Projects

Interior of Wooten Hall under construction
Wooten Life Safety

UNT Facilities Planning, Design and Construction is leading a life safety project in Wooten Hall. A code upgrade to install sprinklers and isolate a monumental staircase is underway to create safe egress. A wall will be built in the staircase to enclose it, therefore preventing smoke from traveling from floor to floor in the case of a fire emergency. An interior refresh updated look will accompany this project by renovating existing ceilings in corridors.  This is a one-time project that will last the lifetime of the building.

December 2018
Eagle Point Lot 80
Eagle Point Lot 80

The University has increased demand for additional parking. This project will construct a new parking lot at Eagle Point adjacent to Victory Hall and proximate to Apogee Stadium. The proposed lot design will include parking spaces, new lighting, and tailgating facilities (as a Phase 1) and a restroom facility (as a Phase 2). The project will increase parking capacity by approximately 537 spaces including 9 RV spaces for tailgaters.

August 2018
Dave in News
Sycamore Hall 2nd Floor Renovation

Renovation for the Maybourn School of Journalism.

March 2018
Clark Hall Bakery Remodel
Clark Hall Bakery Remodel

An 1800 SF immediate need are to be designed, demolished & construction to install ovens, retarders & mixer for Student Union support.  The remaining area consideration for bakery expansion and includes additional freezer space.

March 2018