13.16. Program Protection Plan (PPP) Classification Guidance
Topic
JavaScript is currently disabled. Some advanced features may not be supported.
Please wait while we load section 13.16. Program Protection Plan (PPP) Classification Guidance
List of All Contributions at This Location
Rss Link
Show All
|
Filtered By
No items found.
Popular Tags
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
Chapter 2 -- Program Strategies
Chapter 3 -- Affordability and...
3.0. Overview
3.1. Life-Cycle Costs/Total Ownership...
3.2. Affordability
3.3. Analysis of Alternatives
3.4. Cost Estimation for Major Defense...
3.5. Manpower Estimates
3.6. Major Automated Information Systems...
3.7. Principles for Life-Cycle Cost...
Chapter 4 -- Systems Engineering
4.0. Overview
4.1. Introduction
4.2. Systems Engineering Activities in...
4.3. Systems Engineering Processes
Chapter 5 -- Life-Cycle Logistics
Chapter 6 -- Human Systems Integration...
Chapter 7 -- Acquiring Information...
Chapter 8 -- Intelligence Analysis...
Chapter 9 -- Test and Evaluation (T&E)
Chapter 10 -- Decisions Assessments and...
Chapter 11 -- Program Management...
Chapter 12 - Defense Business System...
12.0 Overview
12.0.2 BCL Introduction
12.1 Business Capability Definition...
12.2 Investment Management (IM) Phase
12.3 Execution
12.4 DBS-specific Criteria
12.5 Tools and Methods
Chapter 13 -- Program Protection
13.0 Overview
13.1 The Program Protection Process
13.2 The Program Protection Plan (PPP)
13.3 Critical Program Information (CPI)...
13.4. Intelligence and...
13.5. Vulnerability Assessment
13.6. Risk Assessment
13.7. Countermeasures
13.8. Horizontal Protection
13.9. Foreign Involvement
13.10. Managing and Implementing PPPs
13.11. Compromises
13.12. Costs
13.13. Contracting
13.14. Detailed System Security...
13.15. Program Protection Plan (PPP)...
13.16. Program Protection Plan (PPP)...
Chapter 14 -- Acquisition of Services
DoD Directive 5000.01
ENCLOSURE 1 ADDITIONAL POLICY
DoD Instruction 5000.02
Recent Policy and Guidance
Download the Defense Acquisition...
Weapon Systems Acquisition Reform Act of...
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All
ACC Practice Center Version
3.2
Application Build 3.2.9
Database Version 3.2.9