Previous PageTable Of ContentsDFARS Home PageNext Page

DFARS PGI 216_4



(Revised April 6, 2015)

PGI 216.4--INCENTIVE CONTRACTS

PGI 216.401 General.

PGI 216.402 Application of predetermined, formula-type incentives.

PGI 216.402-2 Technical performance incentives.

PGI 216.403 Fixed-price incentive contracts.

PGI 216.403-1 Fixed-price incentive (firm target) contracts.

PGI 216.403-2 Fixed-price incentive (successive targets) contracts.

PGI 216.405 Cost-reimbursement incentive contracts.

PGI 216.405-1 Cost-plus-incentive-fee contracts.

PGI 216.405-2 Cost-plus-award-fee contracts.

PGI 216.470 Other applications of award fees.

TABLE 16-1, PERFORMANCE EVALUATION CRITERIA

   

Submarginal

Marginal

Good

Very Good

Excellent

A

Time of

Delivery.

(A-1)

Adherence to plan schedule.

Consistently late on 20% plans

Late on 10% plans w/o prior agreement

Occasional plan late w/o justification.

Meets plan schedule.

Delivers all plans on schedule & meets prod. Change requirements on schedule

 

(A-2)

Action on Anticipated delays.

Does not expose changes or resolve them as soon as recognized.

Exposes changes but is dilatory in resolution on plans.

Anticipates changes, advise Shipyard but misses completion of design plans 10%.

Keeps Yard posted on delays, resolves independently on plans.

Anticipates in good time, advises Ship-

yard, resolves independently and meets production requirements.

 

(A-3)

Plan Main-

tenance.

Does not

complete

interrelated systems studies concurrently.

System studies completed but constr. Plan changes delayed.

Major work plans coordinated in time to meet production schedules.

Design changes from studies and interrelated plant issued in time to meet product schedules.

Design changes, studies resolved and test data issued ahead of production requirements.

B

Quality of Work.

(B-1)

Work Appearance.

25% dwgs. Not compatible with Shipyard repro. processes and use.

20% not compatible with Shipyard repro. processes and use.

10% not compatible with Shipyard repro. processes and use.

0% dwgs prepared by Des. Agent not compatible with Shipyard repro. processes and use.

0% dwgs. Presented incl. Des. Agent, vendors, subcontr. Not compatible with Shipyard repro processes and use.

 

(B-2)

Thoroughness and Accuracy of Work.

Is brief on plans tending to leave questionable situations for Shipyard to resolve.

Has followed guidance, type and standard dwgs.

Has followed guidance, type and standard dwgs. Questioning and resolving doubtful areas.

Work complete with notes and thorough explanations for anticipated questionable areas.

Work of highest caliber incorporating all pertinent data required including related activities.

 

(B-3)

Engineering Competence.

Tendency to follow past practice with no variation to meet reqmts. job in hand.

Adequate engrg. To use & adapt existing designs to suit job on hand for routine work.

Engineered to satisfy specs., guidance plans and material provided.

Displays excellent knowledge of constr. Reqmts. considering systems aspect, cost, shop capabilities and procurement problems.

Exceptional knowledge of Naval shipwork & adaptability to work process incorporating knowledge of future planning in Design.

B

Quality of Work (Cont’d)

(B-4)

Liaison Effectiveness

Indifferent to requirements of associated activities, related systems, and Shipyard advice.

Satisfactory but dependent on Shipyard of force resolution of problems without constructive recommen--dations to subcontr. or vendors.

Maintains normal contract with associated activities depending on Shipyard for problems requiring military resolution.

Maintains independent contact with all associated activities, keeping them informed to produce compatible design with little assistance for Yard.

Maintains expert contact, keeping Yard informed, obtaining info from equip, supplies w/o prompting of Shipyard.

 

(B-5)

Constant surveillance required to keep job from slipping—assign to low priority to satisfy needs.

Requires occasional prodding to stay on schedule & expects Shipyard resolution of most problems.

Normal interest and desire to provide workable plans with average assistance & direction by Shipyard.

Complete & accurate job. Free of incom-

patibilities with little or no direction by Shipyard.

Develops complete and accurate plans, seeks out problem areas and resolves with assoc. act. ahead of schedule.

C

Effective-ness in Control-

ling and/or Reducing Costs

(C-1)

Utilization of Personnel

Planning of work left to designers on drafting boards.

Supervision sets & reviews goals for designers.

System planning by supervisory, personnel, studies checked by engineers.

Design parameters established by system engineers & held in design plans.

Mods. to design plans limited to less than 5% as result lack engrg. System correlation.

 

(C-2)

Control Direct Charges (Except Labor)

Expenditures not controlled for services.

Expenditures reviewed occasionally by supervision.

Direct charges set & accounted for on each work package.

Provides services as part of normal design function w/o extra charges.

No cost overruns on original estimates absorbs service demands by Shipyard.

 

(C-3)

Performance to Cost Estimate

Does not meet cost estimate for original work or changes 30% time.

Does not meet cost estimate for original work or changes 20% time.

Exceeds original est. on change orders 10% time and meets original design costs.

Exceeds original est. on changing orders 5% time.

Never exceeds estimates of original package or change orders.

TABLE 16-2, CONTRACTOR PERFORMANCE EVALAUTION REPORT

    Ratings

Period of ____________________________________

Excellent

Contract Number ______________________________

Very Good

Contractor ____________________________________

Marginal

Date of Report _________________________________

Submarginal

PNS Technical Monitor/s________________________

 

____________________________________________

CATEGORY

CRITERIA

RATING

ITEM FACTOR

EVALUATION RATING

CATEGORY FACTOR

EFFICIENCY RATING

A

TIME OF DELIVERY

                 
 

A-1 Adher-ence to Plan Schedule

________

x

.40

=

__________

       
 

A-2 Action on

Anticipated Delays

________

x

.30

=

__________

       
 

A-3 Plan Maintenance

________

x

.30

=

__________

       
 

Total Item Weighed Rating

__________

x

.30

=

__________

B

QUALITY OF WORK

                 
 

B-1 Work Appearance

________

x

.15

=

__________

       
 

B-2 Thorough-ness and Accuracy of Work

________

x

.30

=

__________

       
 

B-3 Engineering Competence

________

x

.20

=

__________

       
 

B-4 Liaison Effectiveness

________

x

.15

=

__________

       
 

B-5 Indepen-dence and Initiative

________

x

.15

=

__________

       
 

Total Item Weighed Rating

__________

x

.40

=

__________

C

EFFECTIVE-NESS IN CONTROL-LING AND/OR REDUCING COSTS

                 
 

C-1 Utilization of Personnel

_______

x

.30

=

__________

       
 

C-2 Control of all Direct Charges Other than Labor

_______

x

.30

=

__________

       
 

C-3 Performance to Cost Estimate

_______

x

.40

=

__________

       
 

Total Item Weighed Rating

__________

x

.30

=

__________

 
 

TOTAL WEIGHT RATING _________________________________

 

Rated by: _________________________________________________

 

Signature(s) _______________________________________________

NOTE: Provide supporting data and/or justification for below average or outstanding item ratings.

Previous PageTop Of PageTable Of ContentsDFARS Home PageNext Page