10.9. Acquisition Program Baseline (APB)
Topic
JavaScript is currently disabled. Some advanced features may not be supported.
Please wait while we load section 10.9. Acquisition Program Baseline (APB)
List of All Contributions at This Location
Rss Link
Show All
|
Filtered By
No items found.
Popular Tags
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
1.0. Overview
1.1. Integration of the DoD Decision...
1.2. Planning Programming Budgeting and...
1.3. Joint Capabilities Integration and...
1.4. Defense Acquisition System
Chapter 2 -- Program Strategies
2.0 Overview
2.1. Program Strategies—General
2.2. Program Strategy Document...
2.3. Program Strategy Relationship to...
2.4. Relationship to Request for...
2.5. Program Strategy Classification...
2.6. Program Strategy Document Approval...
2.7. Acquisition Strategy versus...
2.8. Technology Development...
2.8.5. Program Schedule
2.8.7. Business Strategy
2.8.8. Resources
2.8.9. International Involvement
Chapter 3 -- Affordability and...
3.0. Overview
3.1. Life-Cycle Costs/Total Ownership...
3.2. Affordability
3.3. Analysis of Alternatives
3.4. Cost Estimation for Major Defense...
3.5. Manpower Estimates
3.6. Major Automated Information Systems...
3.7. Principles for Life-Cycle Cost...
Chapter 4 -- Systems Engineering
Chapter 5 -- Life-Cycle Logistics
5.0. Overview
5.1. Life-Cycle Sustainment in the...
5.2. Applying Systems Engineering to...
5.3. Supportability Design...
5.4. Sustainment in the Life-Cycle...
5.5. References
Chapter 6 -- Human Systems Integration...
6.0. Overview
6.1. Total System Approach
6.2 HSI - Integration Focus
6.3. Human Systems Integration Domains
6.4. Human Systems Integration (HSI)...
6.5. Manpower Estimates
6.6. Additional References
Chapter 7 -- Acquiring Information...
7.0. Overview
7.1. Introduction
7.2. DoD Information Enterprise
7.2.2. Mandatory Policies
7.2.3. The Use of Architecture
7.2.4. Integration into the Acquisition...
7.2.5. DoD Enterprise...
7.3. Interoperability and Supportability...
7.4. Sharing Data, Information, and...
7.5. Information Assurance (IA)
7.5.3. Information Assurance (IA)...
7.5.4. Estimated Information Assurance...
7.5.5. Integrating Information Assurance...
7.5.6. Program Manager (PM)...
7.5.7. Information Assurance (IA)...
7.5.8. Information Assurance (IA)...
7.5.10. Information Assurance (IA)...
7.5.12. Implementing Information...
7.5.13. Information Assurance (IA)...
7.6. Electromagnetic Spectrum
7.6.2. Mandatory Policies
7.6.3. Spectrum Management and E3 in the...
7.6.4. Spectrum Supportability Risk...
7.7. Accessibility of Electronic and...
7.8. The Clinger-Cohen Act (CCA) --...
7.9. Post-Implementation Review (PIR)
7.10. Commercial Off-the-Shelf (COTS)...
7.11. Space Mission Architectures
Chapter 8 -- Intelligence Analysis...
8.0. Introduction
8.1. Threat Intelligence Support
8.2. Signature and other Intelligence...
8.3. Support to the Intelligence...
Chapter 9 -- Test and Evaluation (T&E)
9.0 Overview
9.1 OSD T&E Organization
9.2 Service-Level T&E Management
9.3 Test and Evaluation
9.4 Integrated Test and Evaluation
9.5 Test and Evaluation Planning
9.6 T&E Reporting
9.7 Special Topics
9.8. Best Practices
9.9. Prioritizing Use of Government Test...
Chapter 10 -- Decisions Assessments and...
10.0. Overview
10.1. Decision Points
10.2. Executive Review Forums
10.3. Integrated Product and Process...
10.4. Role of Exit Criteria
10.5. Role of Independent Assessments
10.5.3. Preliminary Design Review (PDR)...
10.6. Information Sharing and DoD...
10.7. Management Control
10.8. Program Plans
10.9. Acquisition Program Baseline (APB)
10.10. Periodic Reports
10.11. Major Automated Information...
10.12. Defense Acquisition Executive...
10.13. Acquisition Visibility
10.14. Special Interest Programs
10.15. Relationship of Affordability and...
10.16. Acquisition Program Transition...
Chapter 11 -- Program Management...
11.0. Overview
11.1. Joint Programs
11.2. International Programs
11.3. Integrated Program Management
11.4. Knowledge-Based Acquisition
11.5. Technical Representatives at...
11.6. Contractor Councils
11.7 Property
11.8. Modeling and Simulation (M&S)...
Chapter 12 - Defense Business System...
12.0 Overview
12.1 Business Capability Definition...
12.2 Investment Management (IM) Phase
12.3 Execution
12.4 DBS-specific Criteria
12.5 Tools and Methods
Chapter 13 -- Program Protection
13.0 Overview
13.1 The Program Protection Process
13.2 The Program Protection Plan (PPP)
13.3 Critical Program Information (CPI)...
13.4. Intelligence and...
13.5. Vulnerability Assessment
13.6. Risk Assessment
13.7. Countermeasures
13.8. Horizontal Protection
13.9. Foreign Involvement
13.10. Managing and Implementing PPPs
13.11. Compromises
13.12. Costs
13.13. Contracting
13.14. Detailed System Security...
13.15. Program Protection Plan (PPP)...
13.16. Program Protection Plan (PPP)...
Chapter 14 -- Acquisition of Services
14.0. Overview
14.1. Introduction to the Acquisition of...
14.2. The Planning Phase
14.3. The Development Phase
14.4. The Execution Phase
Appendix A -- REQUIREMENTS ROADMAP...
Appendix B -- SERVICE ACQUISITION...
Appendix C -- SERVICE ACQUISITION MALL...
Appendix D -- MARKET RESEARCH RESOURCES
Appendix E -- GLOSSARY
DoD Directive 5000.01
ENCLOSURE 1 ADDITIONAL POLICY
DoD Instruction 5000.02
Recent Policy and Guidance
Download the Defense Acquisition...
Weapon Systems Acquisition Reform Act of...
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All
ACC Practice Center Version
3.2
Application Build 3.2.9
Database Version 3.2.9