Back to Top Skip to main content

Health.mil: the official website of the Military Health System (MHS) and the Defense Health Agency (DHA)

Utility Navigation Links

Social Media Links

Screen time impacts dream time

Time spent with smartphones, tablets, and computers can impact your ability to get healthy sleep. Turn off handheld devices and televisions at least two hours before bedtime. Try to avoid lying in bed and scrolling through social media and email before bedtime too. (U.S. Air Force photo illustration by Staff Sgt. Jamal Sutter) Time spent with smartphones, tablets, and computers can impact your ability to get healthy sleep. Turn off handheld devices and televisions at least two hours before bedtime. Try to avoid lying in bed and scrolling through social media and email before bedtime too. (U.S. Air Force photo illustration by Staff Sgt. Jamal Sutter)

Recommended Content:

Sleep | Human Performance Resource Center

Time spent with smartphones, tablets, and computers can impact your ability to get healthy sleep. The primary culprit is exposure to blue light that’s emitted from all electronic devices. Using them at night can disrupt your natural circadian rhythm and suppress the secretion of melatonin, a powerful sleep hormone. When your eyes are exposed to artificial light, you might feel more awake when you should be getting ready to wind down. Try these tips to minimize the impact of blue light:

  • Set a “Two-hour” rule. Turn off handheld devices and televisions at least two hours before bedtime. And dim the lights at home. Try to avoid lying in bed and scrolling social media and email before bedtime too. If you happen to read something stress-inducing or upsetting, your day might end on a negative note. Try reading a book, journaling, or reflecting on something you feel grateful for instead.
  • Block the blue. If you can’t avoid electronic devices before bed, some tools can help offset blue-light exposure. Many mobile devices come equipped with blue-light reducing functions already installed. You also can purchase blue-light blocking glasses with amber lenses. Or download software that adjusts the light on your screen, depending on the time of day and your location.
  • Use light wisely. Not all light exposure is bad. Head outside into real sunlight, especially when it’s early, so you can sleep better at night. Leverage blue-light exposure appropriately during the day, if possible. It can boost your energy and readiness, increase alertness, and enhance cognitive function and mood.

Screens and devices are unavoidable. Still, they’re often an important part of daily life. Understanding their effects on sleep can help you choose how and when to make best use of technology. To learn more about blue-light exposure, visit the Defense Centers of Excellence (DCoE) web page.

Disclaimer: Re-published content may have been edited for length and clarity. Read original post.

You also may be interested in...

Showing results 1 - 15 Page 1 of 7

Avoid sitting disease

Article
2/14/2017
A DHHQ employee bikes to work. Bike or walk to work, if possible. If you don’t live close enough to bike or walk the entire commute, try walking for at least part of your travel time. For example, park further from your building. Or choose a higher level in the parking garage. (Courtesy photo)

The more time you spend sitting, the greater your risk of disease

Recommended Content:

Preventive Health | Physical Activity | Human Performance Resource Center

Essentials for workout motivation: Personalizing activities and socializing

Article
1/30/2017
People participate in a Zumba class dance – a Latin-inspired workout that helps burn calories while dancing.

Identifying why you want to work out, what your goals are and what challenges you may face can help boost your motivation to work out, experts say

Recommended Content:

Physical Activity | Sleep

Track your weight loss

Article
1/18/2017
Mobile apps and programs are becoming simpler and more intuitive to help monitor your healthy eating. Some programs are interactive as well. They also provide nutrition information for more than 45,000 food items, including brand name and restaurant foods. Entering foods and calculating their calories takes only a fraction of the time when compared to a “paper” food diary. (MHS graphic)

The first step to losing weight and gaining better health is using self-monitoring techniques to track your calories

Recommended Content:

Nutrition | Physical Activity | Human Performance Resource Center

Winter-workout tips

Article
1/12/2017
Soldiers of the Army Reserve Medical Command participate in the 2-mile run as part of the Army Physical Fitness Test. With fewer hours of sunlight in the winter months, you might be walking or running when it’s dark out — even at dusk and dawn. Wear reflective gear or a headlamp to stay visible. (U.S. Army photo by Staff Sgt. Marnie Jacobowitz)

It can be extra challenging to get outdoors and exercise in the winter

Recommended Content:

Physical Activity | Winter Safety | Human Performance Resource Center

New year, new fitness goals

Article
1/3/2017
Runners who are less fit and less motivated estimate the distance to a finish line as farther than do runners who are fit and highly motivated. (U.S. Marine Corps photo by Lance Cpl. Micha R. Pierce)

Goals that seem more in reach often feel more desirable than ones that seem further away

Recommended Content:

Physical Activity | Human Performance Resource Center

DCoE hot-topic blogs of 2016

Article
12/30/2016
Defense Centers of Excellence for Psychological Health & Traumatic Brain Injury Logo

Throughout 2016, the Defense Centers of Excellence addressed many issues related to psychological health and traumatic brain injury

Recommended Content:

Warrior Care | Traumatic Brain Injury | Mental Health Care | Sleep | Mental Wellness

Mindful eating during the holidays

Article
12/19/2016
Navy Petty Officer 1st Class Jonathan Lewis carves turkey for a holiday dinner aboard USS Coronado.

The holiday season can be a challenging time to eat sensibly

Recommended Content:

Human Performance Resource Center | Nutrition

Busting the “fat-burning zone” myth

Article
12/13/2016
Navy Lt. Cmdr. Brian Conner, assistant navigator aboard the aircraft carrier USS George Washington, works out on the ship. (U.S. Navy photo by Mass Comunication Specialist 3rd Class Kashif Basharat)

Many people assume that in order to burn fat, they must keep their heart rate within the defined range, but this can be misleading.

Recommended Content:

Human Performance Resource Center | Physical Activity

Tips to treat tendonitis

Article
11/25/2016
Nearly 90 Naval Reserve Officers Training Corps freshman midshipman candidates stretch their legs during their introduction to unit physical training at Camp Navajo, Arizona, during joint New Student Orientation.

Tendonitis is a common, chronic overuse injury

Recommended Content:

Human Performance Resource Center | Physical Activity

Compression garments: Do they work?

Article
11/17/2016
Most studies look at compression socks during running. Compression garments have been shown to help blood flow to working muscles during exercise, but that necessarily doesn’t translate to better performance. (U.S. Navy photo)

Compression garments come in a variety of sleeves, socks, shorts, and full-body suits

Recommended Content:

Physical Activity | Human Performance Resource Center

Madigan sleep service nationally recognized

Article
11/8/2016
U.S. Army Sgt. 1st Class Bobby M. Scharton, a platoon sergeant with 17th Fires Brigade, 7th Infantry Division, lies down as Christopher Taylor, a sleep technician with Madigan Army Medical Center, checks sensor connections during a sleep study at Joint Base Lewis-McChord, Wash. Sleep technicians connect 26 sensors to patients that measure eye and muscle movements, brain activity, heart rate and breathing. (U.S. Army photo)

Madigan Army Medical Center earned national recognition for the excellent care provided in its sleep service clinic

Recommended Content:

Sleep | Military Hospitals and Clinics | Quality and Safety of Health Care | Puget Sound

Mixing supplements and medications

Article
10/20/2016
Interactions between drugs and supplements can result in either an increase or decrease in the effectiveness of your medications. In other words, you could be getting too much or too little of the medications that you need, which can be dangerous to your health. (U.S. Air Force photo by Senior Airman Hailey R. Staker)

Interactions between drugs and supplements can result in either an increase or decrease in the effectiveness of your medications

Recommended Content:

Human Performance Resource Center | Integrative Wellness | TRICARE Pharmacy Program

EPOC-alypse, now

Article
10/4/2016
A Soldier does as many pushups as possible during The Black Knight Challenge at Bagram Air Field, Afghanistan.

Excess post-exercise oxygen consumption (EPOC), also known as “afterburn,” occurs after strenuous exercise as a way to bring your body back to its normal metabolic rate

Recommended Content:

Human Performance Resource Center | Physical Activity

Stop shin splints

Article
9/30/2016
U.S. Air Force Airmen run laps around the flightline at Dobbins Air Reserve Base, Georgia. Shin splints – a common injury among athletes, particularly runners – refers to pain in the leg below the knee, usually on the inside part of your shin. This pain can be caused by micro-tears at the bone tissue, possibly caused by overuse or repetitive stress. (U.S. Air Force photo by Tech Sgt. Stephen D. Schester)

Shin splints usually occur after sudden changes in exercise or physical activity

Recommended Content:

Human Performance Resource Center | Physical Activity

Can exercise relieve chronic pain?

Article
9/29/2016
Navy Petty Officer 3rd Class Tara Paradiso participates in a sunrise yoga class on the flight deck aboard the aircraft carrier USS Theodore Roosevelt. If you’re thinking of adding exercise to your pain management plan, consider the following types: aerobic, strength, and flexibility. But make sure your exercise program is specifically tailored to your needs. Some exercises might be easier or more difficult to complete depending upon the type and location of your pain. (U.S. Navy photo by Mass Communication Specialist 2nd Class Chris Liaghat)

It’s important to know the difference between chronic pain and injury-related pain

Recommended Content:

Human Performance Resource Center | Physical Activity
<< < 1 2 3 4 5  ... > >> 
Showing results 1 - 15 Page 1 of 7

DHA Address: 7700 Arlington Boulevard | Suite 5101 | Falls Church, VA | 22042-5101

Some documents are presented in Portable Document Format (PDF). A PDF reader is required for viewing. Download a PDF Reader or learn more about PDFs.