Home
DAG Tutorial
Search
Available Downloads
Feedback
The DAG does not reflect the changes in the DoDI5000.02. Work is in progress to update the content and will be completed as soon as possible.
Help
Search for:
.
ACC Practice Center
>
AT&L Knowledge Management...
>
Welcome to the Defense...
>
Chapter 4 -- Systems...
>
4.3. Systems Engineering...
>
4.3.3. Decision Analysis...
4.3.3. Decision Analysis Process
Topic
Version History
Version
Created By
Creation Date
Change reasons
Current
Private
Apr 23, 2013
3
Private
Apr 16, 2013
2
Private
Apr 16, 2013
1
Private
Apr 4, 2013
Are you sure you want to delete this version?
Warning: This will cause the previous verison to become the current version
Yes
No
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
1.0. Overview
1.1. Integration of the DoD Decision...
1.2. Planning Programming Budgeting and...
1.3. Joint Capabilities Integration and...
1.4. Defense Acquisition System
Chapter 2 -- Program Strategies
Chapter 3 -- Affordability and...
Chapter 4 -- Systems Engineering
4.0. Overview
4.1. Introduction
4.2. Systems Engineering Activities in...
4.3. Systems Engineering Processes
4.3.2. Technical Planning Process
4.3.3. Decision Analysis Process
4.3.4. Technical Assessment Process
4.3.5. Requirements Management Process
4.3.6. Risk Management Process
4.3.7. Configuration Management Process
4.3.8. Technical Data Management Process
4.3.9. Interface Management Process
4.3.10. Stakeholder Requirements...
4.3.11. Requirements Analysis Process
4.3.12. Architecture Design Process
4.3.13. Implementation Process
4.3.14. Integration Process
4.3.15. Verification Process
4.3.16. Validation Process
4.3.17. Transition Process
4.3.18. Design Considerations
4.3.19. Tools Techniques and Lessons...
Chapter 5 -- Life-Cycle Logistics
Chapter 6 -- Human Systems Integration...
Chapter 7 -- Acquiring Information...
7.0. Overview
7.1. Introduction
7.2. DoD Information Enterprise
7.3. Interoperability and Supportability...
7.4. Sharing Data, Information, and...
7.5. Information Assurance (IA)
7.6. Electromagnetic Spectrum
7.7. Accessibility of Electronic and...
7.8. The Clinger-Cohen Act (CCA) --...
7.9. Post-Implementation Review (PIR)
7.10. Commercial Off-the-Shelf (COTS)...
7.11. Space Mission Architectures
Chapter 8 -- Intelligence Analysis...
8.0. Introduction
8.1. Threat Intelligence Support
8.2. Signature and other Intelligence...
8.3. Support to the Intelligence...
Chapter 9 -- Test and Evaluation (T&E)
Chapter 10 -- Decisions Assessments and...
10.0. Overview
10.1. Decision Points
10.2. Executive Review Forums
10.3. Integrated Product and Process...
10.4. Role of Exit Criteria
10.5. Role of Independent Assessments
10.5.3. Preliminary Design Review (PDR)...
10.6. Information Sharing and DoD...
10.7. Management Control
10.8. Program Plans
10.9. Acquisition Program Baseline (APB)
10.10. Periodic Reports
10.11. Major Automated Information...
10.12. Defense Acquisition Executive...
10.13. Acquisition Visibility
10.14. Special Interest Programs
10.15. Relationship of Affordability and...
10.16. Acquisition Program Transition...
Chapter 11 -- Program Management...
Chapter 12 - Defense Business System...
Chapter 13 -- Program Protection
Chapter 14 -- Acquisition of Services
DoD Directive 5000.01
DoD Instruction 5000.02
TABLE OF CONTENTS
Enclosure 1 -- References
Enclosure 2 -- Procedures
Enclosure 3 -- Acquisition Category...
Enclosure 4 -- Statutory and Regulatory...
Enclosure 5 -- IT Considerations
Enclosure 6 -- Integrated T&E
Enclosure 7 -- Resource Estimation
Enclosure 8 -- Human Systems Integration...
Enclosure 9 -- Acquisition of Services
Enclosure 10 -- Program Management
Enclosure 11 -- Management of Defense...
Enclosure 12 -- Systems Engineering
Recent Policy and Guidance
Download the Defense Acquisition...
Weapon Systems Acquisition Reform Act of...
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All