Federal Renewable Energy Project Potential by Technology

Federal renewable energy projects vary by technology and region and align with key market drivers, including renewable energy resource strength, utility rates, and local incentives. One way a federal agency can approach its 30% by 2025 renewable energy target is by examining its inventory of real property, calculating energy use and cost at each site, and obtaining and interpreting local renewable energy resource information to identify and prioritize sites where renewable energy projects would be most cost-effective.

To help agencies develop strategies to meet their 30% by 2025 renewable energy goal, the Federal Energy Management Program (FEMP) and National Renewable Energy Laboratory (NREL) analyzed the electricity consumption at federal facilities and the levelized cost of energy (LCOE) for solar photovoltaic (PV) and wind technologies across the United States. FEMP and NREL compared solar PV and wind LCOEs to the local commercial electricity rate to calculate a spread that reflects the economic attractiveness of a given project. A positive spread indicates that the renewable energy technology has a lower LCOE than utility electricity, while a negative spread indicates the renewable energy project would be more costly than utility electricity.

The following maps and graphs illustrate electricity consumption at 7,000 covered federal facilities and the potential for renewable energy projects at these sites.

Learn more about using NREL's REopt energy-planning tool to identify and prioritize renewable energy projects.

Find out how federal agencies are making progress toward energy performance requirements.

Geographic Distribution of Electricity Consumption at Federal Facilities

FEMP and NREL mapped electricity consumption by kilowatt-hours per year at federal facilities across the United States. The states with the most federal facilities are California, Texas, New York, and Florida. The states (and district) with the most unique agencies are Maryland, California, Washington, D.C., and Virginia.

A map of the United States shows the location of federal facilities and illustrates the electricity consumption at each facility with yellow circles of varying sizes. In descending order (largest to smallest), the circles are sized to show federal facility electricity consumption greater than 300,000,000 kilowatt-hours per year, electricity consumption between 250,000,000 to 300,000,000 kilowatt-hours per year, between 200,000,000 to 250,000,000 kilowatt-hours per year, between 150,000,000 to 200,000,000 kilowatt-hours per year, between 100,000,000 to 150,000,000 kilowatt-hours per year, between 50,000,000 to 100,000,000 kilowatt-hours per year, and between 1,000,000 to 50,000,000 kilowatt-hours per year. Electricity consumption less than or equal to 1,000,000 kilowatt-hours per year is shown with a black dot.

Geographic Distribution of Solar Photovoltaic Levelized Cost of Energy–Price Spreads

Using the REopt tool, FEMP and NREL calculated LCOE for solar PV projects at federal sites. The potential solar PV systems shown are sized at the facility’s average annual electric energy load. Black dots represent a site where the cost of utility electricity is lower than the PV LCOE, indicating that installing PV may be more costly than continuing to pay for utility electricity. Colored dots represent sites where the cost of utility electricity is higher than the solar PV LCOE, indicating that installing PV may lower the life cycle cost of electricity. The size of the dot is proportionally scaled to the size of the spread.

Solar PV projects predominantly appear to be cost-effective in the southwest, where solar resource is excellent, and the northeast, where there are high electricity prices.

A map of the United States shows the location of federal facilities and illustrates the electricity consumption at each facility with yellow circles of varying sizes. In descending order (largest to smallest), the circles are sized to show federal facility electricity consumption greater than 300,000,000 kilowatt-hours per year, electricity consumption between 250,000,000 to 300,000,000 kilowatt-hours per year, between 200,000,000 to 250,000,000 kilowatt-hours per year, between 150,000,000 to 200,000,000 kilowatt-hours per year, between 100,000,000 to 150,000,000 kilowatt-hours per year, between 50,000,000 to 100,000,000 kilowatt-hours per year, and between 1,000,000 to 50,000,000 kilowatt-hours per year. Electricity consumption less than or equal to 1,000,000 kilowatt-hours per year is shown with a black dot.

Geographic Distribution of Wind Levelized Cost of Energy–Price Spreads

Using the REopt tool, FEMP and NREL calculated LCOE for wind projects at federal sites. The potential wind systems shown are sized at the facility’s average annual electric energy load. Black dots represent a site where the cost of utility electricity is lower than the wind LCOE, indicating that installing wind may be more costly than continuing to pay for utility electricity. Colored dots represent sites where the cost of utility electricity is higher than the wind LCOE, indicating that installing wind may lower the life cycle cost of electricity. The size of the dot is proportionally scaled to the size of the spread.

Wind projects are more cost-effective in the plains, where there is ample wind resource, in the northeast, where there are high electricity prices, and in California, which has a combination of adequate wind resource and high electricity prices.

A map of the United States shows the location of federal facilities and illustrates the wind levelized cost of energy versus the commercial electricity rate at each facility (in dollars per kilowatt-hour). In descending order (largest to smallest), blue circles represent federal sites where the utility electricity cost is higher than the wind levelized cost of energy in ratios of 0.60 to 0.82, 0.40 to 0.60, 0.20 to 0.40, 0.10 to 0.20, and 0 to 0.10. A ratio of utility electricity cost less than or equal to 0 is shown with a black dot.

Levelized Cost of Energy–Price Spreads by Project Capacity

At the 2014 national average commercial electricity price of $0.1075/kWh, solar PV projects are generally cost-effective (within $0.05/kWh of the average commercial electricity price) at all capacities. Many wind projects show a negative spread at low capacities, but have a higher probability of being cost-effective above 1,500 kW.

Two graphs show solar photovoltaic  and wind levelized cost of energy price spreads (in dollars per kilowatt-hour) by renewable energy project capacity (in kilowatts). Photovoltaic projects generally show a positive spread, or greater cost of utility electricity relative to photovoltaic electricity, at capacities from 1 kilowatt to 5,000 kilowatts. Wind projects generally show a positive spread, or greater cost of utility electricity relative to wind electricity, at capacities from 1,500 kilowatts to 5,000 kilowatts.