4.2.5. Engineering and Manufacturing Development Phase

Topic

Previous and Next Page arrows

DEFENSE ACQUISITION GUIDEBOOK
Chapter 4 -- Systems Engineering

4.2.5. Engineering and Manufacturing Development Phase

4.2.5. Engineering and Manufacturing Development Phase

The primary objective of the Engineering and Manufacturing Development (EMD) phase is to develop the product baseline, verify it meets the system functional and allocated baselines, and transform the preliminary design into a producible design, all within the schedule and cost constraints of the program. Systems engineering (SE) activities support development of the detailed design, verification that requirements are met, reduction in system-level risk, and assessment of readiness to begin production and/or deployment. The core SE activities support the two efforts associated with the EMD phase as defined in DoDI 5000.02 for weapon systems acquisition and identified in figure 4.2.5.F1: integrated system design and system capability and manufacturing process demonstration.

Figure 4.2.5.F1. Systems Engineering Activities in the Engineering and Manufacturing Development Phase

Figure 4.2.5.F1. System Engineering Activities in the Engineering and Manufacturing Development Phase

Primary SE focus areas in EMD include:

  • Complete the detailed build-to design of the system
  • Establish the product baseline
  • Conduct integration and tests of system elements and the system (where feasible)
  • Demonstrate system maturity and readiness to begin production for operational test and /or deployment and sustainment activities

The EMD phase includes technical assessment and control efforts, including value engineering techniques described in DAG section 4.3.19.3. Value Engineering, to effectively manage risks and increase confidence in meeting system performance, schedule, and cost goals. SE activities should be integrated with EMD phase-specific test and evaluation and logistics and sustainment activities identified in DAG Chapter 9 Test and Evaluation and Chapter 5 Life-Cycle Logistics, respectively. The planning, scheduling, and conduct of event-driven technical reviews (Critical Design Review (CDR), Functional Configuration Audit (FCA), System Verification Review (SVR), and Production Readiness Review (PRR)) are vital to provide key points for assessing program maturity and the effectiveness of risk-reduction strategies.

A well-planned EMD phase Systems Engineering Plan (SEP) builds on the results of previous activities and significantly increases the likelihood of a successful program compliant with the approved Acquisition Program Baseline (APB).

Implementing the technical planning as defined in the approved SEP guides the execution of the complex and myriad tasks associated with completing the detailed design and integration, and supports developmental test and evaluation activities. The SEP also highlights the linkage between Technical Performance Measures (TPM), risk management, and earned-value management activities to support tracking of cost growth trends. Achieving predefined EMD technical review criteria provides confidence that the system meets stated performance requirements (including interoperability and supportability requirements) and that design and development have matured to support the initiation of the Production and Deployment (P&D) phase.

Roles and Responsibilities

In addition to the general responsibilities identified in DAG section 4.1.4. Engineering Resources, the Program Manager focuses on the following EMD activities, which rely on and support SE efforts:

  • Conduct activities in support of the EMD contract award
  • Resource and conduct event-driven CDR, FCA, SVR, and PRR, and assess whether review criteria are met
  • Establish and manage the initial product baseline established at the CDR
  • Determine path forward on all major (Class I) baseline changes (see DAG section 4.3.7. Configuration Management Process for definition of Class I)
  • Accept system deliveries (i.e., DD-250), as appropriate

In addition to the general roles and responsibilities described in DAG section 4.1.4 Engineering Resources, during this phase it is the Systems Engineer’s responsibility to:

  • Manage the system design to satisfy the operational requirements within the constraints of cost and schedule and to evaluate the system design, identify deficiencies, and make recommendations for corrective action
  • Conduct or support the technical evaluation in support of source selection for the EMD contract award
  • Maintain requirements traceability and linkage to the initial product baseline
  • Conduct event-driven technical reviews, advising the Program Manager on review criteria readiness
  • Lead preparation and conduct of technical reviews
  • Track and report major (Class I) baseline changes and recommend the path forward in accordance with the Configuration Management (CM) process (see DAG section 4.3.7. Configuration Management Process for definition of Class I)
  • Support determination of production rates and delivery schedules
  • Support test and evaluation activities: identify system evaluation targets driving system development and support operational assessments as documented in the Test and Evaluation Master Plan (TEMP) (see DAG Chapter 9 Test and Evaluation)
  • Align the SEP with the TEMP on SE processes, methods, and tools identified for use during test and evaluation
  • Analyze deficiencies discovered from operational assessments and verification methods (developmental test and evaluation); develop and implement solutions to including, but not limited to, rebalancing of system requirements
  • Support logistics and sustainment activities as documented in the Life-Cycle Sustainment Plan (LCSP) (see DAG Chapter 5 Life-Cycle Logistics)
  • Maintain the SEP including generating the update in support of Milestone C
  • Ensure manufacturing process development and maturation efforts
  • Develop approaches and plans to verify mature fabrication and manufacturing processes and determine manufacturing readiness (see the Manufacturing Readiness Level (MRL) Deskbook as one source for assessing manufacturing readiness)
  • Conduct a rigorous production risk assessment and determine risk mitigation plans
  • Identify system design features that enhance producibility (efforts usually focus on design simplification, fabrication tolerances, and avoidance of hazardous materials)
  • Conduct producibility trade studies to determine the most cost-effective fabrication and manufacturing process
  • Assess Low-Rate Initial Production (LRIP) feasibility within program constraints (may include assessing contractor and principal subcontractor production experience and capability, new fabrication technology, special tooling, and production personnel training requirements)
  • Identify long-lead items and critical materials
  • Support update to production costs as a part of life-cycle cost management
  • Continue to support the configuration management process to control changes to the product baseline during test and fielding

Inputs

Table 4.2.5.T1. summarizes the primary inputs associated with this systems acquisition part of the life cycle (see DoDI 5000.02).

Table 4.2.5.T1. Inputs Associated with EMD Phase

Inputs for EMD Phase

Capability Development Document (CDD)

Acquisition Decision Memorandum (ADM) (may contain additional direction)

SEP

  • If programs enter the acquisition life cycle at Milestone B, this is their initial SEP
  • PDUSD(AT&L) memorandum, “Document Streamlining – Program Strategies and Systems Engineering Plan,” April 20, 2011
  • See DAG section 4.1.2 Systems Engineering Plan

Reliability, Availability, Maintainability, and Cost Rationale (RAM-C) Report

  • Attachment to SEP as directed by DTM 11-003; if programs enter the acquisition life cycle at Milestone B, this is their initial RAM-C Report

Reliability Growth Curves (RGCs)

  • Attachment to TEMP as directed by DTM 11-003

Program Protection Plan (PPP)

  • If programs enter the acquisition life cycle at Milestone B, this is the initial PPP
  • Includes Security Classification Guide (SCG), Counterintelligence Support Plan, Criticality Analysis, Anti-Tamper Plan, and Acquisition Information Assurance (IA) Strategy
  • PDUSD(AT&L) memorandum, “Document Streamlining - Program Protection Plan (PPP),” July 18, 2011
  • See DAG Chapter 13 Program Protection

Trade study results

  • Results could include knees-in-the-curves sensitivity analyses, product selections, etc.

Assumptions and constraints

  • Rationale for all assumptions, constraints, and basis for trades
  • Interdependencies defined

Environment, safety, and occupational health (ESOH) analyses

  • Programmatic Environment, Safety, and Occupational Health Evaluation (PESHE) and NEPA/EO 12114 Compliance Schedule

Assessment of technical risk

Consideration of technology issues

  • See DoDI 5000.02, Enclosure 4, Tables 2-1 and 2-2

Technology Readiness Assessment (TRA)

  • Confirmation that critical technologies have been demonstrated in a relevant environment

Interdependencies / interfaces / memoranda of agreement (MOAs)

System performance specification including verification matrix

Other technical information such as models and simulations generated during the TD phase

Prototyping strategy

System Threat Assessment Report (STAR)

Acquisition Program Baseline (APB)

Affordability Assessment

  • Affordability targets treated as KPPs; results of engineering trade-off analyses show cost/schedule/performance trade space around affordability drivers
  • Should cost goals designed to achieve efficiencies and control unproductive expenses without sacrificing sound investment in product affordability
  • See DAG Chapter 3 Affordability and Life-Cycle Resource Estimates

Acquisition Strategy (AS)

Life-Cycle Sustainment Plan (LCSP) (updated)

Initial Information Support Plan (ISP)

Test and Evaluation Master Plan (TEMP)

Informed advice to the developmental test and evaluation (DT&E) planning including Operational Assessments (OAs)

Draft and final Request for Proposal (RFP)

Security Classification Guide (SCG) (updated)

Other analyses

  • Other prior analytic, prototyping, and/or technology demonstration efforts performed by the S&T community. Technology insertion/transition can occur at any point in the life cycle

Activities

The EMD phase activities begin when a favorable Milestone B decision has been made (see DAG section 4.2.4. Technology Development Phase) and end with a successful Milestone C decision. Figure 4.2.5.F2 provides the end-to-end perspective and the integration of SE technical reviews and audits across the acquisition life cycle.

Figure 4.2.5.F2. Weapon System Development Life Cycle

Figure 4.2.5.F2. Weapon System Development Life Cycle

SE activities to support the integrated system design effort include:

  • Realization of the system architecture
  • Performance of system element trade-offs
  • Use of prototypes to mature system designs and drawings. If the program strategy includes competitive development, this may include competitive prototyping during the EMD phase.
  • Development of the initial product baseline and a stable design that conforms to program cost, schedule, and performance requirements
  • Support for the establishment of the developmental test and evaluation environment and associated resources (e.g., people, equipment, test cases, and test ranges)
  • Support of materiel readiness and logistical support efforts
  • Preparation for production by identifying critical manufacturing processes, key product characteristics, and any manufacturing risks

SE activities to support the system capability and manufacturing process demonstration effort include:

  • Build, integrate, and test system elements
  • Fabricate and assemble the system elements and system to the product baseline
  • Identify the process to proactively manage and mitigate Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues in future life-cycle phases
  • Integrate the system and verify compliance with the functional and allocated baselines through developmental test and evaluation (DT&E) efforts (see DAG Chapter 9 Test and Evaluation for more on DT&E)
  • Determine the root cause of problems, identify corrective actions, and manage to completion
  • Address problem/failure reports through the use of a comprehensive data-collection approach such as Failure Reporting, Analysis and Corrective Action System (FRACAS)
  • Refine the initial product baseline and support the development of the Capability Production Document (CPD)
  • Complete producibility activities supporting manufacturing readiness or implementation and initial deployment activities for information systems
  • Support initiation of materiel readiness and logistical support activities including fielding options and training development
  • Perform Environment, Safety, and Occupational Health (ESOH) risk management analyses and ESOH risk acceptance
  • Produce NEPA/EO 12114 documentation
  • Perform corrosion risk assessment
  • Complete certifications as appropriate (see DAG section 4.1.5. Certifications)

Technical reviews and audits typically conducted in EMD:

  • Critical Design Review (CDR) (mandated, establishes initial product baseline, see DAG section 4.2.13. Critical Design Review)
  • System Verification Review/Functional Configuration Audit (SVR/FCA) (see DAG section 4.2.14. System Verification Review/Functional Configuration Audit)
  • Production Readiness Review (PRR) (DAG section 4.2.15. Production Readiness Review)

Test activities during the EMD phase that depend on SE support and involvement include Test Readiness Reviews (TRRs), Developmental Test and Evaluation (DT&E), and Operational Assessments (OAs). The Systems Engineer, in collaboration with the Chief Developmental Tester, should identify system evaluation targets driving system development and support operational assessments as documented in the Test and Evaluation Master Plan (TEMP). Associated SE activities and plans should be in the SEP (see DAG section 4.1.2. Systems Engineering Plan, 4.2.8. Technical Reviews and Audits Overview, and DAG Chapter 9 Test and Evaluation).

Outputs and Products

The technical outputs and products identified in Table 4.2.5.T2 and are some of the inputs necessary to support SE processes in the P&D phase. They should support the technical recommendation at Milestone C that manufacturing processes are mature enough to support Low-Rate Initial Production (LRIP) and generate production-representative articles for operational test and evaluation (OT&E). Technical outputs associated with technical reviews in this phase are addressed later in this chapter.

Table 4.2.5.T2. Technical Outputs Associated with EMD Phase

Technical Outputs from EMD Phase

Informed advice to CPD

Informed advice to Acquisition Decision Memorandum (ADM) and 2366b certification

Verified system

  • Updated functional, allocated, and product baselines; verified production processes, and verification results/ decisions
  • Associated technical products including associated design and management decisions

SEP (updated)

  • PDUSD(AT&L) memorandum, “Document Streamlining – Program Strategies and Systems Engineering Plan,” April 20, 2011
  • See DAG section 4.1.2 Systems Engineering Plan

Updated IMP, IMS, and MOAs/MOUs

RAM-C Report (updated)

  • Attachment to SEP as directed by DTM 11-003

RGC (updated)

  • Attachment to TEMP as directed by DTM 11-003

PPP (updated)

Trade study results

  • Results could include knees-in-the-curves sensitivity analyses, product selections, etc.

Assumptions and constraints

  • Rationale for all assumptions, constraints, and basis for trades
  • Interdependencies updated

ESOH analyses

  • Updated Programmatic Environment, Safety, and Occupational Health Evaluation (PESHE) and NEPA/E.O. 12114 Compliance Schedule

Assessment of technical risk

  • Risk assessment identifying mitigation plans for acceptable risks to allow the program to initiate production, deployment, and operational test and evaluation activities
  • Update system of systems (SoS) risks associated with governance, interdependencies, and complexity

Consideration of technology issues

  • See DoDI 5000.02, Enclosure 4, Tables 2-1 and 2-2

Manufacturing readiness

  • Assessment of manufacturing readiness supports MS C and initiation of production
  • Manufacturing processes have been effectively demonstrated in a pilot line environment

Interdependencies / interfaces / memoranda of agreement (MOAs)

  • Understanding of the unique program interdependencies, interfaces, and associated MOAs

System performance specification (updated if necessary) including verification matrix

  • System element specifications including verification matrix

Product baseline

Other technical information such as models and simulations generated during the EMD phase

Results of EMD prototyping activities

Manufacturing prototyping activities support P&D phase

Post-Critical Design Review (CDR) Assessment (produced by DASD(SE) for Major Defense Acquisition Programs)

Informed advice to APB

  • Updated will cost values and affordability targets as documented in the Acquisition Program Baseline and Acquisition Strategy

Establishes technical information that is the basis of the updates to the Cost Analysis Requirements Description (CARD) and manpower estimates

Informed advice to Affordability Assessment

Manufacturing, performance, and quality metrics critical to program success are identified and tracked

  • 30%, 60%, and 100% completed manufacturing drawings

Production budget/cost model validated and resources considered sufficient to support LRIP and FRP

  • Inputs to MS C, LRIP, and FRP DR

Informed advice to Acquisition Strategy (AS)

  • Informed advice on engineering approaches and strategies, external dependencies, resource requirements, schedule, and risks
  • PDUSD(AT&L) memorandum, “Document Streamlining – Program Strategies and Systems Engineering Plan,” April 20, 2011
  • See DAG Chapter 2 Program Strategies

Informed advice to LCSP (updated)

  • System Support and Maintenance Objectives and Requirements established
  • Updated will cost values and affordability targets as documented in the LCSP, including Informed advice to manpower estimates
  • Confirmation of logistics and sustainment needs (i.e., facilities, training, support equipment) and implementation supporting initial deployment efforts
  • PDUSD(AT&L) memorandum, “Document Streamlining – Life-Cycle Sustainment Plan (LCSP),” September 14, 2011
  • See also DAG Chapter 5 Life-Cycle Logistics

ISP of Record

Informed advice to TEMP (updated)

Informed advice to the DT&E assessments

Informed advice to draft & final RFP for LRIP

  • Informed advice including system specification, SOW, CDRLs, and source selection criteria

Previous and Next Page arrows

Previous Page Next Page

List of All Contributions at This Location

No items found.

Popular Tags

Browse

https://acc.dau.mil/UI/img/bo/minus.gifWelcome to the Defense Acquisition...
https://acc.dau.mil/UI/img/bo/plus.gifForeword
https://acc.dau.mil/UI/img/bo/plus.gifChapter 1 -- Department of Defense...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 2 -- Program Strategies
https://acc.dau.mil/UI/img/bo/plus.gif2.0 Overview
https://acc.dau.mil/UI/img/bo/plus.gif2.1. Program Strategies—General
https://acc.dau.mil/UI/img/bo/plus.gif2.2. Program Strategy Document...
https://acc.dau.mil/UI/img/bo/plus.gif2.3. Program Strategy Relationship to...
https://acc.dau.mil/UI/img/bo/plus.gif2.4. Relationship to Request for...
https://acc.dau.mil/UI/img/bo/plus.gif2.5. Program Strategy Classification...
https://acc.dau.mil/UI/img/bo/plus.gif2.6. Program Strategy Document Approval...
https://acc.dau.mil/UI/img/bo/plus.gif2.7. Acquisition Strategy versus...
https://acc.dau.mil/UI/img/bo/plus.gif2.8. Technology Development...
https://acc.dau.mil/UI/img/bo/plus.gifChapter 3 -- Affordability and...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 4 -- Systems Engineering
https://acc.dau.mil/UI/img/bo/minus.gif4.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif4.1. Introduction
https://acc.dau.mil/UI/img/bo/minus.gif4.2. Systems Engineering Activities in...
https://acc.dau.mil/UI/img/bo/plus.gif4.2.1. Life-Cycle Expectations
https://acc.dau.mil/UI/img/bo/plus.gif4.2.2. Pre-Materiel Development Decision
https://acc.dau.mil/UI/img/bo/plus.gif4.2.3. Materiel Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gif4.2.4. Technology Development Phase
https://acc.dau.mil/UI/img/bo/minus.gif4.2.5. Engineering and Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gif4.2.6. Production and Deployment Phase
https://acc.dau.mil/UI/img/bo/plus.gif4.2.7. Operations and Support Phase
https://acc.dau.mil/UI/img/bo/plus.gif4.2.8. Technical Reviews and Audits...
https://acc.dau.mil/UI/img/bo/plus.gif4.2.9. Alternative Systems Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.10. System Requirements Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.11. System Functional Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.12. Preliminary Design Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.13. Critical Design Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.14. System Verification...
https://acc.dau.mil/UI/img/bo/plus.gif4.2.15. Production Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.16. Physical Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gif4.2.17. In-Service Review
https://acc.dau.mil/UI/img/bo/minus.gif4.3. Systems Engineering Processes
https://acc.dau.mil/UI/img/bo/plus.gif4.3.2. Technical Planning Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.3. Decision Analysis Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.4. Technical Assessment Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.5. Requirements Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.6. Risk Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.7. Configuration Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.8. Technical Data Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.9. Interface Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.10. Stakeholder Requirements...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.11. Requirements Analysis Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.12. Architecture Design Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.13. Implementation Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.14. Integration Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.15. Verification Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.16. Validation Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.17. Transition Process
https://acc.dau.mil/UI/img/bo/minus.gif4.3.18. Design Considerations
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.1. Accessibility (Section 508...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.2. Affordability – Systems...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.3. Anti-Counterfeiting
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.4. Commercial-Off-the-Shelf
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.5. Corrosion Prevention and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.6. Critical Safety Item
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.7. Demilitarization and Disposal
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.8. Diminishing Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.9. Environment Safety and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.10. Human Systems Integration
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.11. Insensitive Munitions
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.12. Intelligence (Life-Cycle...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.13. Interoperability and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.14. Item Unique Identification
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.15. Open Systems Architecture
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.16. Operational Energy
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.17. Packaging Handling Storage...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.18. Producibility Quality and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.19. Reliability and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.20. Spectrum Management
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.21. Standardization
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.22. Supportability
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.23. Survivability and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.24. System Security Engineering
https://acc.dau.mil/UI/img/bo/plus.gif4.3.19. Tools Techniques and Lessons...
https://acc.dau.mil/UI/img/bo/plus.gifChapter 5 -- Life-Cycle Logistics
https://acc.dau.mil/UI/img/bo/minus.gifChapter 6 -- Human Systems Integration...
https://acc.dau.mil/UI/img/bo/plus.gif6.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif6.1. Total System Approach
https://acc.dau.mil/UI/img/bo/plus.gif6.2 HSI - Integration Focus
https://acc.dau.mil/UI/img/bo/plus.gif6.3. Human Systems Integration Domains
https://acc.dau.mil/UI/img/bo/plus.gif6.4. Human Systems Integration (HSI)...
https://acc.dau.mil/UI/img/bo/plus.gif6.5. Manpower Estimates
https://acc.dau.mil/UI/img/bo/plus.gif6.6. Additional References
https://acc.dau.mil/UI/img/bo/minus.gifChapter 7 -- Acquiring Information...
https://acc.dau.mil/UI/img/bo/plus.gif7.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif7.1. Introduction
https://acc.dau.mil/UI/img/bo/plus.gif7.2. DoD Information Enterprise
https://acc.dau.mil/UI/img/bo/plus.gif7.3. Interoperability and Supportability...
https://acc.dau.mil/UI/img/bo/plus.gif7.4. Sharing Data, Information, and...
https://acc.dau.mil/UI/img/bo/plus.gif7.5. Information Assurance (IA)
https://acc.dau.mil/UI/img/bo/plus.gif7.6. Electromagnetic Spectrum
https://acc.dau.mil/UI/img/bo/plus.gif7.7. Accessibility of Electronic and...
https://acc.dau.mil/UI/img/bo/plus.gif7.8. The Clinger-Cohen Act (CCA) --...
https://acc.dau.mil/UI/img/bo/plus.gif7.9. Post-Implementation Review (PIR)
https://acc.dau.mil/UI/img/bo/plus.gif7.10. Commercial Off-the-Shelf (COTS)...
https://acc.dau.mil/UI/img/bo/plus.gif7.11. Space Mission Architectures
https://acc.dau.mil/UI/img/bo/minus.gifChapter 8 -- Intelligence Analysis...
https://acc.dau.mil/UI/img/bo/plus.gif8.0. Introduction
https://acc.dau.mil/UI/img/bo/plus.gif8.1. Threat Intelligence Support
https://acc.dau.mil/UI/img/bo/plus.gif8.2. Signature and other Intelligence...
https://acc.dau.mil/UI/img/bo/plus.gif8.3. Support to the Intelligence...
https://acc.dau.mil/UI/img/bo/plus.gifChapter 9 -- Test and Evaluation (T&E)
https://acc.dau.mil/UI/img/bo/minus.gifChapter 10 -- Decisions Assessments and...
https://acc.dau.mil/UI/img/bo/plus.gif10.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif10.1. Decision Points
https://acc.dau.mil/UI/img/bo/plus.gif10.2. Executive Review Forums
https://acc.dau.mil/UI/img/bo/plus.gif10.3. Integrated Product and Process...
https://acc.dau.mil/UI/img/bo/plus.gif10.4. Role of Exit Criteria
https://acc.dau.mil/UI/img/bo/plus.gif10.5. Role of Independent Assessments
https://acc.dau.mil/UI/img/bo/plus.gif10.5.3. Preliminary Design Review (PDR)...
https://acc.dau.mil/UI/img/bo/plus.gif10.6. Information Sharing and DoD...
https://acc.dau.mil/UI/img/bo/plus.gif10.7. Management Control
https://acc.dau.mil/UI/img/bo/plus.gif10.8. Program Plans
https://acc.dau.mil/UI/img/bo/plus.gif10.9. Acquisition Program Baseline (APB)
https://acc.dau.mil/UI/img/bo/plus.gif10.10. Periodic Reports
https://acc.dau.mil/UI/img/bo/plus.gif10.11. Major Automated Information...
https://acc.dau.mil/UI/img/bo/plus.gif10.12. Defense Acquisition Executive...
https://acc.dau.mil/UI/img/bo/plus.gif10.13. Acquisition Visibility
https://acc.dau.mil/UI/img/bo/plus.gif10.14. Special Interest Programs
https://acc.dau.mil/UI/img/bo/plus.gif10.15. Relationship of Affordability and...
https://acc.dau.mil/UI/img/bo/plus.gif10.16. Acquisition Program Transition...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 11 -- Program Management...
https://acc.dau.mil/UI/img/bo/plus.gif11.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif11.1. Joint Programs
https://acc.dau.mil/UI/img/bo/plus.gif11.2. International Programs
https://acc.dau.mil/UI/img/bo/plus.gif11.3. Integrated Program Management
https://acc.dau.mil/UI/img/bo/plus.gif11.4. Knowledge-Based Acquisition
https://acc.dau.mil/UI/img/bo/plus.gif11.5. Technical Representatives at...
https://acc.dau.mil/UI/img/bo/plus.gif11.6. Contractor Councils
https://acc.dau.mil/UI/img/bo/plus.gif11.7 Property
https://acc.dau.mil/UI/img/bo/plus.gif11.8. Modeling and Simulation (M&S)...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 12 - Defense Business System...
https://acc.dau.mil/UI/img/bo/plus.gif12.0 Overview
https://acc.dau.mil/UI/img/bo/plus.gif12.1 Business Capability Definition...
https://acc.dau.mil/UI/img/bo/plus.gif12.2 Investment Management (IM) Phase
https://acc.dau.mil/UI/img/bo/plus.gif12.3 Execution
https://acc.dau.mil/UI/img/bo/plus.gif12.4 DBS-specific Criteria
https://acc.dau.mil/UI/img/bo/plus.gif12.5 Tools and Methods
https://acc.dau.mil/UI/img/bo/plus.gifChapter 13 -- Program Protection
https://acc.dau.mil/UI/img/bo/minus.gifChapter 14 -- Acquisition of Services
https://acc.dau.mil/UI/img/bo/plus.gif14.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif14.1. Introduction to the Acquisition of...
https://acc.dau.mil/UI/img/bo/plus.gif14.2. The Planning Phase
https://acc.dau.mil/UI/img/bo/plus.gif14.3. The Development Phase
https://acc.dau.mil/UI/img/bo/plus.gif14.4. The Execution Phase
https://acc.dau.mil/UI/img/bo/plus.gifAppendix A -- REQUIREMENTS ROADMAP...
https://acc.dau.mil/UI/img/bo/plus.gifAppendix B -- SERVICE ACQUISITION...
https://acc.dau.mil/UI/img/bo/plus.gifAppendix C -- SERVICE ACQUISITION MALL...
https://acc.dau.mil/UI/img/bo/plus.gifAppendix D -- MARKET RESEARCH RESOURCES
https://acc.dau.mil/UI/img/bo/plus.gifAppendix E -- GLOSSARY
https://acc.dau.mil/UI/img/bo/plus.gifDoD Directive 5000.01
https://acc.dau.mil/UI/img/bo/minus.gifDoD Instruction 5000.02
https://acc.dau.mil/UI/img/bo/plus.gifTABLE OF CONTENTS
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 1 -- References
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 2 -- Procedures
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 3 -- Acquisition Category...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 4 -- Statutory and Regulatory...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 5 -- IT Considerations
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 6 -- Integrated T&E
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 7 -- Resource Estimation
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 8 -- Human Systems Integration...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 9 -- Acquisition of Services
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 10 -- Program Management
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 11 -- Management of Defense...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 12 -- Systems Engineering
https://acc.dau.mil/UI/img/bo/plus.gifRecent Policy and Guidance
https://acc.dau.mil/UI/img/bo/plus.gifCurrent JCIDS Manual and CJCSI 3170.01 I
https://acc.dau.mil/UI/img/bo/plus.gifDefense Acquisition Guidebook Key...
ACC Practice Center Version 3.2
  • Application Build 3.2.9
  • Database Version 3.2.9