This Community can only improve through your valued input - provide yours today!
                                                                                                            Click Here for SharePoint 2013 Migration Information and News
Click here   image of a classical greek architecture representing DAU's strength as a business university instructing in DoD Acquisition
HomeContactAbout ACCPrivacyTutorialDoD CertificateReport an Issue  
.

GAO-13-508T, DOD Is Overcoming Long-Standing Problems, but Faces Challenges to Ensuring Its Investments Are Optimized, Apr 24, 2013

References
0
Helpful Votes
Long Description

Most of the Department of Defense's (DOD) major satellite programs are in mature phases of development, that is, the initial satellites have been designed, fabricated, and launched into orbit while additional satellites of the same design are being produced. For the portfolio of major satellite programs, new cost and schedule growth is not as widespread as it was in prior years, but DOD is still experiencing problems. For example, total program costs have increased approximately $180 million from a baseline of $4.1 billion for one of two satellite programs that are in the earlier phases of acquisition. Though satellite programs are not experiencing problems as widespread as in years past, ground control systems and user terminals in most of DOD's major space system acquisitions are not optimally aligned, leading to underutilized satellites and limited capability provided to the warfighter. For example, the development and fielding of user terminals for a Navy communications satellite program lag behind the launch of new satellites by more than a year. Additionally, the development of ground software needed to extract capabilities of new missile warning satellites is not expected to be complete until at least 2018, even though satellites are being launched. Another acquisition challenge facing DOD is the cost of launching satellites into space, which range from around $100 million to over $200 million per launch.

Web Site Address
http://www.gao.gov/products/GAO-13-508T
Benefit/Value

Space acquisition challenges

Popular Tags

Page Information

Popularity of this page:
#69 of 262 items
0 Helpful votes
At this page:
3562 Page Views 0 Pages Emailed
0 Meta-card Views 0 Attachments Downloaded
0 Relationships and Highlights 0 Videos Downloaded
ID644004
Date CreatedTuesday, April 30, 2013 10:48 PM
Date ModifiedTuesday, April 30, 2013 10:48 PM
Version Comment:

REQUEST AN ACCOUNT Benefits of Membership I Forgot My Login Information
ACC Practice Center Version 3.2
  • Application Build 3.2.9
  • Database Version 3.2.9