United States Nuclear Regulatory Commission - Protecting People and the Environment

ROP Action Matrix Summary and Current Regulatory Oversight

The assessment program collects information from inspections and performance indicators (PIs) in order to enable the agency to arrive at objective conclusions about the licensee's safety performance. Based on this assessment information, the NRC determines the appropriate level of agency response, including supplemental inspection and pertinent regulatory actions ranging from management meetings up to and including orders for plant shutdown. The Action Matrix Summary listed below reflects overall plant performance and is updated regularly to reflect inputs from the most recent performance indicators and inspection findings. Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.

For those plants that are in the Regulatory Response Column, Degraded Cornerstone Column, Multiple/Repetitive Degraded Cornerstone Column, and Unacceptable Performance Column of the Action Matrix, notes are provided to explain the assessment inputs that direct the associated regulatory response. Additionally, information on the current level of inspection at each reactor unit (based on deviations from the Action Matrix, supplemental inspection status, etc.) is also found below. For any licensee in the Licensee Response Column, the expected agency inspection is the baseline program.

The cross-cutting issues are available on the ROP Cross Cutting Issues Summary page for each of the plants.

Last Modified: 01-04-2017

Current Regulatory Oversight Table

Region I | Region II | Region III | Region IV | Action Matrix Summary

Top of page Region I

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Beaver Valley 1 Licensee Response Column

Baseline inspection
Beaver Valley 2 Licensee Response Column

Baseline inspection
Calvert Cliffs 1 Licensee Response Column

Baseline inspection
Calvert Cliffs 2 Licensee Response Column

Baseline inspection
FitzPatrick Licensee Response Column

Baseline inspection
Ginna Regulatory Response Column

Ginna is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2016.
Baseline inspection

and

IP 95001 supplemental inspection
Hope Creek 1 Licensee Response Column

Baseline inspection
Indian Point 2 Licensee Response Column

Baseline inspection
Indian Point 3 Licensee Response Column

Baseline inspection
Limerick 1 Licensee Response Column

Baseline inspection
Limerick 2 Licensee Response Column

Baseline inspection
Millstone 2 Licensee Response Column

Baseline inspection
Millstone 3 Licensee Response Column

Baseline inspection
Nine Mile Point 1 Licensee Response Column

Baseline inspection
Nine Mile Point 2 Licensee Response Column

Baseline inspection
Oyster Creek Licensee Response Column

Baseline inspection
Peach Bottom 2 Licensee Response Column  Baseline inspection
Peach Bottom 3 Licensee Response Column  Baseline inspection
Pilgrim 1 Multiple/Repetitive Degraded Cornerstone Column

Pilgrim is in Column 4 because of one parallel white inspection finding for a white performance indicator in the Initiating Events Cornerstone originating in 3Q2013, one parallel white inspection finding for a white performance indicator in the Initiating Events Cornerstone originating in 4Q2013, and an additional white inspection finding in the Mitigating Systems Cornerstone originating in 1Q2015, resulting in Pilgrim meeting the criteria for a repetitive degraded cornerstone.
Baseline Inspection

and

IP 95003 supplemental inspection
Salem 1 Licensee Response Column

Baseline inspection
Salem 2 Regulatory Response Column

Salem Unit 2 is in Column 2 becuase of a white Performance Indicator in the Initiating Events Cornerstone originating in 2Q2016.
Baseline inspection

and

IP 95001 supplemental inspection
Seabrook 1 Licensee Response Column

Baseline inspection
Susquehanna 1 Licensee Response Column

Baseline inspection
Susquehanna 2 Licensee Response Column

Baseline inspection
Three Mile Island 1 Licensee Response Column

Baseline inspection

Top of page Region II

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Browns Ferry 1 Licensee Response Column

Baseline inspection
Browns Ferry 2 Licensee Response Column

Baseline inspection
Browns Ferry 3 Licensee Response Column

Baseline inspection
Brunswick 1 Licensee Response Column

Baseline inspection
Brunswick 2 Licensee Response Column

Baseline inspection
Catawba 1 Licensee Response Column

Baseline inspection
Catawba 2 Licensee Response Column  Baseline inspection
Farley 1 Licensee Response Column

Baseline inspection
Farley 2 Licensee Response Column

Baseline inspection
Harris 1 Licensee Response Column

Baseline inspection
Hatch 1 Licensee Response Column  Baseline inspection
Hatch 2 Licensee Response Column  Baseline inspection
McGuire 1 Licensee Response Column  Baseline inspection
McGuire 2 Licensee Response Column  Baseline inspection
North Anna 1 Licensee Response Column

Baseline inspection
North Anna 2 Licensee Response Column

Baseline inspection
Oconee 1 Licensee Response Column

Baseline inspection
Oconee 2 Licensee Response Column

Baseline inspection
Oconee 3 Licensee Response Column

Baseline inspection
Robinson 2 Licensee Response Column

Baseline inspection
Saint Lucie 1 Licensee Response Column

Baseline inspection
Saint Lucie 2 Licensee Response Column  Baseline inspection
Sequoyah 1 Licensee Response Column

Baseline inspection
Sequoyah 2 Licensee Response Column

Baseline inspection
Summer Licensee Response Column  Baseline inspection
Surry 1 Licensee Response Column  Baseline inspection
Surry 2 Licensee Response Column  Baseline inspection
Turkey Point 3 Licensee Response Column

Baseline inspection
Turkey Point 4 Licensee Response Column

Baseline inspection
Vogtle 1 Licensee Response Column

Baseline inspection
Vogtle 2 Licensee Response Column

Baseline inspection
Watts Bar 1 Licensee Response Column

Baseline inspection
Watts Bar 2 Licensee Response Column

Baseline inspection

Top of page Region III

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Braidwood 1 Licensee Response Column  Baseline inspection
Braidwood 2 Licensee Response Column

Baseline inspection
Byron 1 Licensee Response Column  Baseline inspection
Byron 2 Licensee Response Column

Baseline inspection
Clinton Licensee Response Column

Baseline inspection
D.C. Cook 1 Licensee Response Column  Baseline inspection
D.C. Cook 2 Licensee Response Column  Baseline inspection
Davis-Besse Regulatory Response Column

Davis-Besse is in Column 2 because of a white Performance Indicator in the Initiating Events Cornerstone originating in 1Q2016.
Baseline inspection

and

IP 95001 supplemental inspection
Dresden 2 Licensee Response Column

Baseline inspection
Dresden 3 Licensee Response Column

Baseline inspection
Duane Arnold Licensee Response Column

Baseline inspection
Fermi 2 Licensee Response Column

Baseline inspection
LaSalle 1 Licensee Response Column

Baseline inspection
LaSalle 2 Licensee Response Column

Baseline inspection
Monticello Regulatory Response Column

Monticello is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 4Q2016.
Baseline inspection

and

IP 95001 supplemental inspection
Palisades Licensee Response Column

Baseline inspection
Perry 1 Licensee Response Column

Baseline inspection
Point Beach 1 Licensee Response Column

Baseline inspection
Point Beach 2 Licensee Response Column

Baseline inspection
Prairie Island 1 Licensee Response Column

Baseline inspection
Prairie Island 2 Licensee Response Column

Baseline inspection
Quad Cities 1 Licensee Response Column  Baseline inspection
Quad Cities 2 Licensee Response Column  Baseline inspection

Top of page Region IV

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Arkansas Nuclear 1 Multiple/Repetitive Degraded Cornerstone Column

ANO Unit 1 is in Column 4 because of a yellow finding in the Initiating Events Cornerstone originating in 1Q2014, a yellow finding in the Mitigating Systems Cornerstone originating in 3Q2014, and a greater-than-green finding in the Security Cornerstone originating in 1Q2014.
Baseline inspection

and

IP 95003 supplemental inspection
Arkansas Nuclear 2 Multiple/Repetitive Degraded Cornerstone Column

ANO Unit 2 is in Column 4 because of a yellow finding in the Initiating Events Cornerstone originating in 1Q2014, a yellow finding in the Mitigating Systems Cornerstone originating in 3Q2014, and a greater-than-green finding in the Security Cornerstone originating in 1Q2014.
Baseline inspection

and

IP 95003 supplemental inspection
Callaway Licensee Response Column

Baseline inspection
Columbia Generating Station Licensee Response Column

Baseline inspection
Comanche Peak 1 Licensee Response Column

Baseline inspection
Comanche Peak 2 Licensee Response Column

Baseline inspection
Cooper Licensee Response Column

Baseline inspection
Diablo Canyon 1 Licensee Response Column

Baseline inspection
Diablo Canyon 2 Regulatory Response Column

Diablo Canyon 2 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 3Q2016.
Baseline inspection

and

IP 95001 supplemental inspection
Fort Calhoun Licensee Response Column

Baseline inspection
Grand Gulf 1 Regulatory Response Column

Grand Gulf is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 3Q2016.
Baseline inspection

and

IP 95001 supplemental inspection
Palo Verde 1 Licensee Response Column

Baseline inspection
Palo Verde 2 Licensee Response Column

Baseline inspection
Palo Verde 3 Licensee Response Column

Baseline inspection
River Bend 1 Licensee Response Column

Baseline inspection
South Texas 1 Licensee Response Column  Baseline inspection
South Texas 2 Licensee Response Column  Baseline inspection
Waterford 3 Licensee Response Column

Baseline inspection
Wolf Creek 1 Licensee Response Column

Baseline inspection


Top of page  Action Matrix Summary

Licensee Response Column Regulatory Response Column Degraded Cornerstone Column Multiple/Repetitive Degraded Cornerstone Column Unacceptable Performance Column
Beaver Valley 1 Davis-Besse   Arkansas Nuclear 1  
Beaver Valley 2 Diablo Canyon 2   Arkansas Nuclear 2  
Braidwood 1 Ginna   Pilgrim 1  
Braidwood 2 Grand Gulf 1      
Browns Ferry 1 Monticello      
Browns Ferry 2 Salem 2      
Browns Ferry 3        
Brunswick 1        
Brunswick 2        
Byron 1        
Byron 2        
Callaway        
Calvert Cliffs 1        
Calvert Cliffs 2        
Catawba 1        
Catawba 2        
Clinton        
Columbia Generating Station        
Comanche Peak 1        
Comanche Peak 2        
Cooper        
D.C. Cook 1        
D.C. Cook 2        
Diablo Canyon 1        
Dresden 2        
Dresden 3        
Duane Arnold        
Farley 1        
Farley 2        
Fermi 2        
FitzPatrick        
Fort Calhoun        
Harris 1        
Hatch 1        
Hatch 2        
Hope Creek 1        
Indian Point 2        
Indian Point 3        
LaSalle 1        
LaSalle 2        
Limerick 1        
Limerick 2        
McGuire 1        
McGuire 2        
Millstone 2        
Millstone 3        
Nine Mile Point 1        
Nine Mile Point 2        
North Anna 1        
North Anna 2        
Oconee 1        
Oconee 2        
Oconee 3        
Oyster Creek        
Palisades        
Palo Verde 1        
Palo Verde 2        
Palo Verde 3        
Peach Bottom 2        
Peach Bottom 3        
Perry 1        
Point Beach 1        
Point Beach 2        
Prairie Island 1        
Prairie Island 2        
Quad Cities 1        
Quad Cities 2        
River Bend 1        
Robinson 2        
Saint Lucie 1        
Saint Lucie 2        
Salem 1        
Seabrook 1        
Sequoyah 1        
Sequoyah 2        
South Texas 1        
South Texas 2        
Summer        
Surry 1        
Surry 2        
Susquehanna 1        
Susquehanna 2        
Three Mile Island 1        
Turkey Point 3        
Turkey Point 4        
Vogtle 1        
Vogtle 2        
Waterford 3        
Watts Bar 1        
Watts Bar 2        
Wolf Creek 1        

Top of pageTop of Page


Last modification: Jan 04, 2017