendolph Street between I-35 frontage road and Eagle Drive
Project Summary: Restripe street
Areas Impacted: Parking will be impacted during project along street.
Project Name: Physical Ed Building Roof Repair
Project Lead: Randy Salsman
Project Start Date: 11/15/2018
Project End Date: 1/4/2019
Location Description: Building and parking on northwest side of building
Project Summary: Repair and replace the building roof.
Areas Impacted: Parking around building and pedestrian traffic may be impacted during project.
Project Name: Murchinson Irrigation Repair and Landscaping
Project Lead: Cheryl Smith
Project Start Date: 12/3/2018
Project End Date: 12/31/2018
Location Description: Area north of I-35 frontage road sound wall and Murchinson Building
Project Summary: Repair irrigation system and construct new landscaping
Areas Impacted: Service drive on southeast side of building will be blocked for project duration.