Home
DAG Tutorial
Search
Available Downloads
Feedback
The DAG does not reflect the changes in the DoDI5000.02. Work is in progress to update the content and will be completed as soon as possible.
Jump to Content
Jump to Navigation and Tools
Help
.
ACC Practice Center
>
AT&L Knowledge Management...
>
Welcome to the Defense...
>
Chapter 10 -- Decisions...
>
10.9. Acquisition Program...
View History
10.9. Acquisition Program Baseline (APB)
Topic
JavaScript is currently disabled. Some advanced features may not be supported.
Please wait while we load section 10.9. Acquisition Program Baseline (APB)
List of All Contributions at This Location
Rss Link
Show All
|
Filtered By
No items found.
Popular Tags
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
1.0. Overview
1.1. Integration of the DoD Decision...
1.2. Planning Programming Budgeting and...
1.3. Joint Capabilities Integration and...
1.4. Defense Acquisition System
Chapter 2 -- Program Strategies
Chapter 3 -- Affordability and...
3.0. Overview
3.1. Life-Cycle Costs/Total Ownership...
3.2. Affordability
3.3. Analysis of Alternatives
3.4. Cost Estimation for Major Defense...
3.5. Manpower Estimates
3.6. Major Automated Information Systems...
3.7. Principles for Life-Cycle Cost...
Chapter 4 -- Systems Engineering
4.0. Overview
4.1. Introduction
4.1.1. Systems Engineering Policy and...
4.1.2. Systems Engineering Plan
4.1.3. Systems Level Considerations
4.1.4. Engineering Resources
4.1.5. Certifications
4.1.6. Systems Engineering Role in...
4.2. Systems Engineering Activities in...
4.2.1. Life-Cycle Expectations
4.2.2. Pre-Materiel Development Decision
4.2.3. Materiel Solution Analysis Phase
4.2.4. Technology Development Phase
4.2.5. Engineering and Manufacturing...
4.2.6. Production and Deployment Phase
4.2.7. Operations and Support Phase
4.2.8. Technical Reviews and Audits...
4.2.9. Alternative Systems Review
4.2.10. System Requirements Review
4.2.11. System Functional Review
4.2.12. Preliminary Design Review
4.2.13. Critical Design Review
4.2.14. System Verification...
4.2.15. Production Readiness Review
4.2.16. Physical Configuration Audit
4.2.17. In-Service Review
4.3. Systems Engineering Processes
4.3.2. Technical Planning Process
4.3.3. Decision Analysis Process
4.3.4. Technical Assessment Process
4.3.5. Requirements Management Process
4.3.6. Risk Management Process
4.3.7. Configuration Management Process
4.3.8. Technical Data Management Process
4.3.9. Interface Management Process
4.3.10. Stakeholder Requirements...
4.3.11. Requirements Analysis Process
4.3.12. Architecture Design Process
4.3.13. Implementation Process
4.3.14. Integration Process
4.3.15. Verification Process
4.3.16. Validation Process
4.3.17. Transition Process
4.3.18. Design Considerations
4.3.19. Tools Techniques and Lessons...
Chapter 5 -- Life-Cycle Logistics
5.0. Overview
5.1. Life-Cycle Sustainment in the...
5.2. Applying Systems Engineering to...
5.3. Supportability Design...
5.4. Sustainment in the Life-Cycle...
5.5. References
Chapter 6 -- Human Systems Integration...
6.0. Overview
6.1. Total System Approach
6.2 HSI - Integration Focus
6.3. Human Systems Integration Domains
6.4. Human Systems Integration (HSI)...
6.5. Manpower Estimates
6.6. Additional References
Chapter 7 -- Acquiring Information...
Chapter 8 -- Intelligence Analysis...
8.0. Introduction
8.1. Threat Intelligence Support
8.2. Signature and other Intelligence...
8.3. Support to the Intelligence...
Chapter 9 -- Test and Evaluation (T&E)
9.0 Overview
9.1 OSD T&E Organization
9.2 Service-Level T&E Management
9.3 Test and Evaluation
9.4 Integrated Test and Evaluation
9.5 Test and Evaluation Planning
9.6 T&E Reporting
9.7 Special Topics
9.8. Best Practices
9.9. Prioritizing Use of Government Test...
Chapter 10 -- Decisions Assessments and...
10.0. Overview
10.1. Decision Points
10.2. Executive Review Forums
10.2.2. Joint Requirements Oversight...
10.3. Integrated Product and Process...
10.4. Role of Exit Criteria
10.5. Role of Independent Assessments
10.5.3. Preliminary Design Review (PDR)...
10.6. Information Sharing and DoD...
10.7. Management Control
10.8. Program Plans
10.9. Acquisition Program Baseline (APB)
10.10. Periodic Reports
10.11. Major Automated Information...
10.12. Defense Acquisition Executive...
10.13. Acquisition Visibility
10.14. Special Interest Programs
10.15. Relationship of Affordability and...
10.16. Acquisition Program Transition...
Chapter 11 -- Program Management...
11.0. Overview
11.1. Joint Programs
11.2. International Programs
11.3. Integrated Program Management
11.4. Knowledge-Based Acquisition
11.5. Technical Representatives at...
11.6. Contractor Councils
11.7 Property
11.8. Modeling and Simulation (M&S)...
Chapter 12 - Defense Business System...
12.0 Overview
12.1 Business Capability Definition...
12.2 Investment Management (IM) Phase
12.3 Execution
12.4 DBS-specific Criteria
12.5 Tools and Methods
Chapter 13 -- Program Protection
Chapter 14 -- Acquisition of Services
14.0. Overview
14.1. Introduction to the Acquisition of...
14.2. The Planning Phase
14.3. The Development Phase
14.4. The Execution Phase
Appendix A -- REQUIREMENTS ROADMAP...
Appendix B -- SERVICE ACQUISITION...
Appendix C -- SERVICE ACQUISITION MALL...
Appendix D -- MARKET RESEARCH RESOURCES
Appendix E -- GLOSSARY
DoD Directive 5000.01
DoD Instruction 5000.02
TABLE OF CONTENTS
Enclosure 1 -- References
Enclosure 2 -- Procedures
Enclosure 3 -- Acquisition Category...
Enclosure 4 -- Statutory and Regulatory...
Enclosure 5 -- IT Considerations
Enclosure 6 -- Integrated T&E
Enclosure 7 -- Resource Estimation
Enclosure 8 -- Human Systems Integration...
Enclosure 9 -- Acquisition of Services
Enclosure 10 -- Program Management
Enclosure 11 -- Management of Defense...
Enclosure 12 -- Systems Engineering
Recent Policy and Guidance
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All
ACC Practice Center Version
3.2
Application Build 3.2.9
Database Version 3.2.9