Home
DAG Tutorial
Search
Available Downloads
Feedback
The DAG does not reflect the changes in the DoDI5000.02. Work is in progress to update the content and will be completed as soon as possible.
Jump to Content
Jump to Navigation and Tools
Help
.
ACC Practice Center
>
AT&L Knowledge Management...
>
Welcome to the Defense...
>
Chapter 9 -- Test and...
>
9.8. Best Practices
View History
9.8. Best Practices
Topic
JavaScript is currently disabled. Some advanced features may not be supported.
Please wait while we load the requested content.
List of All Contributions at This Location
Rss Link
Show All
|
Filtered By
No items found.
Popular Tags
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
Chapter 2 -- Program Strategies
Chapter 3 -- Affordability and...
3.0. Overview
3.1. Life-Cycle Costs/Total Ownership...
3.2. Affordability
3.3. Analysis of Alternatives
3.4. Cost Estimation for Major Defense...
3.5. Manpower Estimates
3.6. Major Automated Information Systems...
3.7. Principles for Life-Cycle Cost...
Chapter 4 -- Systems Engineering
Chapter 5 -- Life-Cycle Logistics
5.0. Overview
5.1. Life-Cycle Sustainment in the...
5.2. Applying Systems Engineering to...
5.3. Supportability Design...
5.4. Sustainment in the Life-Cycle...
5.5. References
Chapter 6 -- Human Systems Integration...
6.0. Overview
6.1. Total System Approach
6.2 HSI - Integration Focus
6.3. Human Systems Integration Domains
6.3.4. Human Factors Engineering (HFE)
6.4. Human Systems Integration (HSI)...
6.5. Manpower Estimates
6.6. Additional References
Chapter 7 -- Acquiring Information...
Chapter 8 -- Intelligence Analysis...
8.0. Introduction
8.1. Threat Intelligence Support
8.2. Signature and other Intelligence...
8.3. Support to the Intelligence...
Chapter 9 -- Test and Evaluation (T&E)
9.0 Overview
9.1 OSD T&E Organization
9.2 Service-Level T&E Management
9.3 Test and Evaluation
9.3.3 Live Fire Test and Evaluation
9.4 Integrated Test and Evaluation
9.5 Test and Evaluation Planning
9.6 T&E Reporting
9.7 Special Topics
9.7.5 Testing in a Joint Operational...
9.7.6 Information Assurance Testing
9.8. Best Practices
9.9. Prioritizing Use of Government Test...
Chapter 10 -- Decisions Assessments and...
Chapter 11 -- Program Management...
Chapter 12 - Defense Business System...
Chapter 13 -- Program Protection
13.0 Overview
13.1 The Program Protection Process
13.2 The Program Protection Plan (PPP)
13.3 Critical Program Information (CPI)...
13.4. Intelligence and...
13.5. Vulnerability Assessment
13.6. Risk Assessment
13.7. Countermeasures
13.8. Horizontal Protection
13.9. Foreign Involvement
13.10. Managing and Implementing PPPs
13.11. Compromises
13.12. Costs
13.13. Contracting
13.14. Detailed System Security...
13.15. Program Protection Plan (PPP)...
13.16. Program Protection Plan (PPP)...
Chapter 14 -- Acquisition of Services
DoD Directive 5000.01
ENCLOSURE 1 ADDITIONAL POLICY
DoD Instruction 5000.02
TABLE OF CONTENTS
Enclosure 1 -- References
Enclosure 2 -- Procedures
Enclosure 3 -- Acquisition Category...
Enclosure 4 -- Statutory and Regulatory...
Enclosure 5 -- IT Considerations
Enclosure 6 -- Integrated T&E
Enclosure 7 -- Resource Estimation
Enclosure 8 -- Human Systems Integration...
Enclosure 9 -- Acquisition of Services
Enclosure 10 -- Program Management
Enclosure 11 -- Management of Defense...
Enclosure 12 -- Systems Engineering
Recent Policy and Guidance
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All
ACC Practice Center Version
3.2
Application Build 3.2.9
Database Version 3.2.9