INFORMATION REQUIRED
|
SOURCE
|
WHEN REQUIRED
|
Acquisition Information Assurance Strategy (All IT-including NSS)
|
DoDI 8580.1 (Reference (ai))
This Instruction
|
MS A
MS B
MS C
Full-Rate Production DR (or Full Deployment DR)
|
Acquisition Strategy
|
This Instruction
|
Program Initiation for Ships
MS B
MS C
Full-Rate Production DR (or Full Deployment DR)
|
ADM
|
This Instruction
|
Program Initiation for Ships
MS A
MS B
MS C
Each Review
|
Affordability Assessment
|
This Instruction
|
MS B
MS C
|
AoA
|
This Instruction
|
MS A
MS B (updated as necessary)
MS C (updated as necessary)
Full Deployment DR (for AIS)
|
AoA Study Guidance
|
This Instruction
|
Materiel Development Decision (updated as necessary)
|
AoA Study Plan
|
This Instruction
|
Immediately following the Materiel Development Decision consistent with MDA Direction (updated as necessary)
|
APB
|
This Instruction
|
Program Initiation for Ships
MS B
MS C (updated, as necessary)
Full-Rate Production DR (or Full Deployment DR)
|
CDD
|
Reference (h)
|
Program Initiation for Ships
MS B
|
CIO Confirmation of CCA Compliance (See Enclosure 5)
|
This Instruction
|
MS A
Program Initiation for Ships
MS B
MS C (if Program Initiation or if equivalent to Full Deployment DR)
Full-Rate Production (or Full Deployment) DR
|
Component LFT&E Report
(OSD LFT&E oversight programs only)
|
This Instruction
|
Completion of Live Fire Test and Evaluation
|
Cost Analysis Requirements Description (CARD)
(MDAPs and MAIS acquisition programs only)
(CARDs shall be prepared according to the procedures specified in Enclosure 7 of this Instruction)
|
This Instruction
|
For MDAPs
- Program Initiation for Ships
- MS B
- MS C
- Full-Rate Production DR
For MAIS
- Any time an Economic Analysis is required-either by statute or by the MDA
|
Corrosion Prevention Control Plan (part of Acquisition Strategy) (ACAT I only)
|
DoDI 5000.67 (Reference (aj))
This Instruction
|
MS B
MS C
|
CPD
|
Reference (h)
|
MS C
|
Defense Acquisition Executive Summary (MDAPs and MAIS only)
|
This Instruction
|
Quarterly
Upon POM or BES submission
Upon unit cost breach
|
DoD Component Cost Estimate (mandatory for MAIS; as required by CAE for MDAP)
|
This Instruction
|
MS A
For MDAPs
- Program Initiation for Ships
- MS B
- Full-Rate Production DR
For MAIS
- Any time an Economic Analysis is required-either by statute or by the MDA
|
Exit Criteria
|
This Instruction
|
Program Initiation for Ships
MS A
MS B
MS C
Each Review
|
ICD
|
Reference (h)
|
Materiel Development Decision
MS A
MS B
MS C (if Program Initiation)
|
Independent Technology Readiness Assessment (ACAT ID only)
(if required by the office of the Director, Defense Research and Engineering)
|
This Instruction
|
MS B
MS C
|
Information Support Plan (ISP) (All IT-including NSS)
|
DoD Directive 4630.05 (Reference (ak))
DoD Instruction 4630.8 (Reference (al))
|
Program Initiation for Ships (Initial ISP)
MS B (Initial ISP)
CDR (Revised ISP) (unless waived)
MS C (ISP of Record)
|
IT and NSS Joint Interoperability Test Certification (All IT-including NSS)
|
Chairman of the Joint Chiefs of Staff Manual 3170.01 (Reference (am))
CJCSI 6212.01 (Reference (an))
Reference (ak)
|
Full-Rate Production DR (or Full Deployment DR)
|
IUID Implementation Plan
|
DoD Instruction 8320.04 (Reference (ao))
|
MS A (summarized in SEP)
MS B (annex to SEP)
MS C (annex to SEP)
|
LCSP
(part of Acquisition Strategy)
|
This Instruction
|
MS B
MS C
Full-Rate Production DR
|
Life-Cycle Signature Support Plan
|
DoD Directive 5250.01 (Reference (ap))
|
MS A (summarized in TDS)
Program Initiation for Ships
MS B
MS C (updated as necessary)
|
Net-Centric Data Strategy (Approach summarized in TDS and detailed in ISP)
|
Reference (l)
|
MS A
Program Initiation for Ships
MS B
MS C
|
Operational Test Agency Report of Operational Test and Evaluation Results
|
This Instruction
|
MS B
MS C
Full-Rate Production DR
|
PDR Report
|
This Instruction
|
MS B
Post-PDR Assessment if PDR is conducted after MS B
|
Post-CDR Report
|
This Instruction
|
Post-CDR Assessment
|
Program Deviation Report
|
This Instruction
|
Immediately upon a program deviation
|
Program Protection Plan (PPP) (for programs with critical program information) (includes Anti-Tamper Annex) (also summarized in the Acquisition Strategy)
|
Reference (m)
|
MS A (CPI stated in TDS)
MS B
MS C
|
Spectrum Supportability Determination (applicable to all systems/equipment that use the electromagnetic spectrum in the U.S. and in other host nations)
|
DoD Directive 4650.1, Reference (aq)
|
MS B
MS C
|
System Threat Assessment Report (STAR)
- validated by Defense Intelligence Agency (DIA) for ACAT ID programs)
- validated by DoD Components for ACAT IC programs
- Programs on the DOT&E Oversight List require a STAR regardless of ACAT designation
(MAIS programs use the DIA validated Information Operations Capstone Threat Assessment)
|
This Instruction
DoD Directive 5105.21 (Reference (ar))
Reference (q)
DIA Instruction 5000.002 (Reference (as))
|
Program Initiation for Ships
MS B
MS C
|
System Threat Assessment (STA)
- validated by DoD Components for ACAT II programs
(AIS programs may use the DIA validated Information Operations Capstone Threat Assessment)
|
This Instruction
Reference (ar)
Reference (q)
Reference (as)
|
MS B
MS C
|
Systems Engineering Plan
|
This Instruction
|
MS A
MS B
MS C
|
TDS
(ACAT II and below)
|
This Instruction
|
MS A
|
Technology Readiness Assessment
|
This Instruction
|
Program Initiation for Ships (preliminary assessment)
MS B
MS C
|
TEMP
|
This Instruction
|
MS B
MS C (update, if necessary)
Full-Rate Production DR (or Full Deployment DR)
|
TES
|
This Instruction
|
MS A
|