Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities

Bay Delta Office
 
Project
Summary
Status
Click for More Information Coordinated Long-Term Operation of the Central Valley Project and State Water Project Reclamation proposes to continue the operation of the Central Valley Project in coordination with th... Record of Decision signed on January 11, 2016.
Click for More Information Land Use Authorization for PG&E to Install an Aerial Electrical Transmission Line over Lateral 24.2 in Madera CEC-15-036 Reclamation will issue a 25-year land-use authorization to PG&E that would allow them to install, op... Categorical Exclusion Checklist Signed on 8.31.2016
Click for More Information Temporary Use of Central Valley Project Water - APN 021-130-001, Colusa County, CA Reclamation proposes to approve Colusa County Water District's (District) request to provide tempora... Finding of No Significant Impact released.
Click for More Information Upper Sacramento River Anadromous Fish Habitat Restoration Program Reclamation proposes to create new side channels, modify existing side channels, and place gravel an... FONSI signed Feb 10, 2016.
Click for More Information Yolo Bypass Salmonid Habitat Restoration and Fish Passage Bureau of Reclamation and California Department of Water Resources intend to prepare an environmenta... Scoping meetings will be held on March 14, 2013 in West Sacramento and Woodland.

Central California Area
 
Project
Summary
Status
Click for More Information 2011 Interim American River Division Water Service Contract Renewals for Placer County Water Agency and the City of Roseville EA Reclamation proposes to execute interim renewal contracts for Placer County Water Agency and for t... FONSI signed December 30, 2010.
Click for More Information 2013 Interim American River Division Water Service Contract Renewals for Sacramento Municipal Utility District and Sacramento County Water Agency Draft EA Reclamation proposes to execute two 26-month interim renewal contracts for Sacramento Municipal Util... FONSI signed on December 28, 2012.
Click for More Information 2015 American River Division Interim Water Service Contract Renewal for Sacramento Municipal Utility District The Bureau of Reclamation proposes to enter into a 24-month (second) Interim Renewal Contract with S... Comments on draft EA/FONSI due by COB on December 3, 2014.
Click for More Information 2015 American River Division Interim Water Service Contract Renewal for the City of Roseville The Bureau of Reclamation proposes to enter into a 24-month (third) Interim Renewal Contract with th... Comments on draft EA/FONSI due by COB on December 3, 2014.
Click for More Information 2015 American River Division Interim Water Service Contract Renewal for the Sacramento County Water Agency Bureau of Reclamation proposes to enter into a 24-month (second) Interim Renewal Contract with Sacra... Comments on draft EA due by COB on December 3, 2014.
Click for More Information 2016-2018 American River Division Interim Water Service Contract Renewal for the Placer County Water Agenc The Proposed Action is to enter into a 24-month IRC with the American River Division contractor, PCW... draft EA available for public review
Click for More Information 2017 American River Division Interim Water Service Contract Renewal for the City of Roseville Reclamation proposes to enter into a 24-month interim renewal contract (IRC) with the City of Rosevi... Environmental Assessment available for public review.
Click for More Information 2017 American River Division Interim Water Service Contract Renewal for the Sacramento County Water Agency Reclamation proposes to enter into a 24-month interim renewal contract (IRC) with the Sacramento Cou... Environmental Assessment available for public review.
Click for More Information 2017 American River Division Interim Water Service Contract Renewal for the Sacramento Municipal Utility District Reclamation proposes to enter into a 24-month interim renewal contract (IRC) with the Sacramento Mun... Environmental Assessment available for public review.
Click for More Information American River Hatchery – New Hatchery Building Reclamation proposes to approve the construction by California Department of Fish and Game of a new ... FONSI signed and final EA completed on October 1, 2012
Click for More Information Auburn Recreation District Bike Park Project Auburn, CA Reclamation proposes to approve the California Department of Parks and Recreation's project which wo...
Click for More Information Award of WaterSMART Grant for Tracy Lake Groundwater Recharge Project North San Joaquin Water Conservation District Reclamation proposes to provide funding, under a WaterSMART grant, to the North San Joaquin Water Co... FONSI signed and Final EA completed on June 9, 2014.
Click for More Information Camp Berryessa EA Reclamation would issue a lease to Napa County Regional Park and Open Space District to construct an... FONSI signed March 15, 2011.
Click for More Information Camp Nine Whitewater Events Reclamation proposes to issue Special Event Permits (SEP), as water level conditions allow, for an i... FONSI signed on November 30, 2016.
Click for More Information Categorical Exclusion Checklists for 2014 for the Central California Area Office Attached are complete Categorical Exclusion Checklists (CECs) for 2014 for our Central California Ar...
Click for More Information City of American Canyon Water and Energy Efficiency Grant 2016 Reclamation’s proposed action is to award the City of American Canyon with $297,895, to complete the... Developing an environmental assessment.
Click for More Information City of Roseville and Placer County Water Agency Interim Renewal Water Service Contracts 2013 Reclamation proposes to approve two separate 24-month interim renewal water service contracts with t... Signed FONSI and EA available to the public on March 4, 2013.
Click for More Information City of Roseville Warren Act Contract EA/IS Purpose is to convey up to 30,000 acre-feet of non-CVP Placer County Water Agency (PCWA) water to th... Final EA/IS completed and FONSI signed on September 7, 2006.
Click for More Information City of Sacramento Water Meter Retrofits and Expansion of the River Friendly Landscaping Program Reclamation proposes to provide Bay-Delta Restoration Program: CalFed Water Use Efficiency Grant fun... FONSI signed November 24, 2015.
Click for More Information Cool Cave Quarry Lease Renewal The U.S. Bureau of Reclamation (Central CA Area Office) proposes to extend its 10-year lease with Te...
Click for More Information East Bay Municipal Utility District WaterSMART Grant - Water and Energy Efficiency Lawn Conversion Rebate Program EA The Bureau of Reclamation has awarded a WaterSMART Grant to East Bay Mud Municipal Utility District ... FONSI signed and EA completed on February 1, 2012.
Click for More Information El Dorado County Water Agency Proposed Water Service Contract EIS/EIR The proposed project consists of a water supply contract for the El Dorado County Water Agency under... Comment period extended to December 31, 2009.
Click for More Information El Dorado Irrigation District Long-Term Warren Act Contract EA Reclamation proposes to enter into a Long-term Warren Act Contract with the El Dorado Irrigation Dis... Finding of No Significant Impact and Environmental Assessment released.
Click for More Information El Dorado Irrigation District Warren Act Contract Environmental Assessment - Project 184 The Bureau of Reclamation proposes to enter into a long-term (40-year) Warren Act contract with the ... Barriers to completing Endangered Species Act compliance for this action are being addressed through discussions with NMFS.
Click for More Information El Dorado Irrigation District's Pump Station Temperature Control Device Environmental Assessment Reclamation and EID plan to install a TCD on EID's existing water supply intake in Folsom Reservoir ...
Click for More Information Five-Year Temporary Warren Act Contract between the United States and the El Dorado Irrigation District Environmental Assessment Reclamation proposes to enter into this Warren Act contract with EID to allow for the diversion of 8... 4.
Click for More Information Folsom Dam Road Access Restriction EIS The Folsom Dam Road was closed indefinitely for security reasons on February 28, 2003 to preserve an... PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov
Click for More Information Folsom Dam Safety and Flood Damage Reduction EIS/EIR*************************************** Folsom Dam Safety and Flood Damage Reduction Supplemental Environmental assessment/Initial Study************* Folsom Dam Safety and Flood Damage Reduction Project – Right Bank Stabilization FONSI 1. Reclamation seeks to improve public safety downstream of Folsom Dam by modifying the dam and its ... FONSI signed on April 14, 2008 and Final EA available April 15, 2008
Click for More Information Folsom Lake State Recreation Area General Plan/Resource Management Plan EIS/EIR Purpose is to guide long-term management of Folsom Lake State Recreation Area. Major issues are imp... Record of Decision signed on October 27, 2015.
Click for More Information Geotechnical and Geophysical Investigations for the Solano Project Terminal Reservoir Reclamation proposes to perform geotechnical and geophysical investigations at the Terminal Dam Faci... FONSI signed May 4, 2012.
Click for More Information Green Valley Road Widening Project City of Folsom The City of Folsom (City), in cooperation with the California Department of Transportation (Caltrans... FONSI signed in October 18, 2016.
Click for More Information Interim Recreation Services at Lake Berryessa Reclamation proposes to award interim concession contracts for the vacant concession areas at Lake B... The EA will be availabe for public review from April 15, 2013 to April 26, 2013.
Click for More Information Interim Renewal Warren Act Contract Between the United States and Sacramento Municipal Utility District Reclamation proposes to execute two 26-month interim renewal Warren Act (WA) contract with Sacrament... FONSI signed on December 28, 2012.
Click for More Information Lake Berryessa Long-Term Concession Development Plans Environmental Assessment Reclamation is developing conceptual plans and the associated NEPA documentation for the implementat... at the Winters Public Safety Facility (Training Room), 700 Main Street, Winters, CA 95694.
Click for More Information Lake Natoma Waterfront Trail Project EA The City of Folsom is proposing to enhance the existing trails and environmental conditions along th... FONSI signed on December 22, 2014.
Click for More Information Mormon Island Auxiliary Dam Modification, Folsom Dam Safety of Dams EIS/EIR The purpose of the Proposed Action is to reduce the seismic and static risk of failure of Mormon Isl... Record of decision signed June 25, 2010.
Click for More Information Napa Berryessa Resort Improvement District – Water and Wastewater Treatment Upgrades and Expansion Reclamation proposes to grant the Napa Berryessa Resort Improvement District (District) a land-use a... FONSI signed Feburary 21, 2013
Click for More Information New Melones Lake Concession Development Reclamation proposes to award a new concession agreement for improvement, development, and managemen... The FONSI was signed on August 28, 2013.
Click for More Information Nimbus Dam Radial Gates Maintenance Project Reclamation proposes maintenance of the radial gates at the Nimbus Dam on the American River in Sacr... FONSI signed on June 15, 2015.
Click for More Information Nimbus Hatchery Fish Passage Project EIS/EIR The purpose of the Project is to create and maintain a reliable system for collecting adult fish to ... Record of Decision signed April 5, 2013.
Click for More Information North Fork Trail Project EA Placer County is proposing to construct a multiple-use trail with parking and staging facilities alo... Reclamation will issue a Supplemental EA by July 2013.
Click for More Information Oak Shores Trail Construction at Lake Berryessa EA Reclamation, in cooperation with Berryessa Trails and Conservation, will construct a 3.6 mile hiking... FONSI signed on March 29, 2011.
Click for More Information Rehabilitation of North End Trail at Lake Berryessa EA Reclamation will rehabilitate the north end trail at Lake Berryessa, in partnership with Berryessa T... FONSI signed on March 29, 2011.
Click for More Information Release of Oakdale I.D. and South San Joaquin I.D. Water from New Melones Reservoir Reclamation proposes to release Oakdale Irrigation District and South San Joaquin Irrigation Distric... The Environmental Assessment is available for public review from April 3, 2013 through April 7, 2013.
Click for More Information Sacramento Municipal Utility District Five-Year Temporary Warren Act Contract The Proposed Action evaluated in this document is a five-year extension of an existing contract unti... Draft EA available for public comment from February 17, 2015 to COB February 27, 2015.
Click for More Information Sacramento Suburban Water District 2014 - Water Use Efficiency Grants The Bureau of Reclamation has awarded two CALFED Water Use Efficiency Grants and one WaterSMART Wate... FONSI signed and EA completed on January 6, 2015.
Click for More Information Sacramento Suburban Water District Warren Act Contract for 2011 EA Reclamation will enter into a temporary one-year Warren Act contract with Sacramento Suburban Water ... FONSI signed on March 31, 2011.
Click for More Information Safety of Dams Modifications to Dike 1 Environmental Assessment Reclamation's Safety of Dams program has proposed modifications to Folsom Reservoir’s Dike 1 in the ... FONSI signed and EA completed on December 24, 2014.
Click for More Information Stanislaus Afterbay Dam Removal Draft EA The proposed action is to demolish and remove the Afterbay Dam in a controlled manner that is protec... FONSI signed and final EA completed on February 9, 2012.
Click for More Information Summary of Recent Categorical Exclusion Checklists for Central California Area Office 2008 thru April 2009 Attached in the Documents section are the titles of Categorcal Exclusion Checklists for the Central ...
Click for More Information Sweeney/McCune Creek Outflow Recovery and Automation Project This Environmental Assessment/Initial Study has been prepared to examine the potential direct, indir... FONSI signed and EA completed on February 19, 2016. EA/IS was available for public review December 23, 2015 through January 22, 2016.
Click for More Information Temporary Warren Act Contract Between the United States and Placer County Water Agency Reclamation proposes to enter a Five-Year Temporary Warren Act Contract with Placer County Water Age... The FONSI was signed on April 2, 2013.
Click for More Information Temporary Warren Act Contract between the United States and the East Bay Municipal Utility District Reclamation is proposing a one-year temporary Warren Act contract (WAC) with the East Bay Municipal...
Click for More Information Warren Act Contract For Storage And Conveyance of Non-CVP Water From Foresthill Public Utility District to Santa Clara Valley Water District in 2015 Reclamation proposes to enter into a temporary one-year Warren Act (WA) contract for storage and con... Draft EA available for public review starting April 22, 2015 with comments due by COB on April 29, 2015.

Klamath Basin Area
 
Project
Summary
Status
Click for More Information C Canal Flume Replacement Reclamation proposes to: 1) authorize the Klamath Irrigation District (KID) to replace the existing ... Finding of No Significant Impact signed on 12/15/2015
Click for More Information Categorical Exclusion Checklists for KBAO for 2015 Attached are completed Categorical Exclusion Checklists (CECs) for 2015 for our Klamath Basin Area O...
Click for More Information Categorical Exclusion Checklists for Klamath Basin Office for 2016 Attached are completed Categorical Exclusion Checklists (CECs) for 2016 for our Klamath Basin Area O... None
Click for More Information Cottonwood Creek Crossing Upgrade Project Final EA/FONSI The Bureau of Reclamation proposes to provide funding to the Northern California Resource Center to ... Final FONSI signed October 2011
Click for More Information Final FONSI/EA, Enhancement of Overwinter Rearing Habitat in McGarvey Creek Reclamation proposes to provide funding to the Yurok Tribal Fisheries Program (YTFP) to implement th... Final FONSI/EA signed June 14, 2011
Click for More Information Five-Year Contracts for Conveyance of Non-Project Water within Klamath Project Irrigation Facilities – Contract Years 2015 – 2019 Reclamation proposes to enter into contracts with the Klamath Irrigation District, Tulelake Irrigati... Comments due May 28, 2015.
Click for More Information Horsefly Irrigation District WaterSMART Grant: Dairy and Yonna Canals Piping Project Under the Proposed Action Alternative, Reclamation would provide $185,800 of WaterSMART Grant fundin... EA completed and FONSI signed on November 10, 2016.
Click for More Information Installation of Stream-width PIT Tag Interrogation Systems in McGarvey Creek, Lower Klamath River Sub-Basin EA Reclamation proposes to provide funding to the Yurok Tribal Fisheries Program (YTFP) to install stre... FONSI signed and final EA completed on February 9, 2011.
Click for More Information Klamath Irrigation District C-Drop Hydroelectric Project Final EA and FONSI The Bureau of Reclamation proposes to grant a LOPP to Klamath Irrigation District (KID) for developm... Final FONSI and EA signed October 10, 2011.
Click for More Information Klamath Project Internal Water Transfers Reclamation proposes to approve Klamath Project water transfers between contractors for lands within... FONSI released.
Click for More Information Klamath Tributary Coho Rearing Habitat Enhancement Project Klamath Basin Restoration Program Grant #R10AP20080 Salmon River Restoration Council Reclamation proposes to provide the Klamath Basin Restoration Program grant funding to the Salmon Ri... FONSI signed on November 20, 2012.
Click for More Information Langell Valley Irrigation District Tree Removal Project The Bureau of Reclamation is proposing to approve the removal of mature trees on approximately 7.47 ... FONSI signed on February 9, 2016.
Click for More Information Lower French Creek Off-Channel Habitat Development Project The Bureau of Reclamation would fund the Lower French Creek Off-Channel Habitat Development Project ... EA completed and FONSI signed on October 7, 2016.
Click for More Information Lower Klamath River Sub-Basin Upslope Sedimentation Prevention Project EA Reclamation proposes to provide funding to the Yurok Tribal Watershed Restoration Program as a cost ... FONSI signed and final EA completed on February 9, 2011.
Click for More Information On-Project Plan for the Klamath Reclamation Project The environmental documentation will evaluate the proposed On-Project Plan as a solution for alignin... Comments on NOI due July 15, 2014.
Click for More Information Shasta River Water Association WaterSMART Grant: Irrigation Water Measurement and Billing Accounting System The proposed project includes upgrades to the irrigation delivery infrastructure, installation of ne... Environmental Assessment and Finding of No Significant Impact available.

Lahontan Basin Area
 
Project
Summary
Status
Click for More Information Ash Canyon Acquisition Project The proposed action is to allow the use of federal grant funding by the Nevada Land Trust (NLT) for ... Comments are due on May 22, 2015. FONSI signed on July 8, 2015.
Click for More Information Authorization of Naval Air Station Fallon Stormwater Discharge Reclamation proposes to authorize the continued discharge and conveyance of stormwater from Naval Ai... FONSI signed on December 11, 2015.
Click for More Information Battle Mountain Community Pasture Barn Demolition EA Reclamation is proposing to demolish and remove the Battle Mountain Community Pasture barn. The barn... FONSI signed July 5, 2011.
Click for More Information Boca Dam Safety of Dams Modification Project The Bureau of Reclamation proposes to ......
Click for More Information Carson Lake and Pasture Transfer and Management EA Reclamation proposes to convey Federal lands known as the Carson Lake and Pasture (CLP) to the State... No change in status.
Click for More Information Carson River Diversion Dam and Derby Diversion Dam Tender Houses Demolition and Removal Project Reclamation is proposing to hire a contractor to demolish, remove, and safely dispose of the Carson ... Comments due March 27, 2015
Click for More Information Carson River Floodplain Rehabilitation and Habitat Restoration Project Reclamation proposes to allow the Dayton Valley Conservation District to use National Fish and Wildl... Final EA prepared and FONSI signed on November 18, 2015.
Click for More Information Categorical Exclusion Checklists for Calendar Year 2011 Attached are the recent Categorical Exclusion Checklists for the Lahontan Basin Area Office. A CEC e...
Click for More Information Categorical Exclusion Checklists for Lahontan Basin Area Office for Calendar Year 2012 Attached are the recent Categorical Exclusion Checklists for the Lahontan Basin Area Office. A CEC e...
Click for More Information Categorical Exclusion Checklists for Lahontan Basin Area Office for Calendar Year 2013 Attached are the Categorical Exclusion Checklists for the Lahontan Basin Area Office for 2013. A CEC...
Click for More Information Categorical Exclusion Checklists for LBAO for 2014 Attached are the Categorical Exclusion Checklists for the Lahontan Basin Area Office for 2014. A CEC...
Click for More Information Categorical Exclusion Checklists for LBAO for 2015 Attached are the Categorical Exclusion Checklists for the Lahontan Basin Area Office for 2015. A CEC...
Click for More Information Humboldt River Water Conservation Project Reclamation proposes to approve and fund Pershing County Water Conservation District (PCWCD) to inst... FONSI signed on February 13, 2013.
Click for More Information Independence Lake Forest Thinning and Hazardous Fuels Reduction EA Reclamation proposes to approve the Nature Conservancy to utilize Desert Terminal Lake grant funding... FONSI signed September 5, 2012.
Click for More Information Independence Lake Spillway Fish Barrier EA Reclamation proposes to construct the Independence Lake Spillway Fish Barrier. Reclamation has been... FONSI signed and final EA completed on September 1, 2011.
Click for More Information Installation of SatLink2 on Flow Measurement Devices in Truckee-Carson Irrigation District TID proposes to install 50 SatLink2 devices in the Cason Division that allow remote monitoring of i... FONSI signed on April 14, 2016.
Click for More Information Lahontan State Recreation Area Aquatic Invasive Species Wash Station Reclamation proposes to approve Nevada State Parks (State Parks) plans to construct a permanent pull... Comments were due March 1, 2013. FONSI signed on March 7, 2013.
Click for More Information Lahontan Substation Rebuild and Upgrade Project Reclamation proposes to issue a license for NV Energy’s SF-299 Application for the construction of a... FONSI signed August 1, 2014.
Click for More Information Lower Truckee River Restoration Projects at Tracy Power Plant, West McCarran Ranch, and Upper Mustang Ranch EA The Bureau of Reclamation (Reclamation) and The Nature Conservancy (TNC) utilizing Reclamation Des... FONSI signed on August 24, 2012.
Click for More Information Newlands Project Resource Management Plan Reclamation prepared an EIS to evaluate options for management of natural resources on lands within ... ****************************** Record of Decision signed on October 27, 2015.
Click for More Information Patua Geothermal Project Phase II EA Gradient Resources Inc., (GRI) has obtained the rights to federal geothermal leases which comprise p... The EA is available at BLM's website at:https://www.blm.gov/epl-front-office/eplanning/projectSummary.do?methodName=renderDefaultProjectSummary&projectId=17952
Click for More Information Pyramid Lake Watercraft Inspection Station The Proposed Action is to allow the Pyramid Lake Reservation for the Pyramid Lake Paiute Tribe's Pyr... FONSI signed on June 10, 2016.
Click for More Information Salt Wells Geothermal Energy Projects EIS The Bureau of Land Management (BLM), Carson City District-received proposals from Ormat Technologies... The Final EIS and BLM's RODs can be viewed at http://www.blm.gov/nv/st/en/fo/carson_city_field/blm_information/nepa/salt_wells_energy.html.
Click for More Information Stampede Dam Safety of Dams Modification Project EA Reclamation proposes to construct safety modifications to Stampede Dam near Truckee, California. Re... FONSI signed and Final EA completed on May 11, 2012.
Click for More Information Truckee Canal Extraordinary Operation and Maintenance Environmental Impact Statement The purpose is to improve public safety by reducing the risk of a Canal breach. Reclamation needs t... Scoping report completed in May 2016.
Click for More Information Truckee River Below Derby Dam Riparian Ecosystem Restoration The project to be analyzed is augmenting the fishway at Derby Dam, Truckee River, east of Reno, Neva... EA available January 2009
Click for More Information Truckee River Restoration Environmental Assessment Reclamation is co-lead with BLM for this NEPS project for the restoration of three sites on the lowe... Public Meetings held February 2007. Draft EA out January 2008. Final EA/signed FONSI March 2008.
Click for More Information Truckee-Carson Irrigation District Lewis Wasteway Replacement and Low Head Hydroelectric Project TCID is proposing to replace the Lewis Wasteway structure, which suffered a structure failure in Jun... FONSI signed and EA completed on July 9, 2014.

Northern California Area
 
Project
Summary
Status
Click for More Information 2013 Lower Klamath River Late Summer Flow Augmentation from Lewiston Dam Reclamation proposes to augment lower Klamath River flows to reduce the likelihood, and potentially ... FONSI signed and final EA completed on August 6, 2013.
Click for More Information 2015 Lower Klamath River Late-Summer Flow Augmentation from Lewiston Dam Continued dry hydrologic conditions and recent discovery of presence of Ich, the fish disease though... FONSI Signed Aug 20, 2015. Draft EA for public comment July 31, 2015 - August 7, 2015.
Click for More Information 2016 Lower Klamath River Late-Summer Flow Augmentation from Lewiston Dam Reclamation has proposed the possible release of Trinity Reservoir-stored water to supplement flows ... FONSI signed on August 24, 2016.
Click for More Information 2016 to 2020 Water Transfers by the Glenn-Colusa Irrigation District to Contiguous Parcels This Environmental Assessment (EA) has been prepared to examine the potential impacts of consenting ... FONSI signed on April 14, 2016.
Click for More Information Accelerated Water Transfer and Exchange Program for Sacramento Valley Central Valley Project Contractors – Contract Years 2016- 2020 Reclamation proposes to implement an accelerated process for annual water transfers and/or exchanges... 17, 2016.
Click for More Information Assignment of Sacramento River Settlement Contract No. 14-06-200-1364Y-R-1 At the request of the new property owners, Reclamation will assign the interests in Sacramento River... Categorical Exclusion Checklist signed on July 8, 2016
Click for More Information Assignment of Sacramento River Settlement Contract No. 14-06-200-4178A-R-1 NCAO-CEC-17 -05 At the request of the new property owners, Reclamation will assign the interests in Sacramento River... Categorical Exclusion Checklist signed on November 21, 2016
Click for More Information Buckhorn Dam/Grass Valley Creek Toe Drain and Channel Rehabilitation Project EA The Project plans excavation of the Buckhorn dam outlet channel so that surface water elevations wil... Threatened Coho seen in newly opened habitat in November 2012.
Click for More Information Categorical Exclusion Checklists for 2012 for Northern California Area Office Attached are complete Categorical Exclusion Checklists (CECs) for 2012 for our Northern California A...
Click for More Information Categorical Exclusion Checklists for 2013 for Northern California Area Office Attached are complete Categorical Exclusion Checklists (CECs) for 2013 for our Northern California A...
Click for More Information Categorical Exclusion Checklists for 2014 Attached are complete Categorical Exclusion Checklists (CECs) for 2014 for our Northern California A...
Click for More Information Categorical Exclusion Checklists for NCA0 in 2015 Attached are complete Categorical Exclusion Checklists (CECs) for 2015 for our Northern California A...
Click for More Information Categorical Exclusion Checklists for NCA0 in 2016 Attached are complete Categorical Exclusion Checklists (CECs) for 2016 for our Northern California A...
Click for More Information City of Orland - Pilot Flying J Travel Center - Abandonment and Realignment of Irrigation Features - Orland Project, CA The City of Orland is requesting a construction permit from Reclamation to redirect a segment of an ... Categorical Exclusion Checklist signed on April 4, 2016.
Click for More Information Clear Creek Salmonid Spawning Gravel Augmentation Program Reclamation will place approximately 10,000 tons of gravel into the creek to help improve spawning h... CEC signed on July 16, 2012.
Click for More Information Coleman Barrier Weir Site Modifications The U.S. Department of the Interior, Fish and Wildlife Service (Service) and the Bureau of Reclamati... EA/FONSI available September 30, 2011
Click for More Information Colusa County Irrigation District SCADA Installation Project The Bureau of Reclamation is proposing to provide a WaterSMART Water and Energy Efficiency grant to ... FONSI signed and EA completed on September 26, 2014.
Click for More Information Colusa County Water District - Discharge Facility - Tehama-Colusa Canal, Milepost 91.22R - Central Valley Project, California Proposed Action Colusa County Water District (District) is requesting permission to install, operat... CEC signed and posted.
Click for More Information Colusa County Water District - Discharge Facility - Tehama-Colusa Canal, Milepost 92.00L - Central Valley Project, California Colusa County Water District (District) is requesting permission to install, operate, and maintain a... CEC signed and posted.
Click for More Information Cortina Water District - Discharge Facility - Tehama-Colusa Canal, Milepost 90.43L - Central Valley Project, California Cortina Water District (District) is requesting permission to install, operate and maintain a new di... Categorically excluded, May 2015.
Click for More Information Cortina Water District - Discharge Facility - Tehama-Colusa Canal, Milepost 90.65R - Central Valley Project, California Cortina Water District (District) is requesting permission to install, operate and maintain a new di... CEC signed and posted.
Click for More Information Dunnigan Water District - SCADA Project Reclamation proposes to provide Dunnigan W.D. with CalFed Grant funding for the district to install ... The FONSI was signed on 9/25/2013.
Click for More Information Five-Year Warren Act Contracts for Conveyance of Groundwater in the Tehama-Colusa and Corning Canals – Contract Years 2013 through 2017 (March 1, 2013, through February 28, 2018) The Bureau of Reclamation proposes to issue 5-year Warren Act Contracts (WACs) to requesting Central... Supplemental FONSI signed and EA prepared on March 6, 2014.
Click for More Information Glen-Colusa Irrigation District 550.43 Acre Annexation The Proposed Action is annexation of four parcels, consisting of approximately 550.43 acres, into th...
Click for More Information Glenn Colusa Irrigation District and the Holthouse and Colusa County Water Districts Long-Term Transfers of Central Valley Project Water in Support of the Colusa Generating Station Environmental Assessment Reclamation proposes to approve a series of transfers to enable the County of Colusa (County) to sup... FONSI signed February 25, 2010.
Click for More Information Gray Lodge System Improvements - Conveyance of Refuge Water Supply Project East Sacramento Vallye Study Area Supplemental EA and Addendum to IS The purpose of the Proposed Action is to increase Biggs-West Gridley Water District's system conveya... FONSI signed on October 21, 2013.
Click for More Information Interim Renewal Contract Between the United States and Elk Creek Community Services District Providing for Project Water Service From the Black Butte Project Reclamation proposes to execute an interim renewal contract for up to 100 acre feet/year of Central ... Final EA being prepared.
Click for More Information Long-Term Plan to Protect Adult Salmon in the Lower Klamath River The Bureau of Reclamation has prepared a Draft Environmental Impact Statement (DEIS) for the Long Te... Reclamation anticipates completing the Final EIS mid-January and signing a Record of Decision by the end of February, 2017.
Click for More Information Long-term Renewal of CVP Contracts - Sacramento River Division EA The Sacramento River Division contains 18 water service contractors served primarily by the Tehama C... Revised Draft EA released on July 30, 2004. Final EA completed November 11, 2004. FONSI signed February 25, 2005. PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov
Click for More Information Natomas Central Mutual Water Company's R-Drain Check Structure Automation Project The Bureau of Reclamation (Reclamation) has prepared this Environmental Assessment (EA) to evaluate ... EA completed and FONSI signed on February 12, 2016.
Click for More Information Natomas Central Mutual Water Company's Sankey Road Check Structure Automation Project The Bureau of Reclamation proposes to award the Natomas Central Mutual Water Company with a CALFED B... EA completed and FONSI signed on August 28, 2015.
Click for More Information Orland Unit Water Users' Association Approval of Amendments to "Bylaws of Orland Unit Water Users' Association" Orland Project, CA The Bylaws of the Orland Unit Water Users' Association are being amended. As title holder to the Orl... The Categorical Exclusion Checklist was signed on July 8, 2016.
Click for More Information Orland-Artois Water District Discharge Facility - Tehama-Colusa Canal, Milepost 37.80 - Central Valley Project, California Orland-Artois Water District(District) is requesting permission to install, operate and maintain a n... Categorically excluded, May 2015.
Click for More Information Pacific Gas and Electric Company -21 KV Powerline Crossing along the Tehama-Colusa Canal -County Road 33, Glenn County, CA Reclamation will approve PG&E’s installation, operation and maintenance of a 21kv powerline with thr... Categorical Exclusion Checklist signed on July 13, 2016.
Click for More Information Recreational Improvements at East Park Reservoir - Orland Project Reclamation would allow development of an 18-hole disc golf course and a non-motorized aircraft land... Final Environmental Assessment and Finding of No Significant Impact released.
Click for More Information Renewal of Sacramento River Settlement Contract EIS Involves the entities and individuals asserting senior rights to divert water from the natural flow ... signed March 9, 2005; revised Natomas ROD May 5,2005. ROD for City of Redding and ACID signed July 1, 2005. PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov
Click for More Information Sacramento River Salmonid Spawning Gravel Augmentation Program at Keswick Dam 2011 CEC Reclamation would place about 5,000 tons of spawning gravel into the Sacramento River near Keswick D... CEC signed on June 1, 2011.
Click for More Information Stony Gorge Reservoir - Installation of Sanitary Vaults - Orland Project Reclamation will install three modern, pre-fabricated, dry vault restrooms at three high-traffic cam... Categorical Exclusion Checklist issued on 20 November 2015
Click for More Information Tehama County Public Works Elder Creek Levee Repair Sampling The Tehama County Public Works Department (County) has requested permission to perform investigative... Categorical Exclusion signed September 17, 2015.
Click for More Information Temporary Transfer of Central Valley Project Water from The City of Redding to Member Units of the Tehama-Colusa Canal Authority in Contract Year 2015 The Bureau of Reclamation proposes to approve a one-year transfer of up to 707 acre-feet (AF) of Cen... EA and FONSI available for public review.
Click for More Information Temporary Transfer of CVP Water from the City of Redding to the Bella Vista Water District in 2014 The Bureau of Reclamation proposes to approve a 1-year transfer of up to 1,200 acre-feet (AF) of Cen... FONSI signed and EA completed on July 8, 2014.
Click for More Information Temporary Transfer of Water from the Bella Vista Water District to Glide and Colusa County Water Districts in 2013 Reclamation proposes to approve a 1-year transfer of up to 3,000 acre-feet (AF) of Central Valley Pr... Draft FONSI and EA available for public review on August 1, 2013.
Click for More Information Temporary Transfer of Water from the City of Redding’s Sacramento River Settlement Contract to the City of Redding’s Central Valley Project Water Service Contract EA Reclamation would approve the transfer of Project Water from the Settlement Contract to the Buckeye ... FONSI signed on January 14, 2015
Click for More Information Temporary Transfer of Water from the McConnell Foundation to Kanawha and Glide Water Districts in Contract Year 2014 The Bureau of Reclamation proposes to approve a 1-year transfer of up to 5,100 acre-feet (AF) of Cen... FONSI signed and EA completed on April 9, 2014.
Click for More Information Temporary Warren Act Contracts for Conveyance of Non-Central Valley Project Water in the Tehama-Colusa and Corning Canals in 2012 EA Reclmation is proposing to enter into contracts for 1-year for the conveyance of non-CVP groundwater... FONSI signed April 6, 2012.
Click for More Information Time Extension to Use Central Valley Project Water and Base Supply by Sacramento River Settlement Contractors in Contract Year 2015 Reclamation will temporarily extend the time period for use of Contract Year 2015 Base Supply and Ce...
Click for More Information Transfer of Base Supply Water and Central Valley Project Water by Glenn-Colusa Irrigation District to the Colusa Drain Mutual Water Company Reclamation proposes to approve the transfer of up to 45,000 acre-feet of water by the Glenn-Colusa ... FONSI signed and final EA completed on January 14, 2013.
Click for More Information Transfer of Project Water from Clear Creek CSD to Orland-Artois WD, 2013 Reclamation proposes to approve a 1-year transfer of up to 5,000 acre-feet of Central Valley Project... FONSI signed and Final EA completed on July 15, 2013.
Click for More Information Trinity River Channel Rehabilitation Site: Limekiln Gulch (River Mile 99.7- 100.6) EA/IS The Trinity River Restoration Program (TRRP), including the U.S. Bureau of Reclamation and the U.S. ... Comments are due March 31, 2015.
Click for More Information Trinity River Channel Rehabilitation Sites: Bucktail (River Mile 105.3-106.25) and Lower Junction City (River Mile 79.3-79.8. The Trinity River Restoration Program (TRRP), including the U.S. Bureau of Reclamation and the U.S. ... Comments due on January 13, 2014.
Click for More Information Trinity River Channel Rehabilitation Sites: Douglas City (River Mile 93.6-94.6) and Lorenz Gulch (River Mile 89.4-90.2) The Trinity River Restoration Program (TRRP)- including the U.S. Bureau of Reclamation and the U.S. ... Revegetation of site fall & winter 2013/2014 and irrigation to continue through 2015
Click for More Information Trinity River Channel Rehabilitation Sites: Lower Steiner Flat (River Mile 91.3 to 90.2) and Upper Junction City (River Mile 79.8 to 80.4) EA/IS The Trinity River Restoration Program (TRRP)- including the U.S. Bureau of Reclamation and the U.S. ... Maintenance of plants will be ongoing for another 2 years to ensure their survival.
Click for More Information Trinity River Restoration Program Channel Rehabilitation and Sediment Management Master (Programmatic) EIR and Site Specific EA/EIR for Remaining Phase I Activities The environmental document consists of two parts: Part 1 is a Master EIR which programmatically addr... FONSI signed July 30, 2009.
Click for More Information Trinity River Restoration Program: Lewiston-Dark Gulch Rehabilitation Project: Trinity River Mile 105.4 to 111.7 EA/EIR This mechanical channel rehabilitation project is one of those originally identified in the Interior... Construction is ongoing with completion expected by December 2008.
Click for More Information Trinity River Channel Rehabilitation Site:  Bucktail (River Mile 105.45 – 107.0)   The Trinity River Restoration Program (TRRP), including the U.S. Bureau of Reclamation and the U.S. ... FONSI signed on May 12, 2016.
Click for More Information Use of Trinity Reservoir water to Supplement Flows in the Lower Klamath River in 2012 EA Reclamation proposes to use Trinity Reservoir-stored water to supplement flows in the lower Klamath ... FONSI signed and Final EA completed on August 10, 2012.
Click for More Information Voluntary Partial Assignment of Sacramento River Settlement Contract Number 14-06-200-880X-R-1 Reclamation will execute a Voluntary Partial Assignment of Sacramento River Settlement Contract (Set... Categorical Exclusion Checklist signed on November 21, 2016

Regional Office
 
Project
Summary
Status
Click for More Information 1. San Joaquin River Restoration Program (SJRRP) Water Year 2010 Interim Flows Project Environmental Assessment/ Initial Study ***************************** 2. SJRRP Water Year 2011 Interim Flows Project Supplemental Environmental Assessment ***************************** 3. SJRRP Water Year 2012 Interim Flows Project Supplemental Environmental Assessment 1. Water Year 2010 EA: Reclamation temporarily changed Friant Dam operations in Water Year (WY) 2010... FONSI signed and Final EA available on September 30, 2011.
Click for More Information 2011 CVPIA Gravel Replenishment Program Stanislaus River at River Mile 58 Reclamation proposes to add up to 5,500 cubic yards of gravel to the Lower Stanislaus River at Rive... Finding of No New Significant Impact signed August 12, 2011.
Click for More Information 2013 Water Transfers EA/FONSI Reclamation proposes to approve water transfers in 2013 that require Reclamation's approval, which i... FONSI signed and final EA completed on June 21, 2013.
Click for More Information 2015 Refuge Level 2 Water Exchange between Reclamation and San Luis and Del Puerto Water Districts The Districts propose to fund the costs associated with the delivery of groundwater supplies from tw... FONSI signed September 3, 2015.
Click for More Information 2016 Tehama-Colusa Canal Authority Water Transfers The TCCA and its Member Units may experience severe water shortages in 2016 and are soliciting willi... Draft Environmental Assessment/Initial Study available for review February 4, 2016 - March 7, 2016.
Click for More Information 5-Year Groundwater Acquisitions for South Delta CVPIA Refuges Reclamation proposes to enter into agreements with various parties SOD to acquire IL4 water supplies... Reclamation releases the FONSI for the 5-Year Groundwater Acquisitions for South of Delta Central Valley Project Improvement Act Refuges on 02/01-2016
Click for More Information 5-Year Refuge Level 2 Exchange Agreement with San Luis Water District The Bureau of Reclamation (Reclamation) has prepared an Environmental Assessment (EA) to evaluate an... EA was made available for public review on September 30, 2016 through October 14, 2016.
Click for More Information Acquisition of Up to 7,363 Acre-Feet of Water from Merced Irrigation District for the East Bear Creek Unit of the San Luis National Wildlife Refuge (2012) Reclamation proposes to enter into a temporary water service contract with the Merced Irrigation Dis... FONSI signed and EA completed on October 29, 2012.
Click for More Information Agreement for the Reimbursement of Groundwater Pumping Costs For the Gray Lodge Wildlife Area Between The United States and the State of California The Bureau of Reclamation (Reclamation) proposes entering into the “Agreement for the Reimbursement ... EA completed and FONSI signed on August 25, 2016.
Click for More Information Agreement for the Reimbursement of Pumping Costs between the United States and the State of California for Refuge Water Supplies at Wildlife Areas Reclamation proposes entering into the “Agreement for the Reimbursement of Pumping Costs for Refuge ... FONSI signed August 14, 2015
Click for More Information Anderson Cottonwood Irrigation District IRWMP Groundwater Production Element Project EA Reclamation proposes to provide financial assistance to the Anderson-Cottonwood Irrigation District ... FONSI signed November 01, 2011.
Click for More Information ARRA New Wells Project - Region 1 EA Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed July 13, 2010.
Click for More Information ARRA New Wells Project - Region 2 EA Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed July 13, 2010.
Click for More Information ARRA New Wells Project - Region 3 EA Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed July 13, 2010.
Click for More Information ARRA New Wells Project - Region 4 Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed on August 3, 2010.
Click for More Information ARRA-funded Water Recycling (Title 16) Projects FONSIs This site shows the FONSIs for water recycling projects funded by the American Recovery and Reinvest... All of these were completed by June 2010.
Click for More Information Arroyo Canal Fish Screen and Sack Dam 6 Fish Passage Project EA/IS Reclamation in cooperation with the Henry Miller Reclamation District #2131 (HMRD), proposes to repl... FONSI signed on September 4, 2013.
Click for More Information Bella Vista Water District Advanced Metering and Water Conservation Improvements Reclamation proposes to grant $199,938 to BVWD through a WaterSMART Program grant, for its Advanced ... The FONSI was signed April 18, 2016.
Click for More Information Buena Vista Water Storage District Draft Environmental Assessment 2014 WaterSMART Grant for Section One of the Northern Area Project, California This Environmental Assessment (EA) has been prepared to examine the potential direct, indirect, and... FONSI signed on September 16, 2015.
Click for More Information Buena Vista Water Storage District Water Use and Irrigation Efficiency Project Buena Vista Water Storage District (BVWSD) applied for a WaterSMART grant when Reclamation announced... The FONSI was signed on December 12, 2012.
Click for More Information Butte Water District Canal Automation Project, Draft EA/FONSI Under the Sacramento Valley Integrated Regional Water Management Plan (SVIWRMP) Grants Program, Recl... FONSI signed and final EA completed on August 18, 2011.
Click for More Information Categorical Exclusion Checklists for Calendar Year 2012 Attached are complete Categorical Exclusion Checklists (CECs) for 2012 for our Regional Office in Sa...
Click for More Information Categorical Exclusion Checklists for Calendar Year 2015 Attached are complete Categorical Exclusion Checklists (CECs) for 2015 for our Regional Office in Sa...
Click for More Information Categorical Exclusion Checklists for Calendar Year 2016 Attached are complete Categorical Exclusion Checklists (CECs) for 2016 for our Regional Office in Sa...
Click for More Information Cawelo Water District and North Kern Water Storage District Calloway Canal Lining Project – Reaches C1, C2, and D Under the proposed action, Reclamation would award Cawelo Water District with a $300,000 CALFED Wate... FONSI signed and final EA completed on March 24, 2015.
Click for More Information Cawelo Water District Calloway Canal Lining Project Reclamation will provide a CALFED Bay-Delta Program grant to the Cawelo Water District to line the C... FONSI signed April 12, 2013.
Click for More Information Cawelo Water District Calloway Canal Lining Project Reach B Reclamation proposes to award CWD with a $500,000 CALFED Water Use Efficiency Grant to assist in fun... FONSI signed and final EA completed on July 28, 2014.
Click for More Information Central California Irrigation District Orestimba Creek Groundwater Recharge Project The Proposed Project will construct a 20 acre recharge facility near Orestimba Creek and the Delta-M...
Click for More Information Central California Irrigation District Amaral Systems Improvement Project The Bureau of Reclamation (Reclamation) proposes to award Central California Irrigation District wit... Comments due by October 17, 2014.
Click for More Information Central California Irrigation District East Ditch and Poso Canal Reservoirs Project Reclamation proposes to award Central California Irrigation District (CCID) with a grant to fund a p... FONSI signed and EA completed on October 6, 2014.
Click for More Information Central California Irrigation District Molasses Ditch Lining Project The Bureau of Reclamation has proposed awarding WaterSMART Water and Energy Efficiency Grant funding... Comments will be received through close of business, November 22, 2016.
Click for More Information Central Dublin Recycled Water Distribution and Retrofit Project EA Reclamation proposes to provide Federal funds to the share the cost with the Dublin San Ramon Servic... FONSI signed and Final EA completed on May 11, 2012.
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects for Fiscal Year 2013 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP) is to enhance, protect, ... There were two EAs and two CECs for projects funded in fiscal year 2013.
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects for Fiscal Year 2014 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP) is to enhance, protect, ... Four projects were funded in Fiscal Year 2014.(3 EAs and 1 CEC).
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects for Fiscal Year 2015 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP) is to enhance, protect, ... FONSI signed for Protection of Alkali Scrub Habitat on December 12, 2015. FONSI signed for Dos Rios Ranch Riparian Brush Rabbit Recovery Project on June 22, 2016. CEC signed for Environmental DNA Assays for Vernal Pool branchiopods and biodiversity assessment on January 28, 2016. CEC signed for Evaluation of Integrating adaptation and phenotypic plasticity into models of habitat connectivity for the Ciervo-Panache giant kangaroo rat on May 20, 2016.
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects for Fiscal Year 2016 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP) is to enhance, protect, ... Comments due on November 23, 2016.
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects from FY 2011 through FY 2012 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP) is to enhance, protect, ... Previous years' projects have their own sites.
Click for More Information Colusa Indian Community Council Compton Diversion Fish Screen Project Reclamation proposes to provide cost-share funding to Colusa Indian Community Council (CICC) through... Comments due September 11, 2014.
Click for More Information Contra Costa Resource Conservation District Recovery Actions for California Red-legged Frog and California Tiger Salamander Reclamation would provide $186,167 from the Central Valley Project Improvement Act Habitat Restorati...
Click for More Information Contracts between the United States and Conaway Preservation Group, LLC and, the United States and the Woodland-Davis Clean Water Agency Reclamation proposes to execute an amendatory Sacramento River Settlement Contract between the Unite... FONSI signed and final EA completed October 2, 2013.
Click for More Information Delivery and Use of Unreleased San Joaquin River Restoration Flows (Water Contract Years 2016-2025) Reclamation proposed to sell and exchange Unreleased Restoration Flows for the purpose supporting re... FONSI on Conveyance of Unreleased Restoration Flow Exchange Water in Firebaugh Wasteway signed on November 21, 2016.
Click for More Information Delta Cross Channel Temporary Closure Multi-Year Study Reclamation is proposing to close the Delta Cross Channel (DCC) gates for up to 10 days during the f... FONSI signed on September 28, 2012.
Click for More Information Delta Diablo Proposed Title XVI Program - Recycled Water System Expansion Project Reclamation proposes to partially fund the Delta Diablo Proposed Title XVI Program - Recycled Water ... FONSI signed and Revised EA prepared on February 4, 2016.
Click for More Information Eastside Bypass Conveyance Project Reclamation proposes to restore flow capacity to the low-flow channel within the Eastside Bypass, wh... EA was completed and FONSI signed on February 1, 2016. Draft EA/FONSI made available for public review from October 23 to November 23, 2015.
Click for More Information Environmental Assessment Central California Irrigation District CALFED Funding Grant for the Oil Station System Improvement Project 15-18-MP Reclamation would award a $418,500 CALFED Grant for the construction of the Oil Station Improvement ... The FONSI was signed and the Environmental Assessment completed on 11/23/2015
Click for More Information Exchange of Refuge Level 2 Water for Panoche Water District Groundwater - 2014 Panoche Water District is proposing to fund the costs of pumping and delivery of groundwater supplie... Comments due by COB on November 5, 2014.
Click for More Information Exchange of Refuge Level 2 Water for Panoche Water District Groundwater - 2015 Panoche Water District is proposing to fund the costs of pumping and delivery of groundwater supplie... Draft EA anticipated to be available for public review in July 2015.
Click for More Information Execution of Warren Act Contracts for Storage and Conveyance of Non-CVP Water from Placer County Water Agency to Westlands Water District Reclamation proposes to enter into a one-year Warren Act contract, for storage and conveyance of up ... FONSI signed on May 30, 2013.
Click for More Information Feather Water District North and South Diversions Fish Screen Project Reclamation proposes to provide cost-share funding to SSWD through the Anadromous Fish Screen Progra... Comments due April 30, 2014.
Click for More Information Firebaugh Canal Water District (FCWD) 1st Canal WaterSMART Grant Project EA Reclamation would provide grant funding for the concrete lining of 2.6 miles of canal to reduce seep... FONSI signed and EA completed on September 29, 2011.
Click for More Information Firebaugh Canal Water District 1st Lift Canal Lining Project - Phase II and Check 2 Modernization Project Reclamation is providing grant funding to Firebaugh Canal Water District (FCWD) through the Bay-Delt... FONSI signed and EA completed on October 31, 2013
Click for More Information Firebaugh Canal Water District 1st Lift Canal Lining Project Phase 3 - Shaw Avenue to Check 1 at Highway 33 The 1st Lift Canal Lining Project Phase 3 – Shaw Avenue to Check 1 at Highway 33 entails Reclamation... The EA was completed and FONSI was signed on December 3, 2015.
Click for More Information Firebaugh Canal Water District 2nd Canal Lining Project Reclamation is providing a Bay-Delta Restoration Program: Agricultural Water Conservation and Effici... The EA and FONSI was available for public review from September 5, 2012 through September 19, 2012.
Click for More Information Firebaugh Canal Water District 2nd Lift Canal Modernization and Lining Project Phase 4 - Washoe to Douglas Avenue The 2nd Lift Canal Modernization and Lining Project Phase 4 – Washoe to Douglas Avenue entails Recla... FONSI signed and EA completed on January 13, 2015.
Click for More Information Fresno Irrigation District’s Installation of a Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal for Transfer and/or Exchange Reclamation proposes to do the following: (1) enter into an exchange agreement with Fresno Irrigatio... FONSI signed on March 21, 2014.
Click for More Information Friant-Kern Canal Capacity Restoration Draft EA/FONSI Bureau of Reclamation proposes to restore the capacity of the Friant-Kern Canal (FKC) from the curre... Waiting to complete cultural resources and endangered species compliance.
Click for More Information Garden Highway Mutual Water Company 2015 System Modernization and Real Time Monitoring and Control Reclamation proposes to provide CALFED Water Use Efficiency Grant funds to the Garden Highway Mutual... FONSI signed on June 24, 2016.
Click for More Information Golden Gate Salmon Association Project B.11 – Sacramento River Stranding Reclamation wants to stabilize releases from Keswick Dam during October to reduce salmon spawning an... Comments are due September 27, 2013.
Click for More Information Grassland Incremental Level 4 Groundwater Acquisition Pilot Project - Water Years 2008-2010 Environmental Assessment Under the proposed action, Reclamation would purchase up to approximately 10,000 acre-feet of water ... FONSI signed/final EA prepared on August 15, 2008.
Click for More Information Grassland Incremental Level 4 Groundwater Acquisition Pilot Project - Water Years 2012-2013 Environmental Assessment Under the proposed action, Reclamation would purchase up to approximately 10,000 acre-feet of water ... Supplemental FONSI signed on June 19, 2012.
Click for More Information Grassland Water District Incremental Level 4 Groundwater Acquisition Project In lieu of the availability of other water supplies for wildlife areas this fall, the Bureau of Recl... FONSI signed and final EA completed on September 18, 2014.
Click for More Information Gray Lodge Wildlife Area 2014-15 Agreement for the Reimbursement of Deep Well Pumping Costs*********** Gray Lodge Wildlife Area 2012-2014 Agreement for the Reimbursement of Deep Well Pumping Costs on the between the United States and the State of California ***************************** Gray Lodge Wildlife Area 2009 Agreement for the Reimbursement of Deep Well Pumping Costs on the between the United States and the State of California EA Reclamation will amend the performance period for reimbursement of pumping costs at Gray Lodge Wildl... Final EA completed and FONSI signed May 20, 2009.
Click for More Information Henry Miller Reclamation District No. 2131 Island Canal System Modernization Project Reclamation is providing grant funding to Henry Miller Reclamation District No. 2131 (HMRD) through ... FONSI signed and EA completed on January 14, 2014.
Click for More Information Interim San Joaquin Salmon Conservation and Research Facility Operations and Maintenance Funding Reclamation proposes to fund operations and maintenance of the Interim San Joaquin Salmon Conservati... FONSI signed and final EA completed on September 25, 2013.
Click for More Information Ivanhoe Irrigation District Control System Project – 68 Main WaterSMART Water and Energy Efficiency Grant Reclamation proposes to award Ivanhoe Irrigation District with a $300,000 WaterSMART Water and Energ... FONSI signed on June 1, 2015.
Click for More Information Ivanhoe Irrigation District WaterSMART Grant Reclamation proposes to provide WaterSMART program grant funds to the Ivanhoe Irrigation District (D... The FONSI was signed on November 29, 2012.
Click for More Information Joint Operations Center Relocation Project EIS/EIR The Bureau of Reclamation (Reclamation) and the California Department of Water Resources propose to ... These investigation efforts have delayed the publication of the final EIS/EIR.
Click for More Information Kaweah Delta Water Conservation District Packwood Creek Control Structures and Oakes Basin Improvements Project Reclamation proposes to provide grant funds Kaweah Delta Water Conservation District to support the ... FONSI signed and final EA completed on August 8, 2014.
Click for More Information Kaweah Delta Water Conservation District Paregien Basin Project Reclamation proposes to provide WaterSMART program grant funds to the Kaweah Delta Water Conservatio... FONSI signed on August 20, 2013.
Click for More Information Kern National Wildlife Refuge, Annual Acquisition and Conveyance of up to 20,000 Acre-Feet of Water to Meet FWS Level 4 Water Supply Needs. The proposed action is for Reclamation to enter into annual agreements with Kern-Tulare Water Distri... FONSI signed and Final EA completed September 7, 2007.
Click for More Information Knights Landing Outfall Gates Fish Passage Barrier Project The Bureau of Reclamation, a Cooperating Agency with the U.S. Army Corps of Engineers (USACE), propo... FONSI signed 8/31/20015
Click for More Information Long-Term Environmental Water Account EIS/EIR The Environmental Water Account (EWA) was established in the CALFED Programmatic EIS/EIR. The purpo... Project is now inactive.
Click for More Information Long-term Recapture and Recirculation of San Joaquin River Restoration Program Flows Reclamation proposes to develop and implement a long-term plan for recirculation, recapture, reuse, ... Four scoping meetings to be held August 10-13, 2015.
Click for More Information Long-Term Water Transfers Reclamation will implement a long-term water transfer program to facilitate voluntary water transfer... Record of Decision signed on May 1, 2015.
Click for More Information Los Carneros Water District Recycled Water Pipeline Project The Los Carneros Water District Recycled Water Pipeline Project involves Reclamation providing two A... FONSI signed and EA completed on July 20, 2015.
Click for More Information Los Vaqueros Expansion Project EIS/EIR The objectives of the Los Vaqueros Reservoir Expansion Project are to develop water supplies for env... Record of Decision signed March 11, 2011.
Click for More Information Lower American River Anadromous Fish Habitat Restoration Project Reclamation completed an EA and signed a FONSI in 2008 to complete work in the lower American River ... Finding of No Significant Impact signed - Lower American River Anadromous Fish Habitat Restoration Program.
Click for More Information Madera Irrigation District Water Conservation, Telemetry Upgrade & Improvement Project Reclamation is providing grant funding through the WaterSMART Program: Water and Energy Efficiency g... FONSI signed and EA completed on March 17, 2014.
Click for More Information Mendota Dam Sluice Gates Replacement Project Central California Irrigation District (CCID) would replace all 6 of the existing Calco rectangular ... FONSI signed and final EA available on December 30, 2011.
Click for More Information Mendota Pool Bypass and Reach 2B Improvements Project The Proposed Action is a component of the San Joaquin River Settlement (October 2006) and is located... See attached notice of intent.
Click for More Information Merced Irrigation District Arena Canal and Howard Lateral Water Conservation Project Reclamation is providing a CALFED Water Use Efficiency Grant to the Merced Irrigation District (MID)... FONSI signed on October 16, 2012.
Click for More Information Merced Irrigation District WaterSMART Drought Resiliency Grant The Merced Irrigation District is seeking a WaterSMART grant from Reclamation to provide funding for... Environmental Assessment and Finding of No Significant Impact (FONSI) released.
Click for More Information Meridian Farms Water Company IRWMP Groundwater Production Element Project EA Under the Sacramento Valley Integrated Regional Water Management Program (SVIWRMP) Grants Program, R... FONSI signed and Final EA completed on January 10, 2012.
Click for More Information Meridian Farms Water Company Phase 2 Fish Screen Project Reclamation proposes to provide cost-share funding to Meridian Farms Water Company (MFWC) through it... FONSI signed on September 29, 2015.
Click for More Information Middle Rosewood Creek Restoration Implementation Area A, Environmental Assessment The purpose of the project is to restore Stream Environmental Zone conditions in Middle Rosewood Cre... FONSI signed October 26, 2010.
Click for More Information Municipal and Industrial Water Shortage Policy, Central Valley Project Reclamation proposes to implement a Municipal and Industrial (M&I) Water Shortage Policy for the Cen... The due date for comments has been extended to March 13, 2015.
Click for More Information Natomas Mutual Water Company & Anadromous Fish Screen Program Pritchard Lake Pumping Plant Fish Screen Project The Proposed Action will screen Natomas Mutual Water Company's (NMWC’s) existing 150 cubic feet per ... Comments are due by February 14, 2014.
Click for More Information New Melones Lake Area Storage Facility Reclamation proposes to construct a new storage facility at the New Melones Lake area to provide sec... The FONSI was signed on June 21, 2013.
Click for More Information North Bay Water Recycling Program (formerly North San Pablo Bay Restoration and Reuse Project) EIR/EIS The Sonoma County Water Agency (SCWA) has worked with Congressman Thompson to introduce H.R. 1326, w... Reclamation signed the Record of Decision on January 28, 2011.
Click for More Information North Bay Water Recycling Program - Sonoma Valley County Sanitation District Recycled Water Project Supplemental EA/Addendum The Sonoma Valley County Sanitation District proposes to slightly revise its portion of Phase 1, the... EA completed and FONSI signed on December 20, 2011.
Click for More Information North of the Delta Offstream Storage (NODOS) Feasibility Study and EIS/EIR The purpose of North-of-the-Delta Offstream Storage Feasibility Study is to investigate a range of s... Initial Alternatives Information Report – May 2006. Plan Formulation Report – May 2009. Draft EIS/EIR and Feasibility Report due in 2013. Final EIS/EIR and Feasibility Report due in 2016. Record of Decision – To be determined.
Click for More Information One-Year Recapture of San Joaquin River Restoration Flows at Patterson Irrigation District and/or Banta-Carbona Irrigation District Reclamation is proposing an action to recapture San Joaquin River Restoration Flows (Restoration Flo... FONSI signed on July 29, 2016.
Click for More Information Palo Alto Recycled Water Project Reclamation proposes to partially fund the Palo Alto Recycled Water Project. The City of Palo Alto p... FONSI signed February 22, 2016.
Click for More Information Patterson Irrigation District Two-Drains Project Reclamation proposes to provide a $1,500,000 grant to Patterson Irrigation District to help fund con... FONSI signed and final EA completed on September 3, 2014.
Click for More Information Pelger Mutual Water Company Groundwater Production Element Project and Sutter Mutual Water Company groundwater Monitoring Project Integrated Regional Water Management Program EA Reclamation proposes to provide a grant to the Pelger Mutural Water Company PMWC) and the Sutter Mut... FONSI signed on January 23, 2012.
Click for More Information Pixley Irrigation District Gravity Conveyance and Conservation Project Reclamation proposes to award Pixley Irrigation District (PID) with a WaterSMART grant to help fund ... The FONSI was signed on 9/26/13.
Click for More Information Porterville Irrigation District In-Lieu Ground Water Recharge Project Reclamation proposes to provide partial funding for Porterville Irrigation District (PID) to constru... FONSI and EA-IS posted 09/19/16. The EA/IS was available for review on June 15, 2016.
Click for More Information Protection of Alkali Scrub Habitat on the Sand Ridge at the Atwell Island Project, Kings and Tulare Counties, California Through an interagency agreement, Reclamation would provide $835,400 to Bureau of Land Management (B... FONSI signed December 11, 2015
Click for More Information RD 2035 Joint Intake and Fish Screen Project EA/IS Reclamation proposes to provide cost-share funding to RD 2035 through its Anadromous Fish Screen Pro... The FONSI was signed on 11/19/2013
Click for More Information Reach 4B, Eastside Bypass and Mariposa Bypass Low Flow Channel and Structural Improvements Project The Bureau of Reclamation and the California Department of Water Resources are proposing to prepare ... NOI published September 9, 2009.
Click for More Information Recirculated Restoration Flows to Red Top The Bureau of Reclamation is proposing a new turnout and pipeline to facilitate a 10-year transfer a... FONSI, Final EA/IS, and Response to Comments - Water Year 2016-2026 Transfer and Exchange from Madera Irrigation District to Chowchilla Water District to the Red Top Area
Click for More Information Recirculation of Recaptured Water Year 2010 San Joaquin River Restoration Program Interim Flows EA Reclamation is entering into various 12 consecutive month transfer and exchange agreements to recirc... Updated FONSI signed and Addendum to the final EA completed on February 4, 2011.
Click for More Information Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows Environmental Assessment Reclamation estimates the recirculation of approximately 20,000 to 80,000 acre-feet (AF), based on 9... FONSI signed and final EA completed on April 3, 2012.
Click for More Information Recirculation of Recaptured Water Year 2013-2017 San Joaquin River Restoration Program Flows Reclamation proposes to implement the provisions of the Settlement pertaining to the Water Managemen... FONSI signed and final EA completed on April 1, 2013.
Click for More Information Reclamation District 108 South Steiner Pumps and Pipeline Project EA Reclamation would help fund Reclamation District 108's (District) proposal to abandon in place the S... Final FONSI signed October 31, 2011.
Click for More Information Refuge Level 2 Exchange Agreement for Tertiary Treated Water Project Reclamation proposes to enter into an agreement with Panoche and San Luis Water Districts (Districts... Finding of No Significant Impact signed on September 27, 2016
Click for More Information Refuge Level 2 Water Exchange between Reclamation and San Luis and Del Puerto Water Districts The Districts propose to fund the costs associated with the delivery of groundwater supplies from tw... FONSI signed October 30, 2014
Click for More Information Refuge Level 2 Water Exchange between the United States and Panoche Water District Resulting in Additional Incremental Level 4 Refuge Water Panoche Water District is proposing to fund the costs of pumping and delivery of groundwater supplie... FONSI signed on August 11, 2015.
Click for More Information Refuge Level 2 Water Exchange with San Luis Water District The Bureau of Reclamation (Reclamation)has prepared an Environmental Assessment (EA) to evaluate and... Comments are due by October 23, 2015.
Click for More Information Rosedale-Rio Bravo Water Storage District Water Conservation, Energy Efficiency, and Solar Power Project Reclamation proposes to contribute $300,000 to the Rosedale-Rio Bravo Water Service District (RRBWSD... FONSI signed and EA completed on January 8, 2016.
Click for More Information Salmon Conservation and Research Facility Water Infrastructure and Supply Project Reclamation proposes to amend an existing water service agreement with the California Department of ... Draft EA was made available for public review from January 29 - February 29, 2016.
Click for More Information San Joaquin River Flow Modification Project EA/IS Reclamation proposes to provide two years of continued implementation of State Water Resources Contr... FONSI signed on February 7, 2012.
Click for More Information San Joaquin River Invasive Vegetation Monitoring and Management EA Reclamation proposes to monitor and manage invasive vegetation with potential to compromise successf... FONSI signed on October 11, 2012.
Click for More Information San Joaquin River Restoration Program Categorical Exclusion Checklists 2014 onwards Attached are completed Categorical Exclusion Checklists (CECs) for the San Joaquin River Restoration...
Click for More Information San Joaquin River Restoration Program Juvenile Fall-Run Chinook Salmon Trap and Haul Study Reclamation proposes to implement a trap and haul study to support the NRDC, et al., v. Kirk Rodgers... 2014 FONSI signed and EA completed on February 20, 2014.
Click for More Information San Joaquin River Restoration Program Programmatic EIS/EIR Reclamation and the California Department of Water Resources have prepared a PEIS/EIR for the San Jo... ************************************************************* Final PEISR available on July 31, 2012. Record of Decision signed September 28, 2012.
Click for More Information San Joaquin River Restoration Program Seepage Management Actions The Bureau of Reclamation, San Joaquin River Restoration Program (SJRRP), proposes to implement seep... Comments may also be mailed to Becky Victorine, Bureau of Reclamation, MP-170, 2800 Cottage Way W-1727, Sacramento, CA 95825 or faxed to 916-978-5469.
Click for More Information San Jose Water Company Phase II Recycled Water Project Reclamation proposes to provide partial funding for the San Jose Water Company’s (SJWC)construction ... Reclamation signed FONSI and completed an EA on July 28, 2015.
Click for More Information San Luis Reservoir Low Point EIS/EIR The Santa Clara Valley Water District has proposed the San Luis Reservoir Low Point Improvement Proj... The Final Plan Formulation Report (PFR) was completed January 2010. The Draft Environmental Impact Statement/Environmental Impact Report Feasibility Report is tentatively due September 2013.
Click for More Information Santa Barbara County Water Agency WaterWise Landscape Rebate Program The Santa Barbara County Water Agency WaterWise Landscape Rebate Program entails Reclamation providi... FONSI signed and EA completed on November 10, 2014.
Click for More Information Shafter-Wasco Irrigation District Kimberlina Groundwater Recharge Basin and Banking Project The Bureau of Reclamation proposes to award grant funds to the SWID from the San Joaquin River Resto... FONSI signed on September 29, 2016.
Click for More Information Shasta Lake Water Resources Investigation EIS and Feasibility Report Reclamation is conducting a feasibility study to evaluate the potential effects of alternative plans... ******************************************** The Draft Feasibility Report was released and available for public review and comment between February 6, 2012 and January 28, 2013.
Click for More Information Short-term Sacramento Valley Water Management Program EIS/EIR. The Short-term phase of the SVWM Program resolves water quality and water rights issues arising from... Public scoping meetings held August 20/21 2003. Draft and Final EIS/EIR dates to be determined.
Click for More Information Site 902 Acquisition, Suisun Marsh Bureau of Reclamation proposes to provide funding to the State of California Department of Water Res...
Click for More Information Smith River Rancheria Water Resources Development Project The Bureau of Reclamation will provide funding to the Smith River Rancheria (SRR) to install and dev... Signed FONSI and Final EA available April 24th, 2010
Click for More Information South Bay Advanced Recycled Water Treatment Facility Environmental Assessment/Initial Study The proposed Advanced Recycled Water Treatment Facility (ARWTF) would treat secondary effluent from ... Memo on revised project signed on April 28, 2010.
Click for More Information South Bay Recycling Program - Phase 1C Projects The City of San Jose (City) has planned and implemented the San José Nonpotable Reclamation Project,... FONSI's and associated addendums, and memorandums to file that are available through May 2012.
Click for More Information South Bay Water Recycling Program San Jose Hedding Extension EA Reclamation, pursuant to funding provided through Title XVI of Public Law 102-575, will provide up t... FONSI signed and EA completed on January 25, 2011.
Click for More Information South County Recycled Water Master Plan - Short Term Phase I The Bureau of Reclamation is proposing to fund through the American Recovery and Reinvestment Act (P... FONSI signed July 1, 2010.
Click for More Information South Delta Improvements Program EIS/EIR The SDIP is a joint California Department of Water Resources (DWR) and Reclamation project that cont... Draft EIS/EIR released November 10, 2005. Draft EIS/EIR hearings in December 2005. Final EIS/EIR Stage 1 Decision released December 15, 2006. Biological Opinion due date to be determined.
Click for More Information South San Joaquin Irrigation District Division 9 Irrigation Enhancement Project The Bureau of Reclamation (Reclamation) has prepared a Draft Environmental Assessment (EA) to evalua... FONSI signed and Final EA completed June 30, 2011
Click for More Information South Sutter Water District Fish Screen Project Reclamation proposes to provide cost-share funding to South Sutter Water District (SSWD) through the... Comments due September 2, 2014.
Click for More Information South Valley Water Bank Authority Pixley Groundwater Banking Project The release of Restoration Flows would reduce annual surface water deliveries to Friant Division wat... Public comment period has been extended to May 19, 2016.
Click for More Information Suisun Marsh Habitat Management, Preservation, and Restoration Plan EIS/EIR Develop a regional plan for Suisun Marsh that balances implementation of the CALFED Program, the Sui... Two public meetings held on November 18, 2010 to receive written comments regarding environmental effects. Final EIS/EIR available on December 6, 2011. Record of Decision signed on April 21, 2014.
Click for More Information Sycamore Island Pond Isolation Project Reclamation is proposing to provide partial funding for a San Joaquin River Conservancy project to i... FONSI signed on February 1, 2016.
Click for More Information Temporary Acquisition of Up to 2,000 Acre-Feet of Water from Merced Irrigation District for the East Bear Creek Unit of the San Luis National Wildlife Refuge EA Reclamation proposes to acquire from 500 to 2000 acre-feet of water from the Merced Irrigation Distr... ****** 2011 Acquisition: Finding of No New Significant Impact signed on November 21, 2011.
Click for More Information Temporary One-Year Transfer and Exchange of Recaptured San Joaquin River Restoration Program Flows from Madera Irrigation District and Chowchilla Water District to Red Top The purpose of the Proposed Action is to implement the provisions of the San Joaquin River Settlemen... FONSI signed and final EA completed on April 2, 2013.
Click for More Information Tranquillity Irrigation District, East-West Intertie Water Conservation Project Reclamation proposes to provide WaterSMART Water and Energy Efficiency Grant funds to Tranquillity I... FONSI signed on April 14, 2016.
Click for More Information Tulare Irrigation District Canal Modernization Project The Tulare Irrigation District Canal Modernization Project is being partially funded through Reclama... The FONSI was signed on May 23, 2013.
Click for More Information Tulare Irrigation District Cordeniz Basin Reclamation is proposing to provide partial funding for a project to expand an existing groundwater ... FONSI was signed and EA completed on November 13, 2015.
Click for More Information Upper San Joaquin River Basin Storage Investigation Geotechnical Field Exploration at River Mile 274 The purpose of the geological field exploration is to collect feasibility-level data for the Upper ... EA/FONSI available August 1, 2014
Click for More Information Upper San Joaquin River Basin Storage Project EIS The purpose of the study is to evaluate proposed actions to increase the storage of water from the S... The public comment period on the Draft EIS has been extended to Monday, October 27, 2014.
Click for More Information Upper Truckee River and Marsh Restoration Project EIR/EIS/EIS The Tahoe Regional Planning Agency, California Tahoe Conservancy and Reclamation are proposing a joi... Comments were due by April 29, 2013. Final EIR/EIS/EIS available on December 11, 2015.
Click for More Information Upper Truckee River Restoration and Golf Course Relocation Project EIS/EIR The Tahoe Regional Planning Agency, the California Department of Parks and Recreation, and Reclamati... Final EIR/EIS available on October 7, 2011.
Click for More Information Upper Truckee River Restoration Project Middle Reaches 3 and 4 EA/IS/IEC The City of South Lake Tahoe with grant funding from the California Tahoe Conservancy and Reclamatio... Final EA/IS/IEC completed April 4, 2008. FONSI signed July 3, 2008.
Click for More Information Volta Wells 5-Year Incremental Level 4 Groundwater Pumping and Level 2 Diversification Project Reclamation proposes to diversify Central Valley Project Level 2 (L2) and supplement Incremental Lev... FONSI signed May 25, 2016
Click for More Information Warren Act Contract for Storage and Conveyance of Non-CVP Water from El Dorado Irrigation District to Westlands Water District in 2015 Reclamation proposes to enter into a one-year Warren Act contract with Westlands Water District (WWD... FONSI signed and final EA completed on August 17, 2015
Click for More Information Warren Act Contract for Storage and Conveyance of Non-CVP Water from Placer County Water Agency to Westlands Water District in 2014 Reclamation proposes to enter into a one-year Warren Act contract with Westlands Water District (WWD... FONSI signed on July 17, 2014.
Click for More Information Water Transfer Program for the San Joaquin River Exchange Contractors Water Authority 2005–2014 EIS EIR The program consists of the transfer of up to 130,000 acre-feet of substitute water annually from 20... Record of Decision signed March 24, 2005.
Click for More Information Water Transfer Program for the San Joaquin River Exchange Contractors Water Authority, 2014-2038 EIS/EIR Reclamation would execute agreements for water transfers with Reclamation, Central Valley Project (... Record of Decision signed on July 30, 2013.
Click for More Information Water Transfers for the San Luis & Delta-Mendota Water Authority in 2014 The San Luis & Delta-Mendota Water Authority (SLDMWA) and its Participating Members will experience ... The Revised EA and Revised FONSI were completed on October 3, 2014.
Click for More Information Water Transfers for the Tehama-Colusa Canal Authority in 2014 The Tehama-Colusa Canal Authority (TCCA) and its Member Units will experience severe water shortages... FONSI signed April 22, 2014.
Click for More Information Water Transfers for the Tehama-Colusa Canal Authority in 2015 The Tehama-Colusa Canal Authority (TCCA) and its Member Units will experience severe water shortages... FONSI signed on April 30, 2015. CEQA Mitigated Negative Declaration and Notice of Determination signed April 14, 2015. Draft Environmental Assessment/Initial Study was available for review March 2, 2015-March 23, 2015.
Click for More Information West Kern Water District Water Use Efficiency Project Reclamation manages the CALFED Water Use Efficiency Grant Program. The program was established to ac... Environmental Assessment and Finding of No Significant Impact are available for public review.
Click for More Information Western Dublin Recycled Water Project Reclamation proposes to provide funding to the Dublin San Ramon Service District (DSRSD) to partiall... FONSI signed and final EA completed on September 2, 2015.
Click for More Information Yountville Recycled Water Project EA/MND The Town of Yountville (Town) is proposing to meet its National Pollutant Discharge Elimination Syst... FONSI signed and final EA completed on April 18, 2013.
Click for More Information Yuba City Feather River Fish Screen Environmental Assessment/Initial Study Reclamation is funding a portion of the Yuba City Fish Screen Project through its Anadromous Fish Sc... FONSI signed and Final EA completed April 27, 2012.

South-Central California Area
 
Project
Summary
Status
Click for More Information 1. 2014-2018 Transfer of CVP Water from Firebaugh Canal Water District Transfer to Pacheco, Panoche, San Luis and Westlands Water Districts ********* 2. 2014-2018 Transfer of CVP Water from Central California Irrigation District to Del Puerto, Panoche, San Luis and Westlands Water Districts********* 3. 2012-2013 Transfer of CVP Water from Central California Irrigation District or Firebaugh Canal Water District to San Luis, Panoche, Del Puerto, and/or Westlands Water Districts 1. In 2014, Reclamation proposes to approve a series of annual transfers of up to 7,500 acre-feet (A... Comments are due April 17, 2014.
Click for More Information 2-Gates Fish Protection Demonstration Project Environmental Assessment The proposed Demonstration Project is a 5-year experiment to validate a new delta smelt behavioral m... Appendices to the EA are available by contacting the person listed above.
Click for More Information 20-Year Extension of the 2005 Mendota Pool Exchange Agreements Reclamation and the Mendota Pool Group (MPG) propose a 20-year long extension of the existing Excha... Draft EIS expected to be available for review in Fall 2013.
Click for More Information 2015 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper-Portion of the Delta-Mendota Canal For groundwater introduced into the upper portion of the Delta-Mendota Canal, the Bureau of Reclamat... The FONSI was signed and EA completed on July 28, 2015.
Click for More Information 2016 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper Portion of the Delta-Mendota Canal Based on hydrologic conditions and regulatory requirements, Reclamation declared a 5 percent allocat... Public review period is from July 27 to August 5, 2016.
Click for More Information 3-Year Extension of the Mendota Pool Group Exchange Agreements Reclamation proposes to execute a series of one-year exchange agreements with the Mendota Pool Group... FONSI signed and EA completed on May 5, 2015.
Click for More Information 5-Year Friant-Kern Canal Groundwater Pump-In Program Due to ongoing drought conditions and reduced water supplies, Friant Division Central Valley Project... FONSI signed on 03/04/2016
Click for More Information Accelerated Water Transfer and Exchange Program for Friant Division and Cross Valley Contractors - Contract Years 2016-2020 Reclamation proposes to continue facilitating efficient and timely water management practices betwee... Comments due January 12, 2016.
Click for More Information Accelerated Water Transfer Program for Friant Division and Cross Valley Central Valley Project Contractors, 2011-2015 EA The proposed Accelerated Water Transfer Program (AWTP) would provide a streamlined process for annua... FONSI signed and final EA completed on February 11, 2011.
Click for More Information Accelerated Water Transfers and Exchanges between South of Delta Contractors for Contract Years 2011-2015 EA Reclamation proposes to continue to implement an accelerated water transfer program (AWTP) that has ... FONSI signed and Final EA prepared February 14, 2011.************************************** FONSI signed on July 29, 2013 and Supplemental EA completed for including water acquisitions for refuges in the South-of-Delta Accelerated Water Transfer Program
Click for More Information Addition of North-Kern Water Storage District to the Friant-Kern Canal Groundwater Pump-in Program Reclamation proposes to approve the introduction of up to 10,000 acre-feet (AF) of North-Kern Water ... Comments due October 7, 2014.
Click for More Information Amendment to the Meyers Groundwater Banking Exchange Agreement Reclamation will amend the existing long-term water banking exchange program to increase the annual ... FONSI signed and Final EA completed on September 16, 2013.
Click for More Information Annual Exchange at the Mendota Pool between the Bureau of Reclamation and Donald J. Peracchi and affiliates for up to 3,600 acre-feet of Farmers Water District’s Groundwater for Central Valley Project Water through February 2015 Reclamation proposes to execute a series of one-year exchange agreements with Donald J. Peracchi and... FONSI signed and final EA completed on June 29, 2012.
Click for More Information Antioch Community Park Soccer Field Improvements Reclamation has provided the East Bay Regional Parks Department approval for the City of Antioch's i... FONSI signed and EA completed on September 25, 2012
Click for More Information Approval of Warren Act Contract and Renewal of Right of Way License for Westlands Water District Reclamation proposes to issue a Warren Act Contract (WAC) for Westlands Water District (WWD) to intr... Comments due April 7, 2014.
Click for More Information Arvin Edison Water Storage District/Westside Mutual Water Company Exchange (2011-2016) EA and Supplemental EA Reclamation proposes to approve a water exchange program between Arvin Edison Water Storage District... Supplmental EA completed and FONSI signed on July 10, 2013 for adding (Westside)member lands in Westlands Water District to the Exchange Program
Click for More Information Arvin-Edison Water Storage District and Metropolitan Water District 10-year Water Transfer/Exchange Program 2013 Reclamation proposes to approve the following for Arvin-Edison Water Storage District (AEWSD) and Me... Comments are due December 21, 2013.
Click for More Information Arvin-Edison Water Storage District and Metropolitan Water District 12-month Water Exchange Project 2012 EA The purpose of the proposed action is to provide for the expeditious and timely delivery of surface ... FONSI signed and final EA completed on April 27, 2012.
Click for More Information Arvin-Edison Water Storage District and Rosedale-Rio Bravo Water Storage District Exchange 2011 EA Arvin-Edison Water Storag District (AEWSD) would deliver up to 100,000 af of its CVP supplies, inclu... FONSI signed and EA completed on March 31, 2011.
Click for More Information Buena Vista Water Storage District BV8 State Water Project Turnout EA Reclamation proposes to award a Water for America Challenge Grant (Challenge Grant) to Buena Vista W... FONSI signed and final EA completed on January 12, 2012.
Click for More Information Cachuma Lake Resource Management Plan EIS The purpose of the RMP is to establish management objectives, guidelines, and actions to be impleme... Record of Decision signed on May 27, 2011.
Click for More Information Caltrans Intersection Widening State Highway 165 and Wolfsen Road Reclamation proposes to authorize the Federal Highway Administration to widen the intersection of Wo... No comments were received.
Click for More Information Cantua Creek Stream Group Improvement Project Under the Proposed Action, Reclamation would approve and partially fund DWR’s proposed Cantua Creek ... FONSI signed and final EA completed on April 19, 2016.
Click for More Information Categorical Exclusion Checklists for SCCAO for 2011 Attached are complete Categorical Exclusion Checklists (CECs) for 2011 for our South Central Califor...
Click for More Information Categorical Exclusion Checklists for SCCAO for 2012 Attached are complete Categorical Exclusion Checklists (CECs) for 2012 for our South Central Califor...
Click for More Information Categorical Exclusion Checklists for SCCAO for 2015 Attached are completed Categorical Exclusion Checklists (CECs) for 2015 for our South Central Califo...
Click for More Information Categorical Exclusion Checklists for SCCAO for 2016 Attached are completed Categorical Exclusion Checklists (CECs) for 2016 for our South Central Califo...
Click for More Information Categorical Exclusion Checklists for SCCAO in 2013 Attached are completed Categorical Exclusion Checklists (CECs) for 2013 for our South Central Califo...
Click for More Information Categorical Exclusion Checklists for SCCAO in 2014 Attached are completed Categorical Exclusion Checklists (CECs) for 2014 for our South Central Califo...
Click for More Information Central Valley Project Draft Finding of No Significant Impact and Environmental Assessment Interim Renewal Contract for Cross Valley Contractors 2016-2018 In accordance with, and as required by, Section 3404(c) of the CVPIA, Reclamation proposes to execut... Comments are due by October 25th, 2015
Click for More Information Central Valley Project Interim Renewal Contract for Westlands Water District, Santa Clara Valley Water District, and Pajaro Valley Water Management Agency 2016-2018 Reclamation proposes to execute six interim renewal contracts for Westlands Water District, Santa Cl... Finding of no significant impact (FONSI) signed February 29, 2016.
Click for More Information Central Valley Project Interim Renewal Contracts for Panoche Water District and San Luis Water District 2013 – 2015 Reclamation proposes to execute two San Luis Unit interim renewal contracts beginning March 1, 2013 ... The FONSI was signed on 2/28/2013.
Click for More Information Central Valley Project Interim Renewal Contracts for Panoche Water District and San Luis Water District 2015-2017 Bureau of Reclamation proposes to execute two interim renewal water service contracts between the Un... FONSI signed and EA completed on February 12, 2015.
Click for More Information Central Valley Project Interim Renewal Contracts for the Cities of Avenal, Coalinga, Huron and the California Department of Fish and Game 2013 – 2015 Reclamation proposes to execute four San Luis Unit interim renewal contracts beginning March 1, 2013... The FONSI was signed on 2/25/2013.
Click for More Information Central Valley Project Interim Renewal Contracts for the Cities of Avenal, Coalinga, Huron and the California Department of Fish and Wildlife 2015 – 2017 In accordance with and as required by Section 3404(c) of the CVPIA, Reclamation proposes to execute ... FONSI signed and EA completed on December 11, 2014.
Click for More Information Central Valley Project Interim Renewal Contracts for Westlands Water District, Santa Clara Valley Water District, and Pajaro Valley Water Management Agency 2014-2016 Reclamation proposes to execute six interim renewal contracts for the Pajaro Valley Water Management... Comments due January 14, 2014.
Click for More Information Central Valley Project Water Service Interim Renewal Contract for the City of Tracy 2014-2016 Reclamation proposes to execute a Delta Division interim renewal contract beginning January 1, 2014 ... FONSI signed and final EA completed on December 6, 2013
Click for More Information City of Fresno Raw Water Pipeline EA Reclamation proposes to approve a permit for the City of Fresno (City) to build a new turnout on the... FONSI signed and final EA completed on February 10, 2016.
Click for More Information City of Tracy Long-term Central Valley Project Water Groundwater Banking with Semitropic Water Storage District Reclamation would approve a long-term (through Contract Year 2035) groundwater banking program betwe... FONSI signed and final EA completed May 26, 2011.
Click for More Information Clayton Regency Mobile Home Park Out of Area Service Agreement Reclamation proposes to permit the delivery of Central Valley Project water by Contra Costa Water Di... Comments due by November 1, 2012.
Click for More Information Contra Costa Canal Replacement Segment 2 Reclamation proposes to authorize Contra Costa Water District to complete a second segment of the pr... FONSI signed and final supplemental EA completed on September 12, 2013
Click for More Information Contra Costa Water District Emerson Property Inclusion EA Reclamation proposes to include the 140 acre Emerson Property into Contra Costa Water District’s ser... FONSI signed and final EA completed on November 6, 2014.
Click for More Information Contra Costa Water District Exchange with Alameda County Water District and Zone 7 Reclamation proposes to approve an exchange of up to 5,000 AF of water between Contra Costa WD and A... FONSI signed and EA completed on November 10, 2015.
Click for More Information Contra Costa Water District Transfer to Byron Bethany Irrigation District Reclamation proposes to approve the transfer of up to 500 AF of Contra Costa Water District’s CVP wa... Draft FONSI and EA were available for review from May 22, 2015 to June 5, 2015.
Click for More Information Contra Costa Water District Transfer to Byron Bethany Irrigation District Reclamation proposes to approve the transfer of up to 4,000 acre-feet of Contra Costa Water Distric... FONSI signed and EA completed on August 29, 2014.
Click for More Information Contra Costa Water District Exchange and/or Transfer with Alameda County Water District Alameda County Water District (ACWD) currently has 5,000 acre-feet of water stored in Los Vaqueros R... Comments due on June 6, 2014.
Click for More Information Contra Costa Water District Exchange with Alameda County Water District and Zone 7 Alameda County Water District (WD) and Zone 7 are State Water Project (SWP) contractors located in A... Comments due on October 12, 2015.
Click for More Information Contra Costa Water District Gilbert Property Inclusion Contra Costa Water District has a long-term water service contract with Reclamation for receipt of C... Comments due by COB January 31, 2017.
Click for More Information Contra Costa Water District Installation of a French Drain at Mori Court near Rose Ave On July 28, 2014, the Bureau of Reclamation (Reclamation) completed a Categorical Exclusion Checkli... Categorically exempted May 2015
Click for More Information Contra Costa Water District Shortcut Pipeline Improvements Project The Shortcut Pipeline (Shortcut) is a cement-mortar-lined and coated steel water supply pipeline bui... Comments due by COB 1/30/2017
Click for More Information Contra Loma Reservoir and Recreation Area, Resource Management Plan and EIS The Bureau of Reclamation (Reclamation) has prepared a RMP/EIS for Contra Loma Reservoir and Recreat... Record of Decision signed on April 22 ,2015.
Click for More Information Conveyance of State Water Project Water in Federal Facilities in Santa Clara Valley Water District, 2015-2019 Reclamation proposes to issue a five-year Warren Act contract to Santa Clara that would allow conv... EA completed and FONSI signed on June 1, 2015. Draft EA/FONSI was available for public comment from May 7, 2015 to COB May 22, 2015.
Click for More Information County of Fresno, Arvin-Edison Water Storage District, Lower Tule River Irrigation District, and Terra Bella River Irrigation District Request for Approvals of Water Transfers to Serve the Millerton New Town Development Under the Proposed Action, Reclamation would approve the delivery of CVP M&I supplies to additional ... FONSI and Environmental Assessment with Appendices A-H posted.
Click for More Information County Service Area 34 Winchell Cove Pipeline Project EA Reclamation proposes to issue a license to Fresno County (County) to construct, maintain, and operat... FONSI signed on April 5, 2013.
Click for More Information Cross Valley CVP Contractors' Interim Renewal Contracts and Exchanges 2012 Reclamation proposes to renew Interim renewal contracts (IRCs) for the Cross Valley contractors begi... FONSI signed and final EA completed on February 29, 2012.
Click for More Information Cross-Valley Contractors Interim Renewal Contracts 2014 The Bureau of Reclamation proposed to execute up to eight Interim Renewal Contracts with the seven C... FONSI signed and final EA completed on February 28, 2014.
Click for More Information Del Puerto Water District Alternate Points of Delivery on the California Aqueduct Reclamation proposes to approve State Water Project (SWP) Turnouts #B, #C, and # D in reach 2B of th... Comments due September 16, 2013.
Click for More Information Delano-Earlimart Irrigation District Turnipseed Expansion EA Reclamation proposes to award Delano-Earlimart Irrigation District (DEID) with grants that would hel... FONSI signed and Final EA completed on May 3, 2011.
Click for More Information Delano-Earlimart Irrigation District Turnipseed Groundwater Bank Phase II Reclamation will award DEID with a Recovery Act-funded Challenge Grant to help the district fund the... Final EA completed and FONSI signed May 3, 2011.
Click for More Information Delta Lands Reclamation District 770, 2010 Warren Act Contract and License Reclamation entered into a Warren Act contract and license with RD770 in 2010 to allow for the intro... Final Supplemental FONSI and EA signed June 1, 2011.
Click for More Information Delta Lands Reclamation District No. 770 Long-term Warren Act Contract EA Reclamation proposes to approve a Warren Act contract and license, both to be executed for a 25-year... Waiting for completion of endangered species consultation.
Click for More Information Draft Environmental Assessment Central Valley Project Interim Renewal Contract for the City of Tracy 2016-2018 EA-15-021 This Environmental Assessment has been prepared to examine the impacts on environmental resources as... Comments due by December 8, 2015.
Click for More Information East Bay Regional Park District's Contra Loma Boat Launch Facility Improvements Project The Bureau of Reclamation (Reclamation) constructed the Contra Loma Reservoir in 1967 as part of the... The EA was available for public review from December 9, 2015 to December 23, 2015.
Click for More Information Eastside Conveyance Project EA Reclamation proposes to approve a transfer from the San Luis Canal Company to Panoche Water District... FONSI signed and final EA completed July 7, 2011.
Click for More Information Exchange Agreement for Water in San Luis Reservoir and Millerton Lake to Facilitate Water Supply for the Exchange Contractors and Friant Division Contractors In order to avoid an interruption in water deliveries and disputes between the parties, Reclamation ... Final Environmental Assessment and FONSI are released.
Click for More Information Exchange Agreement for Water in San Luis Reservoir and Millerton Lake Between Arvin-Edison Water Storage District and the San Joaquin River Exchange Contractors Reclamation proposes to facilitate the exchange of up to 30,000 acre-feet of Arvin-Edison’s availabl... FONSI signed and Final EA completed on May 19, 2014.
Click for More Information Exchange Agreement for Water in San Luis Reservoir and Millerton Lake Between Dudley Ridge Water District and the San Joaquin River Exchange Contractors Reclamation proposes to facilitate an exchange of up to 6,900 AF of Dudley Ridge Water District’s S...
Click for More Information Exchange Agreement for Water in San Luis Reservoir and Millerton Lake Between Kern-Tulare Water District, Delano-Earlimart Irrigation District, and the San Joaquin River Exchange Contractors Reclamation proposes to facilitate an exchange agreement between Kern- Tulare Water (Kern-Tulare), ... FONSI signed and final EA prepared on April 21, 2015.
Click for More Information Exchange Agreement for Water in San Luis Reservoir and Millerton Lake between Reclamation and Westlands Water District to Facilitate Water Supply for the Exchange Contractors and Friant Division Contractors Reclamation proposes to facilitate an exchange of 13,195 AF of Westlands available CVP and non-CVP ... FONSI signed on June 25, 2015.
Click for More Information Exchange with City of Fresno and Fresno Irrigation District for Up to 10,000 acre-feet of Water in Millerton Lake for Water in San Luis Reservoir Reclamation proposes to exchange up to 10,000 acre-feet of the City of Fresno's (City) and Fresno Ir... FONSI signed on July 29, 2016.
Click for More Information Exchange with Friant Division Contractors for up to 10,000 Acre-Feet of Water in Millerton Lake for Water in San Luis Reservoir To satisfy historic water rights, the Bureau of Reclamation has agreed to provide water to the San J... Final Environmental Assessment and Finding of No Significant Impact released.
Click for More Information Firebaugh Canal Water District 2nd Lift Canal Lining Project Phase 5 - Washoe Avenue to Ashlan Avenue The Bureau of Reclamation proposes to award $564,000 to FCWD through CALFED Water Use Efficiency Gra... EA made available for public review from November 30, 2016 through December 7, 2016.
Click for More Information Five-year Warren Act Contracts for Banta-Carbona Irrigation District, Byron-Bethany Irrigation District, Patterson Irrigation District, and West Stanislaus Irrigation District EA and Supplemental EAs Reclamation proposes to issue five-year temporary Warren Act contracts in 2010 for the storage and c... Supplemental EA prepared and FONSI for Additional Point of Delivery for Byron Bethany Irrigation Distric't Non-Central Valley Project Water to Westlands Water District signed on June 12, 2012.
Click for More Information Flyin' J Ranch 5-Year Warren Act Contract for Conveyance and Storage of Groundwater Within Friant Division Facilities Reclamation proposes to issue a five-year (through February 28, 2019) Warren Act contract for the co... FONSI signed and EA completed on March 23, 2015. Draft EA was available for public comments from October 23, 2014 to November 5, 2014.
Click for More Information Four Separate Assignments between Friant Division Contractors and Central Valley Project Contractors Located within the Friant Division Service Area EAs Reclamation proposes to approve assignments of Central Valley Project water between Friant Division ... FONSIs signed on September 27, 2012.
Click for More Information Fresno County Water Works District No. 18 and Lower Tule River Irrigation District Request for Approvals Pursuant to the Friant Ranch Specific Plan Reclamation proposes to approve Fresno County Waterworks District No. 18 (FCWW 18)request for(1)incl... Final EA available, FONSI signed August, 2013.
Click for More Information Fresno Irrigation District Gould Canal to Friant Kern Canal Intertie Project Reclamation proposes to: (1) enter into a series of Warren Act Contracts and exchange agreements ove... FONSI signed on August 24, 2016, Final EA, and Appendix A are now posted.
Click for More Information Fresno Irrigation District Oleander Groundwater Banking Project EA Reclamation would issue a Water Conservation Challenge Grant to Fresno Irrigation District for const... FONSI signed and final EA completed on February 28, 2011.
Click for More Information Fresno Irrigation District's Briggs Canal Improvement Project Reclamation proposes to award a $300,000 WaterSMART: Water and Energy Efficiency grant (WaterSMART G... FONSI signed and Final EA completed on November 21, 2011.
Click for More Information Friant-Kern Canal Groundwater Pump-In Program Warren Act Agreements Reclamation proposes to enter into Warren Act agreements with the CVP contractors located in the Fri... Draft FONSI and EA available for public review on April 10, 2014.
Click for More Information Grazing Authorization for Retired Lands in Fresno County Reclamation proposes to issue a land use authorization that would provide access to and allow grazin... FONSI signed on January 11, 2016.
Click for More Information Hilton Creek Temporary Water Tanks Reclamation, or its designee, will install four temporary above-ground water tanks near the Lower Re... Categorical Exclusion Checklist (CEC-16-020) completed and Signed on June 21, 2016
Click for More Information Inclusion Review for Baldocchi Property into Contra Costa Water District Boundaries Reclamation proposes to approve including the Baldocchi Property into the Contra Costa Water Distric... Comments due on November 26, 2014.
Click for More Information Issuance of a Permit to the Cachuma Operation and Maintenance Board for Modification to Four Air Vacuum/Air Release Valves along the South Coast Conduit In 2012, the Bureau of Reclamation (Reclamation) performed an inspection of the South Coast Conduit... Categorically Excluded May 2015
Click for More Information James Irrigation District's Water Banking Expansion Project Reclamation proposes to award grant(s) to James ID for its’ proposed Project in order to partially f... Comments due COB on March 27, 2015.
Click for More Information Kaweah River Water Warren Act Agreements Reclamation proposes to issue Warren Act agreements to seven Friant Division contractors under Artic... Comments are due July 31, 2014.
Click for More Information Kern-Tulare Water District and Lindsay-Strathmore Irrigation District Warren Act Contract EA Reclamation proposes to approve storage, conveyance, and/or diversion of non-CVP water in Federal fa... Comments are due on February 24, 2014
Click for More Information Kern-Tulare Water District/West Kern Water District Groundwater Banking Project Reclamation proposes to approve a water banking project in which Kern-Tulare Water District would ba... FONSI signed and final EA completed on May 16, 2013.
Click for More Information Lake Casitas Fire Station Upgrades The Forest Service has identified an opportunity to improve water quality protection at their Lake C... Comments due March 13, 2014.
Click for More Information Lake Casitas Resource Management Plan EIS Resource Management Plan for Federal lands associated with the Casitas Dam and Lake Casitas, Ventura... Record of Decision signed on April 11, 2011.
Click for More Information Land Use Authorization and License Amendment for PG&E’s Proposed Gas Pipeline Installation and Bayview Station Expansion near the San Luis (Volta) Wasteway Reclamation will issue a perpetual land use authorization to PG&E for the installation, operation, a... Comments due March 14, 2014.
Click for More Information Long-term Contract for the Exchange of Water between the Bureau of Reclamation and Byron-Bethany Irrigation District – Delta Division and San Luis Unit Reclamation proposes to execute a long-term (up to 40-year) exchange contract and a long-term (up to... FONSI signed on February 7, 2014.
Click for More Information Long-Term Warren Act Contract with Cawelo Water District EA Reclamation proposes to execute a Warren Act (WA) contract to allow for the conveyance of up to 20,0... FONSI signed on December 23, 2011.
Click for More Information Los Banos Creek Diversion Project Reclamation proposes to issue a series of Warren Act contracts to Central California Irrigation Dist... Daft EA/FONSI open for public review between November 25, 2014 and December 22, 2014 COB. FONSI signed and EA completed on March 13, 2015.
Click for More Information Madera Irrigation District Hidden Unit 5-Year Warren Act Contract EA Reclamation proposes to issue Warren Act contract to Madera Irrigation District (MID) for use of Hid... Comments were due October 18, 2010.
Click for More Information Madera Irrigation District Long-Term Banking Project with North Kern and Semitropic Water Storage Districts Reclamation propoes to approve Madera Irrigation District’s (MID) delivery of its Central Valley Pro... The Draft EA and Draft FONSI are available for public review from July 2, 2012 through August 2, 2012.
Click for More Information Madera Irrigation District One-Year Transfer to North Kern Water Storage District and/or Semitropic Water Storage District 2011 EA Reclamation proposes to approve a one year transfer prior to February 28, 2012 of up to 20,000 acre-... FONSI signed and Final EA completed on September 16, 2011.
Click for More Information Madera Irrigation District Storage and Conveyance of Non-Project Water in Friant Division and Hidden Unit Facilities, 2013-2043 the District requests approval of storage and conveyance of up to 25,000 af of non-CVP water in Fria... FONSI signed on January 31, 2014.
Click for More Information Madera Irrigation District Water Supply Enhancement Project EIS Madera Irrigation District (MID)proposes to construct a groundwater bank on the property known as Ma... Record of Decision signed on August 1, 2011.
Click for More Information Mendota Pool 10-Year Exchange Agreements EIS This EIS evaluated the exchange of up to 25,000 acre-feet of water per year over a 10-year period b... Record of Decision signed on March 30, 2005.
Click for More Information Mendota Pool 2001 Exchange Agreement EA The Mendota Pool Group (MPG) proposed to introduce up to 31,000 acre-feet of non-CVP water from grou... FONSI signed on August 6, 2001.
Click for More Information Merced Irrigation District Garibaldi/McCoy Laterals Water Conservation Project Reclamation proposes to partially fund Merced Irrigation District's (MID) Garibaldi and McCoy Latera... FONSI signed and final EA completed on October 21, 2011.
Click for More Information Mercy Springs Water District and Fresno Slough Water District Multi-Year Transfers to Angiola Water District EA Reclamation proposes to approve a series of annual transfers of up to 1,300 acre-feet per year (AFY)... FONSI signed and final EA completed on August 23, 2012.
Click for More Information Millerton Lake Resource Management Plan and General Plan Programmatic EIS/EIR The plan will establish management objectives, guidelines and actions to protect water supply and qu... Record of Decision signed on November 4, 2011.
Click for More Information Millerton Lake State Recreation Area South Shore Maintenance Yard Improvements Project Reclamation proposes to approve and fund, through an existing 50/50 cost share financial assistance ... FONSI signed and final EA completed on August 3, 2012.
Click for More Information Modification of the Grassland Bypass Project 2009 Use Agreement to Correct the Boundary of the Grasslands Drainage Area The Grassland Bypass Project (GBP) was designed to improve water quality in more than 93 miles of w... Categorically Exempted May 2015
Click for More Information MU5 Farms Lateral 32.2 Turnout and Irrigation Pipeline Project on the Madera Canal Reclamation proposes to issue an MP-620 encroachment permit to MU5 Farms for construction of a turno... Comments due by COB December 14th, 2016.
Click for More Information Nine-Year Annual Transfer of up to 560 acre feet of Settlement Contract Water to Carvalho Owned Lands Carvalho Ranch currently diverts 600 AF of CVP water pursuant to Settlement Contract Number 11-WC-20... FONSI signed January 22, 2016
Click for More Information North Kern Water Storage District Lerdo/Calloway Canal Intertie Project Under Title IV of the American Reinvestment and Recovery Act (ARRA) for drought relief, the Bureau o... FONSI signed and final EA completed on February 18, 2010.
Click for More Information North of O’Neill Long-term Exchange Agreements Reclamation proposes to enter into long-term exchange agreements with the Department of Water Resour... FONSI signed and final EA completed on June 16, 2015.
Click for More Information North Valley Regional Recycled Water Program The Del Puerto Water District (DPWD) and the Cities of Turlock and Modesto (Cities) propose to imple... Final EIS available on September 15, 2015. Record of Decision signed on May 6, 2016.
Click for More Information Oro Loma Water District Partial Assignment of 4,000 acre-feet of Central Valley Project Water to Westlands Water District EA Reclamation proposes to issue a partial assignment contract to Westlands Water District (Westlands) ... FONSI signed and final EA completed on February 27, 2012.
Click for More Information Patterson Irrigation District 10-Year Transfer and or Warren Act Contract for up to 36,000 acre-feet of Available Surface Water Supply to Santa Clara Valley Water District Reclamation proposes to approve Patterson Irrigation District's (PID) delivery of up to 36,000 acre-... FONSI signed and final EA completed on September 23, 2014.
Click for More Information Patterson Irrigation District One-Time Delivery of Replacement Water to Del Puerto Water District Environmental Assessment Reclamation will approve a request from Patterson Irrigation District (PID), on behalf of Del Puerto... FONSI signed and final EA available August 7, 2009.
Click for More Information Poso Creek Integrated Regional Water Management Plan and 25-Year Groundwater Banking, Transfer, and Exchange Program Reclamation proposes to approve a 25-year groundwater banking, transfer, and exchange program as par... The FONSI was signed on May 9, 2012.
Click for More Information Reclamation District 773 Fabian Tract Spoils Pile Reuse License Reclamation proposes to issue a license to allow RD 773 to use dredged material to reinforce the lev... FONSI signed and Final EA completed on January 17, 2013.
Click for More Information Renewal of Authorization for Department of Water Resources to Store Dredged Material on Reclamation Property The renewed 5-year license would authorize the California Department of Water Resources to continue ... FONSI signed and final EA completed on June 23, 2014.
Click for More Information Root Creek Water District Transfer, Exchange, and Temporary Water Service Contract EA Reclamation's action consists of approving the construction of two new turnouts on Madera Irrigation... FONSI signed and final EA completed on December 30, 2011.
Click for More Information Sacramento-Yolo Mosquito and Vector Control District Treatment Integrated Pest Management Plan. EA The proposed action would approve a 10-year license for the Sacramento-Yolo Mosquito and Vector Cont... Waiting for completion of consultation on endangered species.
Click for More Information San Andreas and Staten Island Salinity Stations Refurbishments FONSI-12-027 Reclamation proposes to replace the San Andreas and Staten Island Salinity Stations with better qual... Comments are due by January 30, 2016.
Click for More Information San Felipe Pipeline Road/Levee and Culvert Repair between the Santa Clara Conduit CFI/CFO EA-15-007 Santa Clara, on Reclamation’s behalf, proposes to replace four culverts and to repair eroded portion... FONSI signed on July 22, 2016.
Click for More Information San Luis & Delta-Mendota Water Authority 2015 Delta-Mendota Canal Reverse Flow Project Reclamation proposes to approve the installation of a 75 cfs temporary pumping plant at MP 54.41 on ... Draft EA was available for review May 18 - May 22, 2015.
Click for More Information San Luis Drainage Feature ReEvaluation Data Gathering Within The purpose of the Proposed Action is to gather subsurface data for facility footprints, pipeline al...
Click for More Information San Luis Drainage Feature Reevaluation Implementation Demonstration Treatment Facility at Panoche Drainage District EA Reclamation proposes to construct, operate, and maintain for 18 months a demonstration facility for ... FONSI signed and final EA completed on June 7, 2012.
Click for More Information San Luis Reservoir State Recreation Area Resource Management Plan/General Plan and Programmatic EIS/EIR The San Luis Reservoir State Recreation Area (SRA) consists of more than 27,000 acres of land owned ... Public scoping meetings were held in early 2003.
Click for More Information San Luis Solar Project Reclamation proposes to grant a 30-year Land Use Authorization to San Luis Renewables and/or their ... The comment period has been extended to Friday, January 22, 2016.
Click for More Information San Luis Unit Long Term Contract Renewal EIS EIS evaluating the effects of the renewal of 9 San Luis Unit Contractors long-term CVP water contrac... Comment period extended to April 10, 2006. Currently on hold. PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov
Click for More Information San Luis Unit Water Service Interim Renewal Contracts 2008 - 2011 The purpose of the proposed action is to execute seven San Luis Unit interim renewal contracts for u... Waiting to complete Endangered Species Act consultation before signing the PWD and SLWD FONSIs. PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov
Click for More Information San Luis Unit Water Service Interim Renewal Contracts 2010-2013 Reclamation proposes the renewal of 11 interim renewal contracts beginning March 1, 2010 for Westlan... FONSI signed and Final EA completed on February 27, 2010.
Click for More Information San Luis Water District Five-Year Warren Act Contract and License Renewal Reclamation proposes to issue a five-year Warren Act contract that would allow San Luis Water Distri... FONSI signed and final EA completed on August 1, 2012.
Click for More Information San Luis Water District's and Panoche Water District's Water Service Interim Renewal Contracts 2011-2013 EA The Proposed Action is the continued delivery of Central Valley Project (CVP) water under the interi... FONSI signed and final EA completed on February 28, 2011.
Click for More Information Santa Clara Conduit Maintenance and Repairs Project Reclamation proposes to approve the shutdown, inspection, repair, and refilling of the Santa Clara C... FONSI signed and final EA completed on February 8, 2011.
Click for More Information Santa Clara Valley Water District California Aqueduct Reverse Flow Project The State of California is currently experiencing unprecedented water management challenges due to s... Comments on draft EA due COB on November 18, 2014.
Click for More Information South Coast Conduit Upper Reach Reliability Project EIS/EIR Reclamation and the Cachuma Operations and Maintenance Board propose to construct a redundant pipeli... Record of Decision signed May 11, 2011.
Click for More Information South-of-Delta Accelerated Water Transfer and Exchange Program Contract Years 2016- 2020 Reclamation proposes to implement an accelerated process for annual water transfers and/or exchanges... Comments due by January 22, 2016.
Click for More Information Southern San Joaquin Municipal Utility District Partial Assignment of 5,000 acre feet of Central Valley Project Water to Kern-Tulare Water District EA Reclamation proposes to approve the partial assignment of 5,000 AF of Southern San Joaquin Municipal... FONSI signed and Final EA completed on January 26, 2012.
Click for More Information Stone Corral Irrigation District Warren Act Approval Reclamation proposes to issue a five year Warren Act approval (effective through February 29, 2020) ... FONSI signed on July 28, 2015.
Click for More Information Storage and Conveyance of Non-Central Valley Project Water in Federal Facilities for the South of Delta Central Valley Project Contractors (2012-2013) The San Luis & Delta-Mendota Water Authority (Water Authority) proposes to purchase up to 30,000 acr... FONSI signed and final EA completed on July 3, 2012.
Click for More Information Storage and Conveyance of the City of Santa Barbara's Gibraltar Reservoir Pass Through Water in and Through Cachuma Project Facilities Reclamation proposes to execute Warren Act contracts [temporary (5-year) and long-term (40-year)] wi... Draft EA and FOSNI available.
Click for More Information Storage, Conveyance, or Exchange of Yuba Accord Water in Federal Facilities for South of Delta Central Valley Project Contractors Reclamation proposes to execute Warren Act contracts with various South of Delta (SOD) Central Valle... The documents are available for public comment May 4 through May 10, 2016.
Click for More Information Table Mountain Rancheria as Recipient for the Madera Irrigation District and Flyin' J Contracts Table Mountain Rancheria has an agreement with Madera Irrigation District (ID) to receive a portion ... Draft EA available for public review July 18 - August 17, 2016.
Click for More Information Temporary Change in the Selenium Maximum Contaminant Level for Groundwater Introduced into the Upper Portion of the Delta-Mendota Canal Reclamation proposes to temporarily change the selenium maximum contaminant level (MCL) in the upper...
Click for More Information Temporary Change in Water Quality Requirements for the Friant-Kern Canal Groundwater Pump-in Program Reclamation proposes to temporarily allow the introduction of groundwater from wells with high nitra... Comments due COB on November 13, 2014.
Click for More Information Ten-Year Exchange Agreements and/or Warren Act Contract for Conveyance of Groundwater in the Delta-Mendota Canal - Contract Years 2013 through 2023 Reclamation executed a 5-year Exchange Agreement and/or 5-year Warren Act contract with requesting C... The EA and FONSI will be available for public review from November 13, 2012 through December 13, 2012.
Click for More Information Three Delta Division and Five San Luis Unit Water Service Interim Renewal Contracts 2012 to 2014 EA The purpose of the Proposed Action is to execute eight interim contracts in order to extend the term... FONSI signed and final EA completed on February 29, 2012.
Click for More Information Tranquillity Irrigation District/San Luis Water District Groundwater Transfer/Exchange Program 2011 through 2013 EA The Proposed Action involved the transfer of up to 15,000 acre-feet of water from Tranquillity Irrig... FONSI signed on March 11, 2011.
Click for More Information Transfer of Operations and Maintenance of the Fish Screen at Rock Slough to the Contra Costa Water District EA Reclamation proposes to transfer the operations and maintenance of the Rock Slough Fish Screen facil... Preparing draft EA.
Click for More Information Transfer of up to 1,500 Acre-Feet of Replacement Water from Patterson Irrigation District to Westlands Water District 2014 Reclamation proposes to approve a one time transfer of 1,500 acre-feet from Patterson Irrigation Dis... FONSI signed and final EA completed on February 19, 2014.
Click for More Information Transfer of up to 442 Acre-Feet of Replacement Water from Patterson Irrigation District to Del Puerto Water District Reclamation proposes to approve Patterson Irrigation District’s one-time delivery of up to 442 acre-... No comments were received.
Click for More Information Tulare Irrigation District Plum Basin Project Phases II and III EA Reclamation proposes to award Tulare Irrigation District (TID) with a WaterSMART Grant to help fund ... FONSI signed and final EA completed on April 18, 2011.
Click for More Information Tulare Irrigation District WaterSMART Funding Grant for Visalia Water Conservation Project and 25-year Exchange with the City of Visalia Reclamation proposes to award a $696,000 WaterSMART Grant for the construction of the Tulare Irrigat... FONSI signed and final EA prepared on August 26, 2014.
Click for More Information Tule River Water 5 Year Warren Act Agreement Reclamation proposes to approve a five-year Warren Act agreement with Terra Bella Irrigation Distric... Final EA and FONSI available.
Click for More Information Tule River Water Warren Act Agreement 2014 Reclamation proposes to issue a Warren Act agreement to Terra Bella Irrigation District under Articl... FONSI signed on July 7, 2014.
Click for More Information Two-Year Exchange Agreements and/or Warren Act Contracts for Conveyance of Groundwater in the Delta-Mendota Canal – Contract Years 2012 through 2014 (March 1, 2012 – February 28, 2014) EA Reclamation proposes to approve leases and/or Warren Act Contracts for pumping water into the Delta-... FONSI signed and final EA completed on May 9, 2012.
Click for More Information Two-Year Exchange Agreements and/or Warren Act Contracts for conveyance of groundwater in the Delta-Mendota Canal, 2011-2013 EA The proposed actions would include issuance of two-year Exchange Agreements and/or two-year Warren A... FONSI signed and Final EA completed on February 28, 2011.
Click for More Information Vegetation and Sediment Maintenance Program at Los Banos Detention Dam EA Reclamation and Department of Water Resources propose to implement a 10-year program to remove accum... FONSI signed and final EA completed on February 7, 2011.
Click for More Information Vista Verde Nine Year Annual Transfer of Settlement Contract Water to Vista Verde-Owned Lands within Westlands Water District Reclamation proposes to approve a series of annual temporary water transfers during each of the next... FONSI signed and final EA completed on July 29, 2012.
Click for More Information Warren Act Contract for Conveyance from Turlock to Del Puerto Water District Reclamation proposes to execute a series of Warren Act Contracts for conveyance of up to 13,400 acre... FONSI signed on May 10, 2016.
Click for More Information Warren Act Contract for Conveyance and Storage of Groundwater from 4-S Ranch and SHS Ranch to Del Puerto Water District Reclamation proposes to issue a Warren Act contract for the introduction of up to 23,000 acre-feet/y... Comments are due May 19, 2014.
Click for More Information Warren Act Contract for Conveyance of Up to 15,000 Acre-Feet from Merced Irrigation District to Westlands Water District and/or San Luis Water District Reclamation proposes to approve a Warren Act Contract (WAC)to allow Merced Irrigation District (MID)... FONSI signed and Final EA completed on September 17, 2013.
Click for More Information Warren Act Contract for Merced Irrigation District Transfer of up to 10,000 acre-feet to Westlands Water District Reclamation proposes to approve a Warren Act Contract for a one-year transfer of up to 10,000 acre-f... FONSI signed on October 22, 2012.
Click for More Information Warren Act Contracts for Banta-Carbona Irrigation District, Byron-Bethany Irrigation District, and Patterson Irrigation District Reclamation proposes to allow the continued annual introduction and conveyance of up to 5,000 AF of... FONSI signed and EA completed on February 12, 2015.
Click for More Information Water Year 2016-2026 Transfer and Exchange from Madera Irrigation District and Chowchilla Water District to Red Top Area Madera Irrigation District (MID) and Chowchilla Water District (CWD), both Friant-Division Long-Term...
Click for More Information West Hills Water Treatment Plant Reclamation proposes to permit San Benito County Water District to make a connection to the Holliste... The FONSI was signed and EA completed on March 10, 2015. The FONSI and EA was available for public review from March 10, 2014 through April 9, 2014.
Click for More Information West Stanislaus Irrigation District Warren Act Contracts Reclamation proposes to issue a series of five-year temporary Warren Act contracts beginning in Janu... FONSI signed on December 30, 2014.
Click for More Information Western Area Power Administration's Proposed Installation of Security Gates at the Tracy Substation Facility - FONSI and EA available at the link below: Reclamation will approve the installation of security upgrades by WAPA at three sites within Reclama... FONSI
Click for More Information Westlands Water District Warren Act Contract for Conveyance of Kings River Flood Flows in the San Luis Canal EA Reclamation proposes to execute a Warren Act contract with WWD for up to five years, which would all... FONSI signed and final EA completed January 26, 2012.
Click for More Information Westlands Water District Coalinga Canal Turnout Project at Milepost 11.58 The Proposed Action would approve the removal and replacement of a pressure tank and 18-inch pipe lo... Comments due by July 2, 2012.
Click for More Information Westlands Water District Groundwater Warren Act Contract Reclamation proposes to enter into a five-year Warren Act Contract with Westlands Water District. Un... Draft EA/FONSI was available for public review from March 11, 2015 to March 26, 2015.
Click for More Information Westside Parkway Bridge Construction on Reclamation Right-of-Way Environmental Assessment Reclamation proposes to issue permits to the City of Bakersfield to construct the Westside Parkway B... FONSI signed on November 21, 2008.
Click for More Information Zebra Mussel Eradication Project for San Justo Reservoir; Hollister Conduit, and San Benito County Water Distribution System Reclamation and San Benito propose to either conduct a zebra mussel eradication project or an eradic... Draft EA/FONSI available for public review from March 18, 2015 to COB April 16, 2015.