7/20/2016
|
18,957
|
Architecture Data
|
DoD Architecture Framework (DoDAF) -
The Department of Defense Architecture Framework (DoDAF) is the overarching, comprehensive framework and conceptual mode...
|
|
1/20/2016
|
35,212
|
Authorized Unpriced Work (AUW)
|
Authorized Work (AW): The sum of the effort which has been definitized and is on contract, plus that effort for which definitized contract costs have not been a...
|
|
8/5/2016
|
23,848
|
Baseline Execution Index (BEI)
|
The Baseline Execution Index (BEI) metric is used to indicate the efficiency with which tasks have been accomplished when measured against the baseline. (Source...
|
|
8/3/2016
|
34,238
|
Best Value Product Support Arrangements
|
“Best value” means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit in response to the require...
|
|
6/23/2016
|
1,383
|
Budget at Completion (BAC)
|
The Budget at Completion (BAC) is the sum of all budgets established for the contract through any given WBS/OBS level. When associated with a level it becomes c...
|
|
8/5/2016
|
26,976
|
Budgeted Cost for Work Performed (BCWP)
|
The Budgeted Cost for Work Performed (BCWP) is the value of completed work expressed as the value of the performance budget assigned to that work. The sum of th...
|
|
8/5/2016
|
29,286
|
Budgeted Cost for Work Scheduled (BCWS)
|
The Budgeted Cost of Work Scheduled (BCWS) is the sum of the budgets for all work packages, planning packages, etc., scheduled to be accomplished (including in-...
|
|
8/5/2016
|
31,755
|
Capabilities-Based Assessment (CBA)
|
The CBA is an analytical method the DoD uses to identify needed capabilities and associated capability gaps that are eventually transformed into requirements. ...
|
|
7/20/2016
|
68,849
|
Capability Development Document (CDD)
|
A document that captures the information necessary to develop a proposed program(s), normally using an evolutionary acquisition (EA) strategy. The CDD outlines ...
|
|
5/10/2016
|
117,549
|
Capability Production Document (CPD)
|
A document that addresses the production elements specific to a single increment of an acquisition program. The CPD must be validated and approved before a Mile...
|
|
5/10/2016
|
86,542
|
Cataloging
|
The process of accounting for items and arranging systematically with descriptive details to include naming, describing, classifying and assigning a unique comb...
|
|
5/27/2016
|
1,759
|
|
5/10/2016
|
50,322
|
Component Cost Estimate (CCE)
|
A Component Cost Estimate, or Component Cost Analysis, is a life-cycle cost estimate prepared by the Component Cost Agency in support of an acquisition mileston...
|
|
5/31/2016
|
12,145
|
Component Cost Position (CCP)
|
The Component Cost Position (CCP) is the DoD Component’s official life-cycle cost estimate for a program. Representatives from the Program Office and the Ser...
|
|
7/7/2016
|
9,063
|
Concept of Operations (CONOPS)
|
A verbal or graphic statement that clearly and concisely expresses what the Joint Force Commander (JFC) intends to accomplish and how it will be done using avai...
|
|
7/20/2016
|
95,787
|
Configuration Management
|
"Configuration management is defined as a process for establishing and maintaining consistency of a product's performance, functional and physical attributes wi...
|
|
5/27/2016
|
14,633
|
|
5/31/2016
|
1,825
|
Contract Budget Base (CBB)
|
The Contract Budget Base (CBB) is the sum of the Negotiated Contract Cost (NCC) plus the estimated cost of Authorized Unpriced Work (AUW). This represents the t...
|
|
8/5/2016
|
24,348
|
Contract Funds Status Report (CFSR)
|
The CFSR, or DD Form 1586, is designed to supply funding data about defense contracts to Program Managers for: (a) updating and forecasting contract funds requi...
|
|
9/29/2016
|
68
|
Contract Performance Report (CPR)
|
The Contract Performance Report (CPR) is a contractually required report, prepared by the contractor, containing performance information derived from the contra...
|
|
8/4/2016
|
32,096
|
Contractor Logistics Support (CLS)
|
Contractor Logistics Support (CLS) Contracted weapon system sustainment that occurs over the life of the weapon system. Can also be defined as the performanc...
|
|
1/13/2016
|
1,420
|
Control Account (CA)
|
A control account (CA) is the intersection of one Work Breakdown Structure (WBS) element and one Organiztional Breakdown Structure (OBS) element representing a ...
|
|
8/5/2016
|
30,849
|
Corrosion Prevention and Control
|
Corrosion may be simply defined as the gradual deterioration of a material or its properties due to a reaction of that material with its chemical environment....
|
|
5/27/2016
|
552
|
Cost Accounting Standards (CAS)
|
The cost accounting standards (CAS) consist of nineteen standards promulgated by the Cost Accounting Standards Board (CASB) designed to ensure uniformity and co...
|
|
9/29/2016
|
52
|
Cost Performance Index (CPI)
|
The Cost Performance Index (CPI) is computed by dividing the Budgeted Cost for Work Performed (BCWP) by the corresponding Actual Cost of Work Performed (ACWP). ...
|
|
8/5/2016
|
30,504
|
Cost Variance (CV)
|
Cost Variance (CV) is a metric for showing cost performance derived from earned value data. It is the
mathematical difference between Budgeted Cost for Work P...
|
|
8/5/2016
|
19,834
|
Counterfeit Parts
|
“Counterfeit electronic part” means an unlawful or unauthorized reproduction, substitution, or alteration that has been knowingly mismarked, misidentified, or o...
|
|
5/2/2016
|
6,320
|
|
8/5/2016
|
25,032
|
|
6/14/2016
|
31,774
|
Data Rights
|
Data Rights is a shorthand way to refer to the Government's license rights in two major categories of valuable intellectual property:
Technical Data includ...
|
|
7/14/2016
|
21,289
|
Defense Exportability Features Initiative
|
The Defense Exportability Features (DEF) Initiatives, which include the Defense Exportability Features (DEF) Pilot Program was established in the fiscal year 20...
|
|
8/30/2016
|
408
|
|
11/30/2015
|
1,461
|
|
2/22/2016
|
754
|
Depot Level Maintenance
|
According to 10 USC 2460, "depot-level maintenance and repair" means material maintenance or repair requiring the overhaul, upgrading, or rebuilding of parts, a...
|
|
1/13/2016
|
6,810
|
Developmental Test and Evaluation (DT&E)
|
Developmental Test & Evaluation is the type of testing which verifies that the system under test meets all technical requirements.
Any testing used to assis...
|
|
6/8/2016
|
18,334
|
|
5/3/2016
|
20,677
|
Direct Costs
|
A direct cost is any cost that can be identified specifically with or traced to a particular final cost objective. According to FAR Part 31.001, a cost objecti...
|
|
9/29/2016
|
37
|
|
9/14/2016
|
34,627
|
|
6/8/2016
|
10,715
|
DoD Strategic Guidance
|
Strategic Direction - The common thread that integrates and synchronizes the activities of the Joint Staff, combatant commands, Services, and combat support age...
|
|
7/20/2016
|
47,631
|
DOTmLPF-P Analysis
|
DOTmLPF-P is the DoD acronym that pertains to the eight possible non-materiel elements involved in solving warfighting capability gaps. These solutions may r...
|
|
5/10/2016
|
119,591
|
DOTmLPF-P Change Recommendation (DCR)
|
A Joint Doctrine, Organization, Training, materiel, Leadership and education, Personnel, Facilities - Policy (DOTmLPF-P) Change Recommendation (DCR) is a docume...
|
|
7/20/2016
|
81,061
|
Estimate at Completion (EAC)
|
The Estimate at Completion (EAC) is The current estimated total cost for program authorized work. It equals Actual Cost of Work Performed (ACWP) plus the estima...
|
|
8/5/2016
|
54,086
|
Exit Criteria
|
Program-specific accomplishments that must be satisfactorily demonstrated before a program can progress further in the current acquisition phase or transition t...
|
|
4/1/2016
|
36,236
|
|
11/30/2015
|
3,907
|
|
3/16/2016
|
11,992
|
|
7/12/2016
|
212
|
|
3/3/2016
|
34,204
|
|
3/14/2016
|
917
|
Freedom of Information Act
|
The Freedom of Information Act (FOIA), 5 U.S.C. 552 was signed by President Johnson on July 4th, 1966, to take effect July 5th, 1967. This act applies to all F...
|
|
6/2/2016
|
152
|
Full Operational Capability (FOC)
|
In general, attained when all units and/or organizations in the force structure scheduled to receive a system 1) have received it and 2) have the ability to emp...
|
|
5/10/2016
|
41,463
|
Full-Rate Production Systems
|
Full rate production (FRP) is a decision, following the completion of operational testing of representative initial production products, to scale up production ...
|
|
1/14/2016
|
22,821
|
Functional Baseline
|
Mainly describe by the system performance specification. Designate the system-level performance requirements. It includes all functional and interface character...
|
|
1/8/2016
|
3,308
|
Functional Capabilities Board (FCB)
|
The Functional Capabilities Board(FCB) is a permanently-established DoD body that is responsible for the organization, analysis, and prioritization of joint war...
|
|
7/20/2016
|
29,979
|
Funding Product Support Strategies
|
Product Support Strategy (PSS) - The business and technical approach to design, acquire, and field the product support package to execute the sustainment strate...
|
|
9/13/2016
|
139
|
|
7/8/2016
|
506
|
General and Administrative (G&A) Expense
|
A G&A expense is any management, financial, and other expense which is incurred by or allocated to a business unit and which is for the general management and a...
|
|
9/29/2016
|
34
|
|
2/11/2016
|
1,502
|
Independent Cost Estimate (ICE)
|
A Life Cycle Cost Estimate (LCCE) for Acquisition Category (ACAT) I programs prepared by an office or other entity that is not under the supervision, direction,...
|
|
7/7/2016
|
32,011
|
Independent Logistics Assessment (ILA)
|
An Independent Logistics Assessment (ILA), also referred to as a Logistics Assessment (LA), is an analysis of a program's supportability planning. Preferably, i...
|
|
3/11/2016
|
7,691
|
Independent Research & Development (IR&D)
|
For nearly 80 years, firms have been allowed to recover Independent Research & Development (IR&D) costs as long as these efforts are of potential interest to th...
|
|
6/9/2016
|
3,762
|
Indirect Contractor Costs
|
An indirect cost is any cost not directly identifiable with a single, final cost objective, but identified with two or more final cost objectives or an intermed...
|
|
9/29/2016
|
36
|
Initial Capabilities Document (ICD)
|
The Initial Capabilities Document (ICD) documents the DoD need for a materiel approach (or an approach that combines materiel and non-materiel solution sets) to...
|
|
7/20/2016
|
123,077
|
|
5/10/2016
|
45,234
|
Integrated Baseline Review (IBR)
|
According to the Defense Acquisition Guidebook, Chapter 11, Section 11.3.1.3, an IBR is a joint assessment of the Performance Measurement Baseline (PMB) conduct...
|
|
9/15/2016
|
66,584
|
|
8/2/2016
|
14,004
|
|
7/28/2016
|
5,996
|
|
8/2/2016
|
7,759
|
|
6/7/2016
|
8,188
|
|
6/3/2016
|
5,190
|
|
6/22/2016
|
59,121
|
|
8/5/2016
|
7,633
|
|
7/21/2016
|
14,991
|
Interim Contractor Support (ICS)
|
Interim Contractor Support (ICS) Temporary contractor support of in lieu of organic capability associated with new weapon system/sub-system acquisition or mo...
|
|
1/13/2016
|
916
|
|
1/20/2016
|
3,064
|
Item Unique Identification (IUID)
|
Item Unique Identification (IUID) is a DoD program to identify and track government-furnished property (GFP) through the use of Unique Item Identification (UII)...
|
|
7/10/2016
|
16,659
|
|
1/20/2016
|
121,201
|
|
1/20/2016
|
25,165
|
Joint Staffing Designator (JSD)
|
The Joint Staffing Designator (JSD) is a designation the Joint Staff Gatekeeper assignes to DoD capability requirement documents such as the Initial Capabiliti...
|
|
7/20/2016
|
19,113
|
Key Performance Parameters (KPPs)
|
Performance attributes of a system considered critical or essential to the development of an effective military capability. Failure of a system to meet a vali...
|
|
5/10/2016
|
94,209
|
Key Systems Attribute (KSA)
|
Key System Attributes (KSAs) or characteristics considered essential to achieving a balanced solution/approach to a system, but not critical enough to be design...
|
|
1/5/2016
|
15,721
|
Latest Revised Estimate (LRE)
|
Latest Revised Estimate (LRE) is the contractor’s Estimate at Completion (EAC).
(Source: Defense Acquisition University (DAU) Gold Card )
|
|
8/5/2016
|
19,132
|
Lead-Free Electronics
|
The term 'lead free', when applied to solder or electronics usually implies a lead content that meets specifications of the European Union's Restriction of Haza...
|
|
5/3/2016
|
5,505
|
Life Cycle Cost (LCC)
|
The cost to the government of acquisition and sustainment of a system over its useful life. It includes the cost of development, acquisition, operations, and su...
|
|
7/7/2016
|
46,891
|
Life Cycle Management (LCM)
|
Also referred to as Total Life Cycle System Management (TLCSM), "life cycle management is the implementation, management, and oversight by the program manager o...
|
|
3/11/2016
|
39,480
|
Life Cycle Sustainment Outcome Metrics
|
According to the Joint Capabilities Integration & Development System (JCIDS) Manual, "sustainment as a key component of performance. Including sustainment plann...
|
|
3/14/2016
|
18,596
|
Life Cycle Sustainment Plan (LCSP)
|
The Life Cycle Sustainment Plan (LCSP) documents the Program Manager and Product Support Manager's plan for formulating, implementing and executing the sustainm...
|
|
5/3/2016
|
50,759
|
Logistics Demonstrations (LOG Demo)
|
A part of developmental test and evaluation (DT&E) used to evaluate the system under test's interface with the Integrated Product Support (IPS) Elements (produc...
|
|
4/4/2016
|
2,317
|
Logistics Modeling and Simulation (M&S)
|
The Department of Defense (DoD) defines a model as “a physical, mathematical or otherwise logical representation of a system, entity, pheno menon or process”, w...
|
|
3/16/2016
|
2,258
|
|
1/20/2016
|
39,614
|
Management Reserve (MR)
|
Management Reserve (MR) is An amount of the total budget withheld for management control purposes for
future considerations to handle execution risks. It is n...
|
|
8/5/2016
|
30,728
|
Manpower Estimates
|
Manpower estimates report the total number of personnel required to operate, maintain, and support the program upon full operational deployment, including progr...
|
|
2/22/2016
|
2,526
|
Materiel Availability
|
Materiel Availability is a measure of the percentage of the total inventory of a system operationally capable (ready for tasking) of performing an assigned miss...
|
|
4/4/2016
|
18,457
|
Mean Downtime (MDT)
|
Mean Downtime (MDT) is the average Total Downtime required to restore an asset to its full operational capabilities. MDT includes the time from reporting of an ...
|
|
5/11/2016
|
3,271
|
Milestone Decision Authority (MDA)
|
The Milestone Decision Authority is the designated individual with overall responsibility for a program. The MDA shall have the authority to approve entry of an...
|
|
4/1/2016
|
37,376
|
Modification Management
|
The term modification is defined in a number of ways by various DoD organizations. A few of those definitions include:
A configuration change to a produced...
|
|
1/13/2016
|
8,390
|
|
9/12/2016
|
146
|
|
1/20/2016
|
11,688
|
Negotiated Contract Cost (NCC)
|
Negotiated Contract Cost (NCC) is the cost negotiated in a cost-plus-fixed-fee contract or the negotiated contract target cost in either a fixed-price-incentive...
|
|
8/5/2016
|
19,198
|
Net-Ready Key Performance Parameter (KPP)
|
Summary. Net-ready attributes determine specific criteria for interoperability, and operationally effective end-to-end information exchanges which are traceable...
|
|
1/5/2016
|
99,957
|
Opportunity Management
|
Opportunities are potential future benefits to the program's cost, schedule, and/or performance baseline, usually achieved through reallocation of resources.
...
|
|
8/24/2016
|
309
|
Over Target Baseline (OTB)
|
An Over Target Baseline (OTB) is a new baseline for management when the original objectives cannot be met andnew goals are needed for management purposes. An o...
|
|
8/5/2016
|
24,007
|
Overhead Costs
|
Overhead costs are indirect costs which supports a production function. Examples would include material overhead (inventorying, forklifts, warehousing and stora...
|
|
9/29/2016
|
34
|
|
7/6/2016
|
1,109
|
|
6/7/2016
|
6,390
|
|
5/4/2016
|
26,913
|
|
6/3/2016
|
26,743
|
|
3/30/2016
|
1,927
|
|
6/7/2016
|
1,438
|
|
3/29/2016
|
50,024
|
Performance Measurement Baseline (PMB)
|
The Performance Measurement Baseline (PMB) is a time-phased resourced plan against which the accomplishment of authorized work can be measured.
Source: DoD E...
|
|
8/5/2016
|
58,088
|
Performance-Based Payments
|
Performance-based payments (PBPs) are a customary method of contract financing that may be available under fixed-price contracts, except for contracts awarded u...
|
|
9/14/2016
|
16,863
|
Planning Package (PP)
|
A Planning Package (PP) is a logical aggregation of future work within a control account that cannot yet be
planned in detail at the work package or task leve...
|
|
8/5/2016
|
17,577
|
Post IOC Supportability
|
The USD(AT&L) Memorandum, Total Life Cycle Systems Management and Performance Based Logistics issued March 7, 2003, provided the DoD Template for Application of...
|
|
8/2/2016
|
25,266
|
Post Production Software Support (PPSS)
|
Post Production Software Support (PPSS) is a key software support concept that includes the activities necessary to ensure that Systems Engineering and sustainm...
|
|
8/2/2016
|
32,156
|
Post-Deployment Review
|
Post Deployment Review (PDR). DoD policy as established by the March 7, 2003 USD(AT&L) Memorandum, Total Life Cycle Systems Management and Performance Based Log...
|
|
8/4/2016
|
25,398
|
|
8/12/2016
|
5,841
|
Product Baseline
|
Mainly describe by a set of item detail specifications and the associated technical data package (TDPs) of the lower level configuration items (CIs). Designate...
|
|
1/8/2016
|
13,376
|
|
2/1/2016
|
4,799
|
Product Support Analysis (MIL-HDBK-502A)
|
MIL-HDBK-502A Product Support Analysis was issued by the Department of Defense in March 2013, and supersedes the outdated May 30, 1997 MIL-HDBK-502 Acquisition ...
|
|
7/28/2016
|
7,892
|
Product Support Arrangements (PSA)
|
Product support arrangement. The term "product support arrangement" means a contract, task order, or any type of other contractual arrangement, or any type of a...
|
|
2/24/2016
|
27,577
|
|
3/29/2016
|
42,071
|
Product Support Business Model (PSBM)
|
According to the DoD Product Support Manager (PSM) Guidebook, "the PSBM defines the hierarchical framework in which the planning, development, implementation, m...
|
|
3/2/2016
|
4,779
|
|
5/3/2016
|
36,529
|
Product Support Manager (PSM)
|
According to para 5.1.3.2 of the Defense Acquisition Guidebook (DAG) entitled Product Support Manager (PSM), “the day-to-day oversight and management of the pro...
|
|
3/30/2016
|
15,368
|
Product Support Package
|
The product support package includes the array of product support functions required to deploy and maintain the readiness and operational capability of major we...
|
|
5/9/2016
|
2,240
|
Program Office Estimate (POE)
|
A detailed estimate of acquisition and ownership costs normally required for high-level decisions. The estimate is performed early in the program and serves as ...
|
|
7/7/2016
|
12,634
|
Provisioning
|
Provisioning is the process of determining and acquiring the range and quantity (depth) of spares and repair parts, and support and test equipment required to o...
|
|
8/2/2016
|
574
|
Quality
|
Dr. W. Edwards Deming defines quality as "meeting or exceeding customer expectations." He is credited with reviving the Japanese economy after World War II usin...
|
|
1/14/2016
|
4,740
|
Readiness-Based Sparing (RBS)
|
Readiness-Based Sparing (RBS) is the practice of using advanced analytics to set spares levels and locations to maximize system readiness. Readiness-Based Spari...
|
|
4/8/2016
|
1,283
|
Risk Assessment
|
• Risks are future events or conditions that may have a negative effect on achieving program objectives for cost, schedule, and performance. Risks are defined b...
|
|
8/24/2016
|
26,565
|
Schedule Performance Index (SPI)
|
The Schedule Performance Index (SPI) is computed by dividing the Budget Cost for Work Performed (BCWP) by the Budgeted Cost for Work Scheduled (BCWS). This metr...
|
|
8/4/2016
|
30,529
|
Schedule Variance (SV)
|
Schedule Variance (SV) is a metric for schedule performance on a program. It is the mathematical difference between Budgeted Cost for Work Performed (BCWP) and ...
|
|
8/5/2016
|
26,399
|
Service/JROC Approval and Validation
|
Approval - The formal or official sanction of the required capability described in the capability documentation. Approval also certifies that the documentation ...
|
|
1/20/2016
|
42,346
|
Services Acquisition Workshop (SAW)
|
Definition (DoDI 5000.74): Services Acquisition Workshop (SAW). A facilitated workshop built around a specific acquisition and its multi-functional integrated...
|
|
7/22/2016
|
314
|
|
7/29/2016
|
393
|
Space Systems Acquisition Policy
|
The Space Systems Acquisition Model emphasizes the decision needs for “high-tech” small quantity National Security Space (NSS) programs. DoD Space Systems are ...
|
|
5/31/2016
|
26,022
|
Specifications and Standards
|
SPECIFICATIONS
A Specification (often informally referred to as a spec) refers to an explicit set of requirements to be satisfied by a material, design, produ...
|
|
11/3/2015
|
2,099
|
Suitability
|
Operational suitability is the degree to which a system can be satisfactorily placed in field use, with consideration given to reliability, availability, compat...
|
|
6/30/2016
|
217
|
Summary Level Planning Package (SLPP)
|
Summary Level Planning Package (SLPP) is an aggregation of work for far-term efforts that are not able to be identified at the control account level, but can be...
|
|
8/5/2016
|
18,549
|
Supply Classes
|
Term used by the US Department of Defense to categorize supplies and material in order to facilitate efficient supply chain management. Broken out into 10 class...
|
|
8/1/2016
|
1,936
|
Sustainability
|
‘Sustainability’ and ‘sustainable’ mean to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling...
|
|
3/23/2016
|
740
|
Sustainment Maturity Levels (SML)
|
According to the DoD Product Support Manager’s (PSM) Guidebook, Sustainment Maturity Levels (SML) are a life cycle sustainment management tool used to assess th...
|
|
2/19/2016
|
839
|
System Fielding and Site Activation
|
USAF
Bed-down - The USAF (AFI 10-503 Base Unit Beddown Program) defines bed-down as establishing a unit, mission, activity, or personnel on real property for ...
|
|
8/2/2016
|
328
|
|
2/23/2016
|
35,396
|
System Verification Review (SVR)
|
A formal review conducted to verify that the performance of the actual configuration items meet with the item performance specifications and documented in the a...
|
|
1/8/2016
|
26,920
|
Systems Engineering Process
|
The DoD systems engineering process is a collection of technical management processes and technical processes applied through the acquisition lifecycle. The te...
|
|
1/8/2016
|
77,831
|
Technical Baselines
|
Technical baselines include functional baseline, allocated baseline and product baseline. Each of the technical baselines is a reference from which to measure p...
|
|
1/8/2016
|
3,274
|
Technical Data Package (TDP)
|
A technical data package (TDP) is a description of an item adequate for supporting an acquisition, production, engineering, and logistics support (e.g. Engineer...
|
|
6/7/2016
|
813
|
Technical Performance Measurement (TPM)
|
Technical Performance Measurement (TPM) involves a technique of predicting the future value of a key technical performance parameter of the higher-level end pro...
|
|
1/8/2016
|
49,919
|
Technology Maturation and Risk Reduction
|
The second phase of the Defense Acquisition Management System as defined and established by DoDI 5000.02. It is initiated by a successful Milestone A decision. ...
|
|
12/8/2015
|
39,254
|
Technology Readiness Assessment (TRA)
|
A Technology Readiness Assessment (TRA) is a systematic, metrics-based process that assesses the maturity of, and risk associated with, critical technologies to...
|
|
6/9/2016
|
36,291
|
To Complete Performance Index (TCPI)
|
The To Complete Performance Index (TCPI) is an Earned Value Management (EVM) metric computed by dividing the value of the work remaining by the value of the tar...
|
|
8/4/2016
|
44,192
|
Total Allocated Budget (TAB)
|
The Total Allocated Budget (TAB) is the sum of all budgets allocated to the contract. TAB consists of the
Performance Measurement Baseline (PMB) and all Manag...
|
|
8/5/2016
|
21,674
|
Total Package Fielding
|
Total Package Fielding (TPF), which is the Army’s standard materiel fielding process for new or modified materiel systems, provides a consolidated support packa...
|
|
1/12/2016
|
1,019
|
Undistributed Budget (UB)
|
Undistributed Budget (UB) is a temporary holding account for budget associated with specific work scope or contract changes that have not been distributed to a ...
|
|
8/8/2016
|
22,846
|
|
9/14/2016
|
230
|
|
2/8/2016
|
20,077
|
Variance at Completion (VAC)
|
Variance at Completion (VAC) is the difference between the Budget at Completion (BAC) and the Estimate at Completion (EAC) (VAC = BAC - EAC). It may be calculat...
|
|
8/8/2016
|
25,332
|
Work Breakdown Structure (WBS)
|
A product-oriented family tree composed of hardware, software, services, data, and facilities. The family tree results from systems engineering efforts during t...
|
|
1/8/2016
|
51,777
|
Work Package (WP)
|
A Work Package (WP) is a natural subdivision of Control Accounts (CA). A WP is simply a task/activity or grouping of work. A WP is simply a task/activity or gro...
|
|
8/8/2016
|
20,712
|