This Community can only improve through your valued input - provide yours today!
                                                                                                            Click Here for SharePoint 2013 Migration Information and News
Click here   image of a classical greek architecture representing DAU's strength as a business university instructing in DoD Acquisition
HomeContactAbout ACCPrivacyTutorialDoD CertificateReport an Issue  
.

Reliability, Availability and Maintainability (RAM) Policy - ASN RDA - 26 Aug 2008

References
0
Helpful Votes
Long Description
The Department of the Navy recognizes opportunities to improve RAM and is reinvigorating our processes to achieve it.  The focus of this effort is to exercise a disciplined approach to ensuring definite and quantifiable RAM requirements are built into system design and that these requirements are accurately assessed at each stage of the acquisition process.
File Title
Reliability, Availability and Maintainability (RAM) Policy - ASN RDA - 26 Aug 2008
File
Benefit/Value
Increased emphasis on RAM during the Navy acquisition process.  Assessment and verification of RAM requirements and progress toward RAM design maturity during the design phases and subsequent acquisition life cycle phase is included in the Two Pass/Six Gate Process for ACAT I/II programs; the Systems Engineering Technical Reviews; Independent Logistics Assessments, and independent risk assessments and program reviews.

Popular Tags

Page Information

Popularity of this page:
#1165 of 1528 items
0 Helpful votes
At this page:
8485 Page Views 0 Pages Emailed
1 Meta-card Views 1089 Attachments Downloaded
0 Relationships and Highlights 0 Videos Downloaded
ID231482
Date CreatedThursday, September 4, 2008 11:34 AM
Date ModifiedThursday, September 4, 2008 11:34 AM
Version Comment:

REQUEST AN ACCOUNT Benefits of Membership I Forgot My Login Information

Browse

https://acc.dau.mil/UI/img/bo/minus.gifLife Cycle Logistics
https://acc.dau.mil/UI/img/bo/minus.gifProduct Support Policy, Guidance, Tools...
https://acc.dau.mil/UI/img/bo/plus.gifProduct Support Guidance
https://acc.dau.mil/UI/img/bo/minus.gifProduct Support Policy & Statutes
https://acc.dau.mil/UI/img/bo/minus.gifLCSP Outline
https://acc.dau.mil/UI/img/bo/plus.gifFAQ
https://acc.dau.mil/UI/img/bo/plus.gifGeneral Expectations
https://acc.dau.mil/UI/img/bo/plus.gifLCSP by Phase
https://acc.dau.mil/UI/img/bo/plus.gifThe LCSP and the RFP
https://acc.dau.mil/UI/img/bo/plus.gifProduct Support Tools & Training
https://acc.dau.mil/UI/img/bo/minus.gif12 Integrated Product Support (IPS)...
https://acc.dau.mil/UI/img/bo/minus.gifProduct Support Management
https://acc.dau.mil/UI/img/bo/plus.gifAir Force Product Support Tool Kit...
https://acc.dau.mil/UI/img/bo/plus.gifConfiguration Management (CM)
https://acc.dau.mil/UI/img/bo/plus.gifContinuous Process Improvement (CPI)
https://acc.dau.mil/UI/img/bo/plus.gifMilitary Equipment Valuation (MEV) and...
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Planning
https://acc.dau.mil/UI/img/bo/minus.gifRetrograde, Recapitalization and Reset
https://acc.dau.mil/UI/img/bo/plus.gifSupply Support
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage &...
https://acc.dau.mil/UI/img/bo/minus.gifMaintenance Planning & Management
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Management
https://acc.dau.mil/UI/img/bo/plus.gifPrognostics & Health Management (PHM)...
https://acc.dau.mil/UI/img/bo/minus.gifPublic-Private Partnerships (PPP)
https://acc.dau.mil/UI/img/bo/minus.gifDesign Interface
https://acc.dau.mil/UI/img/bo/plus.gifCorrosion Prevention & Control
https://acc.dau.mil/UI/img/bo/minus.gifLead-Free Electronics/Solder
https://acc.dau.mil/UI/img/bo/plus.gifMilitary Specifications, Standards and...
https://acc.dau.mil/UI/img/bo/plus.gifParts Management Program
https://acc.dau.mil/UI/img/bo/minus.gifReliability Centered Maintenance (RCM)
https://acc.dau.mil/UI/img/bo/plus.gifOSD Reliability Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifU.S. Air Force Reliability Centered...
https://acc.dau.mil/UI/img/bo/plus.gifU.S. Army Reliability Centered...
https://acc.dau.mil/UI/img/bo/plus.gifU.S. Marine Corps Reliability Centered...
https://acc.dau.mil/UI/img/bo/plus.gifU.S. Navy Reliability Centered...
https://acc.dau.mil/UI/img/bo/minus.gifSustaining Engineering
https://acc.dau.mil/UI/img/bo/minus.gifAging Systems
https://acc.dau.mil/UI/img/bo/minus.gifContinuous Modernization
https://acc.dau.mil/UI/img/bo/plus.gifDMSMS Knowledge Sharing Portal
https://acc.dau.mil/UI/img/bo/plus.gifObsolescence Management
https://acc.dau.mil/UI/img/bo/plus.gifDemil and Disposal
https://acc.dau.mil/UI/img/bo/plus.gifModification Management
https://acc.dau.mil/UI/img/bo/plus.gifStructural Integrity Programs (SIP)
https://acc.dau.mil/UI/img/bo/plus.gifSustaining Engineering
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Data
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources
https://acc.dau.mil/UI/img/bo/plus.gifFacilities & Infrastructure
https://acc.dau.mil/UI/img/bo/plus.gifManpower & Personnel
https://acc.dau.mil/UI/img/bo/plus.gifSupport Equipment
https://acc.dau.mil/UI/img/bo/plus.gifTraining & Training Support
https://acc.dau.mil/UI/img/bo/minus.gifProduct Support Manager (PSM)
https://acc.dau.mil/UI/img/bo/plus.gifProduct Support Strategy Development...
https://acc.dau.mil/UI/img/bo/minus.gifAnalysis & Assessment
https://acc.dau.mil/UI/img/bo/plus.gifProduct Support Analyses
https://acc.dau.mil/UI/img/bo/plus.gifModeling & Simulation
https://acc.dau.mil/UI/img/bo/minus.gifRelated References & Resources
https://acc.dau.mil/UI/img/bo/minus.gifIndependent Logistics Assessments (ILA)
https://acc.dau.mil/UI/img/bo/minus.gifResources & Tools
https://acc.dau.mil/UI/img/bo/minus.gifTechnical Mgt Resources & Tools
https://acc.dau.mil/UI/img/bo/minus.gifLogistics Modeling & Simulation (M&S)
https://acc.dau.mil/UI/img/bo/plus.gifWorkshop on M&S for Logistics and...
https://acc.dau.mil/UI/img/bo/minus.gifReliability and Maintainability
https://acc.dau.mil/UI/img/bo/plus.gifStandards and Standardization
https://acc.dau.mil/UI/img/bo/plus.gifSupportability
https://acc.dau.mil/UI/img/bo/minus.gifProduct Support Resources & Tools
https://acc.dau.mil/UI/img/bo/plus.gifAir Force Logistics Health Assessment...
https://acc.dau.mil/UI/img/bo/minus.gifLife Cycle Cost (LCC)
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Acquisition Framework View
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Transformation
https://acc.dau.mil/UI/img/bo/plus.gifQuadrennial Defense Review (QDR) Reports
https://acc.dau.mil/UI/img/bo/minus.gifSupport Planning and Analysis
https://acc.dau.mil/UI/img/bo/plus.gifU.S. Army Materiel Command Logistics...
https://acc.dau.mil/UI/img/bo/plus.gifAdditional Resources & Tools
https://acc.dau.mil/UI/img/bo/plus.gifProfessional Development
ACC Practice Center Version 3.2
  • Application Build 3.2.9
  • Database Version 3.2.9