Home
DAG Tutorial
Search
Available Downloads
Feedback
The DAG does not reflect the changes in the DoDI5000.02. Work is in progress to update the content and will be completed as soon as possible.
Help
Search for:
.
ACC Practice Center
>
AT&L Knowledge Management...
>
Welcome to the Defense...
>
Chapter 7 -- Acquiring...
>
7.3. Interoperability and...
7.3. Interoperability and Supportability of Information Technology and National Security Systems
Topic
Version History
Version
Created By
Creation Date
Change reasons
Current
Private
Sep 10, 2013
2
Private
Jul 25, 2012
1
Private
Jul 5, 2012
Are you sure you want to delete this version?
Warning: This will cause the previous verison to become the current version
Yes
No
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
1.0. Overview
1.1. Integration of the DoD Decision...
1.2. Planning Programming Budgeting and...
1.3. Joint Capabilities Integration and...
1.4. Defense Acquisition System
Chapter 2 -- Program Strategies
2.0 Overview
2.1. Program Strategies—General
2.2. Program Strategy Document...
2.3. Program Strategy Relationship to...
2.4. Relationship to Request for...
2.5. Program Strategy Classification...
2.6. Program Strategy Document Approval...
2.7. Acquisition Strategy versus...
2.8. Technology Development...
Chapter 3 -- Affordability and...
3.0. Overview
3.1. Life-Cycle Costs/Total Ownership...
3.2. Affordability
3.3. Analysis of Alternatives
3.4. Cost Estimation for Major Defense...
3.5. Manpower Estimates
3.6. Major Automated Information Systems...
3.7. Principles for Life-Cycle Cost...
3.7.4. Further Information and Training
Chapter 4 -- Systems Engineering
4.0. Overview
4.1. Introduction
4.1.1. Systems Engineering Policy and...
4.1.2. Systems Engineering Plan
4.1.3. Systems Level Considerations
4.1.4. Engineering Resources
4.1.5. Certifications
4.1.6. Systems Engineering Role in...
4.2. Systems Engineering Activities in...
4.3. Systems Engineering Processes
4.3.2. Technical Planning Process
4.3.3. Decision Analysis Process
4.3.4. Technical Assessment Process
4.3.5. Requirements Management Process
4.3.6. Risk Management Process
4.3.7. Configuration Management Process
4.3.8. Technical Data Management Process
4.3.9. Interface Management Process
4.3.10. Stakeholder Requirements...
4.3.11. Requirements Analysis Process
4.3.12. Architecture Design Process
4.3.13. Implementation Process
4.3.14. Integration Process
4.3.15. Verification Process
4.3.16. Validation Process
4.3.17. Transition Process
4.3.18. Design Considerations
4.3.19. Tools Techniques and Lessons...
Chapter 5 -- Life-Cycle Logistics
Chapter 6 -- Human Systems Integration...
6.0. Overview
6.1. Total System Approach
6.2 HSI - Integration Focus
6.3. Human Systems Integration Domains
6.3.4. Human Factors Engineering (HFE)
6.4. Human Systems Integration (HSI)...
6.5. Manpower Estimates
6.6. Additional References
Chapter 7 -- Acquiring Information...
7.0. Overview
7.1. Introduction
7.2. DoD Information Enterprise
7.3. Interoperability and Supportability...
7.3.2. Mandatory Policies
7.3.3. Interoperability and...
7.3.4. Net-Ready Key Performance...
7.3.5. Net-Ready Key Performance...
7.3.6. Information Support Plan (ISP)...
7.3.6.2. Information Support Plan (ISP)...
7.3.6.3. Estimated Information Support...
7.3.6.6. Points of Contacts
7.3.6.7. Information Support Plan (ISP)...
7.3.6.8. Tailored Information Support...
7.3.6.9. Information Support Plan (ISP)...
7.4. Sharing Data, Information, and...
7.5. Information Assurance (IA)
7.6. Electromagnetic Spectrum
7.7. Accessibility of Electronic and...
7.8. The Clinger-Cohen Act (CCA) --...
7.9. Post-Implementation Review (PIR)
7.10. Commercial Off-the-Shelf (COTS)...
7.11. Space Mission Architectures
Chapter 8 -- Intelligence Analysis...
Chapter 9 -- Test and Evaluation (T&E)
9.0 Overview
9.1 OSD T&E Organization
9.2 Service-Level T&E Management
9.3 Test and Evaluation
9.4 Integrated Test and Evaluation
9.5 Test and Evaluation Planning
9.6 T&E Reporting
9.7 Special Topics
9.8. Best Practices
9.9. Prioritizing Use of Government Test...
Chapter 10 -- Decisions Assessments and...
10.0. Overview
10.1. Decision Points
10.2. Executive Review Forums
10.3. Integrated Product and Process...
10.4. Role of Exit Criteria
10.5. Role of Independent Assessments
10.5.3. Preliminary Design Review (PDR)...
10.6. Information Sharing and DoD...
10.7. Management Control
10.8. Program Plans
10.9. Acquisition Program Baseline (APB)
10.10. Periodic Reports
10.11. Major Automated Information...
10.12. Defense Acquisition Executive...
10.13. Acquisition Visibility
10.14. Special Interest Programs
10.15. Relationship of Affordability and...
10.16. Acquisition Program Transition...
Chapter 11 -- Program Management...
11.0. Overview
11.1. Joint Programs
11.2. International Programs
11.3. Integrated Program Management
11.4. Knowledge-Based Acquisition
11.5. Technical Representatives at...
11.6. Contractor Councils
11.7 Property
11.8. Modeling and Simulation (M&S)...
Chapter 12 - Defense Business System...
12.0 Overview
12.1 Business Capability Definition...
12.2 Investment Management (IM) Phase
12.3 Execution
12.4 DBS-specific Criteria
12.5 Tools and Methods
Chapter 13 -- Program Protection
13.0 Overview
13.1 The Program Protection Process
13.2 The Program Protection Plan (PPP)
13.3 Critical Program Information (CPI)...
13.4. Intelligence and...
13.5. Vulnerability Assessment
13.6. Risk Assessment
13.7. Countermeasures
13.8. Horizontal Protection
13.9. Foreign Involvement
13.10. Managing and Implementing PPPs
13.11. Compromises
13.12. Costs
13.13. Contracting
13.14. Detailed System Security...
13.15. Program Protection Plan (PPP)...
13.16. Program Protection Plan (PPP)...
Chapter 14 -- Acquisition of Services
DoD Directive 5000.01
ENCLOSURE 1 ADDITIONAL POLICY
DoD Instruction 5000.02
TABLE OF CONTENTS
Enclosure 1 -- References
Enclosure 2 -- Procedures
Enclosure 3 -- Acquisition Category...
Enclosure 4 -- Statutory and Regulatory...
Enclosure 5 -- IT Considerations
Enclosure 6 -- Integrated T&E
Enclosure 7 -- Resource Estimation
Enclosure 8 -- Human Systems Integration...
Enclosure 9 -- Acquisition of Services
Enclosure 10 -- Program Management
Enclosure 11 -- Management of Defense...
Enclosure 12 -- Systems Engineering
Recent Policy and Guidance
Download the Defense Acquisition...
Weapon Systems Acquisition Reform Act of...
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All