{ "optimizationMetrics": { "facilityUtilization": { "fy18OMBtarget": 80.00, "fy16Planned": 33, "fy17Planned": 45, "fy18Planned": 80 }, "energyMetering": { "fy18OMBtarget": 100, "fy16Planned": 100, "fy17Planned": 100, "fy18Planned": 100 }, "pue": { "fy18OMBtarget": 1.5, "fy16Planned": 1.6, "fy17Planned": 1.6, "fy18Planned": 1.5 }, "virtualization": { "fy18OMBtarget": 4, "fy16Planned": 5, "fy17Planned": 4, "fy18Planned": 4 }, "tieredServerUtAutoMonitoring": { "fy18OMBtarget": 65, "fy16Planned": 0, "fy17Planned": 25, "fy18Planned": 65 }, "nontieredServerUtAutoMonitoring": { "fy18OMBtarget": 65, "fy16Planned": 0, "fy17Planned": 20, "fy18Planned": 65 } }, "tieredClosures": { "fy18OMBtarget": 0, "fy16Planned": 0, "fy17Planned": 0, "fy18Planned": 0 }, "nontieredClosures": { "fy18OMBtarget": 0, "fy16Planned": 1, "fy17Planned": 19, "fy18Planned": 0 }, "costSavings": { "fy18OMBtarget": 0, "fy16Planned": 0, "fy17Planned": 0, "fy18Planned": 0, "costsOfClosures": "EPA’s costs for data center closures are attributable to making necessary investments in plan and design activities, upgrades to data center facilities (uninterruptable power supply, power distribution unit and computer room cooling equipment) and infrastructure (circuits and switches).", "costsOfOptimization": "EPA’s costs for optimizing data centers are associated with investments in labor necessary to customize software and reports for server utilization and automated monitoring. Other costs include investments in required purchases to implement proven data center optimization techniques such as cold aisle containment, modified floor tiles and standard rack implementation.", "historicalCostSavings": "Data center closure projects from 2010 through 2015 were managed to reduce costs for space, leases, utilities, and server equipment. The related project costs included the same types of closure and optimization costs listed above." } }