This Community can only improve through your valued input - provide yours today!
                                                                                                            Click Here for SharePoint 2013 Migration Information and News
Click here   image of a classical greek architecture representing DAU's strength as a business university instructing in DoD Acquisition
HomeContactAbout ACCPrivacyTutorialDoD CertificateReport an Issue  
.

protest is sustained where the record shows that the Environmental Protection Agency performed a tradeoff between two higher-rated, higher-priced quotations, but did not consider, in its tradeoff decision, the lower prices submitted by other lower-rated vendors, whose quotations were nonetheless found to be technically acceptable.

Case Studies
1
Helpful Vote
Long Description

System Engineering International, Inc. (SEI), of Frederick, Maryland, protests the issuance of a purchase order to M.C. Dean, Inc., of Dulles, Virginia, under request for quotations (RFQ) No. PROAGAS-7UPMA7, issued by the Environmental Protection Agency (EPA) for preventive maintenance services for uninterrupted power systems and power distribution units associated with EPA's information technology infrastructure. SEI challenges the evaluation of its quotation and the selection of a higher-priced quotation for the order.

Web Site Address
http://www.gao.gov/decisions/bidpro/402754.htm
Benefit/Value

Here, the contemporaneous record lacks documentation of an adequate tradeoff analysis and consideration of lower-priced, but acceptable, quotations. In this regard, the agency performed a price/technical tradeoff between only the two quotations with the highest ratings under the non-price factors. Specifically, the agency did not consider any of the satisfactory-rated quotations or SEI's marginal-rated quotation in its tradeoff analysis, even though at least three of those quotations (including SEI's) were lower in price than the awardee's quotation.

Based on this record, we find that the agency failed to conduct an adequate price/technical tradeoff and that this failure prejudiced SEI, given that its quotation was the lowest in price and might have been viewed as the best value quotation on that basis even with a marginal rating

Popular Tags

Page Information

Popularity of this page:
#185 of 557 items
1 Helpful vote
At this page:
6189 Page Views 0 Pages Emailed
0 Meta-card Views 0 Attachments Downloaded
0 Relationships and Highlights 0 Videos Downloaded
ID384896
Date CreatedThursday, July 22, 2010 1:27 PM
Date ModifiedThursday, July 22, 2010 1:27 PM
Version Comment:

REQUEST AN ACCOUNT Benefits of Membership I Forgot My Login Information
ACC Practice Center Version 3.2
  • Application Build 3.2.9
  • Database Version 3.2.9